Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.

Slides:



Advertisements
Similar presentations
New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
Advertisements

State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
Local Agency Bridge (LABP) Program Overview Informational Presentation – January 7, 2011 Carol Olsen, ODOT LGS Bridge Program Manager Local.
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Findings from On-site Inspection (Rt 202/US Rt 23 BRIDGE)
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore-
Concrete Overlay (Whitetopping) in MD
Supervision and Administration
STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist.
Governor’s Freight Industry Summit Draft November 12, 2012 Sandra K. Beaupre’ Wisconsin DOT Governor’s Freight Industry Summit Draft November 12, 2012.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director PIAC HAM ; PID Major Rehab - Design Build Project Letting.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
FDOT R/W Guidelines Use of License Agreements
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Transportation Planning Analysis UnitPNREC 2006 Transportation Modeling in Oregon: Overview of ODOT Statewide Integrated Model Pacific Northwest Regional.
Highway Maintenance & Rehabilitation
Bridge Maintenance and Repair.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
S.R. 49 Bridge Rehabilitation over Kankakee River Thursday, September 12, :30 p.m. Presentation Wheatfield Public Library Wheatfield, Indiana.
Office of Highway Safety Bridge Inspections Dan Walsh.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
Christine Krall, SW Region Environmental Winter 2015.
Presented to presented by Truck Size and Weight Wisconsin’s Legislative Process AASHTO Subcommittee on Highway Transport 2013 July 10 th Wilmington, NC.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Trail Funding Sources & General Information
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
OREGON ECONOMIC & BRIDGE OPTIONS STUDY The problem is not just the bridges, or the freight system, It is about Oregon’s economy and quality of life. FHWA.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Presented by: Department of Transportation - Toll Bridge Program New Benicia-Martinez Bridge Project.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
WDNR Coordination Role During Construction Environmental stewardship is incorporated from design through construction. “ The careful and responsible.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
SW Region Construction Conference February 19 th 2015 Jim Romanowski – Work Zone Engineer Traffic Section – SW Region Madison Office.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Bridge Maintenance and Inspection Responsibilities Technical.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
2007 Incident Management Summit Sri Balasubramanian Chief, Office of Emergency Management Division of Maintenance California Department Of Transportation.
Stenton Avenue Masonry Arch Rehabilitation Approaches to Historic Bridge Rehabilitation Case Study #1 Michael J. Cuddy, P.E. Principal Kara Russell Cultural.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
 Final Inspection Reminders  and  Recurring Corrective Work Items.
Port Huron, Michigan Gregg Aukeman Andrew Dobbs Adam Mueller Manuel Torreira.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Project Purpose and Objective
Ness Bridge Construction
Board of Commissioners Meeting
Walker Street Reconstruction Project 25% Design Public Hearing
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
Presentation transcript:

Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal Cover Letter

Goal of Submittal Cover Letter Improve interagency communication Standardize submittal content Establish project review expectations Ensure project timelines are met

Used for ALL DOT projects under Cooperative Agreement, including local roads, that need DNR review When should this be used?

Completed by : Anyone in need of DNR review Including: 1. REC/SWEC 2. PDS 3. Planning 4. Consultants 5. Municipalities 6.(other) Who should use this and who should submit it? Submitted to DNR Liaison by: 1. REC (or assigns) 2. Consultant Representing DOT 3. Local Program 4. Municipality (or assigns) DNR acknowledges submittal via or phone

This Wisconsin Department of Transportation, NW Region project involves routine maintenance for structure B (on State Highway 93 over the Trempealeau River), to be completed by a let construction contract (tied with state project ). [See attached project location map -Exhibit A.] The existing structure was constructed in 1977, on former County Highway A. It is not classified as structurally deficient or functionally obsolete. Routine maintenance of the structure is needed to correct problems that if left untreated will reduce the overall lifespan of the structure. The existing deck is smooth (little surface friction), with spalls and cracks. The concrete girder ends are cracked with rust staining. Both joints are leaking. Bearings are rust coated. The drainage inlets are low and present a traffic hazard. The proposed project will address the maintenance concerns and provide a better driving surface, increasing safety for the traveling public. State Highway 93 is a long truck route, making it a critical link for the local and statewide economy. The project length is restricted to the structure and approaches (approximately 350 feet). The proposed work includes a concrete deck overlay, joint replacements, bearing replacements and girder repair (limited to girders at the abutments). [See record drawing -Exhibit B.] The approaches will be evaluated for concrete approach slabs. There will be no change to the waterway. Work under the structure is limited to at the abutments. There is no work proposed at any of the piers. The existing State Highway 93 cross-section will be maintained [see attached typical sections-Exhibit C]. Construction will either be staged under traffic or with traffic detoured onto County Road A and State Highway 95. No impacts to wetlands are expected. There is no proposed fill, other than very minor blending of the shoulder material to match the minimally increased profile (approximately 1-inch) after the concrete deck overlay. Some minor roadway excavation at the abutments may be necessary to perform repairs. Best management practices will be required for protecting Trempealeau River for before, during & after construction. If wetlands are impacted it will be limited to temporary loss.