New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS 1039729 & 1043890) PIN 5019.17, Contract.

Slides:



Advertisements
Similar presentations
PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
Advertisements

County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
District 4 Sign Assessment and Replacement Design- Build Project Request for Qualifications Information Meeting April 17 th, 2007.
TH 5 Mississippi River Bridge Design-Build Project S.P
Local Agency Bridge (LABP) Program Overview Informational Presentation – January 7, 2011 Carol Olsen, ODOT LGS Bridge Program Manager Local.
Capital Improvements Management Services Department
TH 169 & I-494 Interchange Design-Build Project S.P January 27, 2010 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
TH 610 Design-Build Project S.P February 25, 2009 Dan W. Penn, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING Looking TH 169.
TH 55 Mill and Overlay Design-Build Project S.P
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
Oklahoma Department of Transportation Susan McClune Regulatory Services.
New York State Department of Transportation Rochester Station PIN , Contract DH34463 Design-Build Project Request for Qualifications Informational.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028) Saratoga, Warren, and Washington Counties.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Enterprise Content Management Pre-Proposal Conference for RFP No. ISD2006ECM-SS December 6, 2006 California Administrative Office of the Courts Information.
Chapter 3 Project Initiation
US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,
Bidder’s Conference January 7, 2014 State of Vermont Agency of Human Services Pharmacy Benefits Management (PBM) RFP.
Kosciuszko Bridge Project Draft Request for Qualifications Informational Meeting New York State Department of Transportation January 10, 2013.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project PIN , Contract No. D Town of Babylon, Suffolk County.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 146 Over the Mohawk River Design-Build Project PIN , Contract No. D Town of Niskayuna, Schenectady.
New York State Department of Transportation
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
New York State Department of Transportation
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges Over Route 80 Town of Tully, New York Region 3 PIN , Contract No. D Onondaga.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION SR 427 over Chemung River Design-Build Project PIN , Contract No. D Town of Chemung, Chemung County.
New York State Department of Transportation
New York State Department of Transportation
1. Review of RFP Project Goals RFP Time Line Project Schedule RFP Type Project Budget 2. Questions? 3. Tour of New Site 4. Tour of Existing Facilities.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-190 & NY Rt. 265 Over NY Power Authority Reservoir Design-Build Project Draft Request for Proposals RFP Informational.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements At Various Locations in Regions 2 & 9 PIN , Contract No. D
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Ohio River Bridges Project
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Outreach Meetings 1063 Capitol Way Block Replacement Project September 26, 2013 (Olympia) September 30, 2013 (Seattle)
NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 Route 111 to Mount Pleasant Road Design-Build Project Request for Qualifications Informational.
Highway Utility Engineer, INDOT
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure (4) and Bridge (3) Replacements At Various Locations in Region 9 PIN , Contract No. D
Request For Qualifications (RFQ) Missouri Local Programs How to Complete the RFQ & Get it Advertised.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 8 Bundled Bridges (Columbia & Dutchess Counties) PIN 8BOW.0A, Contract No. D Draft Request for.
Washington Street Boat Landing Pergola Restoration Design-Build Project Design-Build RFQ – Pre-Submittal Meeting Jeff Lundstrom, SDOT Project Manager February.
Pre-Proposal Conference Welcome! New York State Department of Transportation Conference Room A/B 50 Wolf Road May 30, :00 PM to 3:30 PM JOB ORDER.
Proposed Sale Notice (PSN) and Request For Interest (RFI) for New York BOEM NEW YORK TASK FORCE MEETING APRIL 28, 2016 Erin C. Trager New York Project.
6/9/20161 Pre-Proposal Conference Engineering Supportive Services Program (ESSP) Request For Proposals NYSDOT Regions 8, 10 & 11.
IAS Pre-proposal Conference NOVEMBER 2, 2011 Pre-proposal Conference NOVEMBER 2, 2011 Tahoma NATIONAL CEMETERY PHASE 2 DEVELOPMENT KENT, WASHINGTON Project.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
OC Animal Care Services Design-Build RFQ Conference October 27, 2015.
IAS Pre-proposal Conference December 10, 2012 Pre-proposal Conference December 10, 2012 San Antonio bldg 1 & 4 Renovation san antonio, tx Project no: San.
PRE-PROPOSAL CONFERENCE Welcome! American Air Power Museum 1230 New Highway, East Farmingdale, New York November 14, 2012 Management, Business Development.
PRE-PROPOSAL MEETING, September 19, 2017 Contract No.:
Manual on Accommodating Utilities in Pierce County Rights-of-Way
PRE-PROPOSAL MEETING, January 25, 2018 Contract No.:
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Procurement & Strategic Sourcing
Project Manager / Utility Liaison
Presentation transcript:

New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS & ) PIN , Contract D Design-Build Project Request for Qualifications Informational Meeting January 29, 2013

I-190 & NY Rt. 265 Over NY Power Authority Reservoir Agenda Introductions and Opening Remarks Project Overview Questions and Answers

Rules of Contact Peter Russell Att: I-190 & NY Rt. 265 New York State Dept. of Transportation Contract Management Unit, Non-Engineering and Design-Build Phone: I-190 & NY Rt. 265 Over NY Power Authority Reservoir

I-190 & Rt. NY Rt. 265 Over NY Power Authority Reservoir

I-190 & NY Rt. 265 Over NY Power Authority Reservoir

I-190 & Rt. NY Rt. 265 Over NY Power Authority Reservoir

Goals: Replace Existing Superstructure, Deck, Pedestals and Bearings to achieve a Long Life, Low Maintenance Bridge Structure Repair Existing Concrete Substructure Protection of NYPA Facilities Minimize Construction Impacts on Traffic Operations Coordinate with NYPA, NYSOPR, Niagara Falls Bridge Commission Deliver Project Safely, On Schedule, On Budget, and Environmentally Compliant

I-190 & NY Rt. 265 Over NY Power Authority Reservoir General Scope of Work Demolish and Remove Existing Superstructure. Design and Construct New Deck, Superstructure, Bearings, and Pedestals. Design and Construct New Bridge and Roadway Drainage. Repair All Existing Concrete Substructures. Design and Construct new Approach Slabs. Mill and Resurface NY Rt. 265 from Rt. 31 to Rt. 104 Provide for Utility Protection and/or Relocation. Install New Traffic Signs and Pavement Markings. Restore the Site and Provide Landscaping. Provide Work Zone Traffic Protection.

I-190 & NY Rt. 265 Over NY Power Authority Reservoir General Scope of Work (cont.) Guiderail Replacement Coordination with Any Adjacent On-going Construction Projects Coordination with NY Power Authority Operations

I-190 & NY Rt. 265 Over NY Power Authority Reservoir

Procurement Schedule ActivityDue Date Issue Draft RFQJanuary 16, 2013 Pre-RFQ Informational MeetingJanuary 29, 2013 Final RFQ releasedFebruary 5, 2013 Final Date for receipt of Proposer’s questionsFebruary 19, 2013 Issue Date for Final Addendum to the RFQ and/or answers to Proposer’s questions February 25, 2013 SOQ Due DateMarch 6, 2013 Short-List announcedMarch 21,2013 Issue Draft RFPMarch 27, 2013 Draft RFP Info MeetingApril 9, 2013 Final RFP to Short-Listed TeamsApril 17, 2013 Proposal Due DateJune 5,2013 Selection/AwardJune 18,2013 Execute ContractsJuly 19, 2013 Notice to ProceedJuly 22, 2013

I-190 & NY Rt. 265 Over NY Power Authority Reservoir General Information Lump Sum Design-Build Contract Two Step Design-Build Procurement Process Project Schedule – Substantial Completion is August 2016 – There will be Intermediate Milestone dates There will be a Payment Schedule provided in the RFP Stipend Under Consideration by NYSDOT Liquidated Damages may be imposed for missed Milestones and Final Completion All Environmental Permits and ROW by NYSDOT All NYPA Permits By NYSDOT Construction Related Permits by Design-Builder

I-190 & NY Rt. 265 Over NY Power Authority Reservoir Quality Control (QC) QC is Design-Builder’s Responsibility Design-Builder shall appoint a QC Manager responsible for QC Plan for both Design and Construction Design QC shall be by the Designer in accordance with the QC Plan Construction Inspection shall be by an Independent Engineering Firm (Hired by the Design-Builder) Materials Testing shall be by an Independent Testing Firm or Laboratory (Hired by the Design-Builder) The Independent Testing Firm shall report to the Construction Inspection Firm Offsite Plant Quality Control will be performed by the Department

I-190 & NY Rt. 265 Over NY Power Authority Reservoir Quality Assurance (QA) QA is Department’s Responsibility The Department may perform QA on any of the Design-Builder’s Design or Construction Activities The Department may utilize an independent Consultant to perform QA of the Design-Builder’s Designs

I-190 & NY Rt. 265 Over NY Power Authority Reservoir SOQ Evaluation and Selection Pass/Fail Evaluation Factors – Legal – Financial – Backlog/ Capacity – Proposal Responsiveness – Vendor Responsibility Quality Evaluation Factors – Organization and Key Personnel (30%) – Experience of the Firms (25%) – Project Understanding (25%) – Past Performance (20%)

I-190 & NY Rt. 265 Over NY Power Authority Reservoir Additional Information Responses to Proposer Questions will be posted on the Department Website Additional Reference Information to be Posted on Website: Design Report, Bridge Inspection Report, “As Builts”, etc. Final Addendum will be issued by Monday, February 25, 2013 There will be a Buy America Clause There will be an Iran Divestment Act Clause There will be a DBE Participation Goal

I-190 & NY Rt. 265 Over NY Power Authority Reservoir SOQ Submission Guidelines All SOQ’s must be self-contained. Do not have links to external web sites. Any pages containing links to external sites may, at the Department’s discretion, be removed before evaluation. Must contain all information needed for evaluation. Do not “assume the Department knows” your firm and it’s experience/qualifications.

I-190 & NY Rt. 265 Over NY Power Authority Reservoir SOQ Submission Guidelines Forms Do not increase the size of the Form unless indicated on the Form. Most are set at a single page. Do not add or refer to an appendix. Do not include photographs or illustrations unless specifically indicated. Submit ALL Forms required.

I-190 & NY Rt. 265 Over NY Power Authority Reservoir SOQ Submission Guidelines If a Form has been revised, use the most recent version. Forms are designed to enable NYSDOT staff to easily identify if the revised version is being submitted. Do not use the original Form and update with changes. Do not remove headers or footers on a revised Form when submitting in the Proposal. Submitting a SOQ with either of the above will result in a phone call from NYSDOT requesting the correct Revised Form.

I-190 & NY Rt. 265 Over NY Power Authority Reservoir Project Website

Peter Russell Att: I-190 & NY Rt. 265 Over NY Power Authority Reservoir New York State Dept. of Transportation Contract Management Unit, Non-Engineering and Design-Build Phone: I-190 & NY Rt. 265 Rules of Contact

I-190 & NY Rt. 265 Over NY Power Authority Reservoir Questions and Answers 1.Question: Could you please send me a copy of the most recent Bridge Inspection reports for the bridges (BINs & ) involved in this D-B project. Answer: Bridge Inspection reports have been placed on the Project web site. 2.Question: Does the I-190/Rte 265 D/B project in Lewiston/Niagara Falls have an approximate cost range specified? Answer: Refer to the Draft RFQ, Section for an anticipated maximum cost.

I-190 & NY Rt. 265 Over NY Power Authority Reservoir Questions??