Isolation Valve Installation Readiness Trevor Smith/Mark Nichols 11 May 2010 MC 252 Incident Response.

Slides:



Advertisements
Similar presentations
Completion Agenda At the end of this presentation, you will be able to: Define completion Describe the process of completion List and define the different.
Advertisements

Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Present Procedure for cutting stuck casing on Drilling PLATFORM
Part 2.2 Well Control. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand well control.
Service Technician Training
MC 252 #1 – Macondo Prospect OCS-G Well Control Simulation Results April 29, 2010.
Short Bolting Issues John Newhouse MidCon - Arkoma.
MWCC Overview, Well Containment Operations & SIMOPS Spill Control Association of America – Annual Meeting March 20, 2014 Carmine Dulisse.
Subsea Decommissioning
© Copyright Oil Spill Response Limited. SWIS Overview Introduction to OSRL’s Subsea Services.
HP Riser Disconnect Process Flow September HP Riser Disconnect Process Flow Plan to reduce the 3,500psi to 3,000psi via hot stab.
Development of the Ballgrab Technology Concept to Assist in ROV Subsea Intervention Stephen Dunbar Cranfield University.
1 ENGINEER EQUIPMENT INSTRUCTION COMPANY MULTI-PIECE RIM.
Expect More. World’s leader in pressure technology NA Sales Training Rev B – 10/10/13.
Petroleum Engineering 406
Trouble in the Gulf Deepwater Horizon
2012 AAPL ANNUAL MEETING SPONSORS PLATINUM GOLD SILVER SAN FRANCISCO SEMINAR GOLF A wholly owned subsidiary of ExxonMobil BRONZE.
"AIR COOLER" Heat Exchanger
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
for rigging up smaller ID BOPs to a Drilling or Workover BOP Stack
GL 18-3/4” 5,000 psi Annular Blowout Preventer
Removing 36 hours from a workover Optimising rig time using LWIV & eRED technology Presented by: Andy Skinner Date: 9 th March 2011 Slide 1.
BASIC MUD LOGGING.
The Problems with Long Bolt Flanges in process pipe connections when exposed to a fire!!
1. 2 Safety work-stoppage PDO & its contractors have suffered THREE high potential incidents involving cold cutting in the last TWO months.
Offshore Safety Directive (OSD)
ADNOC Petroleum Institute Quantitative Risk Assessment in Petroleum Engineering Vision/Mission: Internationally recognized and accredited graduate petroleum.
© 2011 Chevron API 16A 3 rd Edition Summer Conference Committee Meeting 24-June-2013 API 16A Chairman: John Busby Co-Chair: Jim McCabe.
Lesson 3 The Rig - Drilling Equipment
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
Trouble in the Gulf Deepwater Horizon
Deepwater drilling challenges Gm, Drilling – murphy malaysia
Petroleum Engineering 406 Floating Drilling
MUX Control Systems. 2 Multiplex Control System 3 MUX System - Key Features Designed and tested for continuous operation in 10,000 feet of water Designed.
IRP21: It’s Almost Over 2010 ICoTA Roundtable. Driven by events Suggested by various regulatory bodies We did have a choice ‘We’ could write this or let.
MC 252 Junk Shot Peer Assist – 6 May 2010 Report of Findings 07 May 2010.
Development of understanding of pressure-flow behaviour in the MC252 system Prepared by: Trevor Hill 11 Jun ‘10.
Advancing Global Deepwater Capabilities National Ocean Industries Association Annual Conference – April 15, 2011.
PIPELINE ENGINEERING Multi-Diameter Pigging – Factors affecting the design and selection of pigging tools for multi-diameter.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Petroleum Engineering 406 Floating Drilling
COFFERDAMS UWSH MANUAL CHAPTER 16 Cofferdam Design.
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
Lecture 6 Well Drilling Fall Drilling can be at Every Corner of the Earth!
Cephas Project Management Ltd All Energy 2015 (C) Cephas Project Management Ltd1.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Introduction to Well Completions
1 Presentation to the Alaska Senate Resources Committee
for rigging up smaller ID BOPs to a Drilling or Workover BOP Stack
Health and Safety Executive Health and Safety Executive The Regulatory Framework for UCG– HSE’s perspective Tony Almond Redacted Health and Safety Policy.
M300, M300N, M300Z (2½ ”–10”) M300A (2½ ”- 4”). Modification Overview  Production began in 2000 under the Hunter name. In 2002 it was produced as the.
Well Control Rule Lakeisha Harrison, Chief, Regulations and Standards Branch, Office of Offshore Regulatory Programs, BSEE July 2016 “To promote safety,
DECAM LN2 PUMP REMOVAL - CHECKLIST
Eric Brooks Area Director, Bismarck Area Office, Region VIII
Cementing How it is Done
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Never intervene to correct obstacles without stopping the activity
Direction water flow Notes: Occupancy type is PUBLIC The WCs (toilets) are public flush valve.
Scope / History Well 25/11-G-18 was drilled nov The well has 7” Bakerweld 140 Screens and swell packers. The well is producing gas from the “heal”
SAFE WORK INSTRUCTIONS
Diversity analysis for advanced reactor design
Always think to use hands off technique.
Horizontal Installation Overview
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
New Oil and Gas Drilling and Production Technologies
Floating Head Heat Exchanger
Identify, Verify & Monitor Barriers
M200, M200N, M200Z (2½”– 10”) M200A (2½”- 4”).
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Presentation transcript:

Isolation Valve Installation Readiness Trevor Smith/Mark Nichols 11 May 2010 MC 252 Incident Response

2 Problem Statement Capping of the well with the dual ram or isolation valve assembly will require: stabbing into a flange opening which may be obstructed by debris and flowing oil and gas aligning and bolting up a flange connection which is designed for make-up on the drill floor and performing this for the first time at 5000ft water depth, suspended from a drill rig Proposal: perform onshore and/or onshore trials to maximize probability of success

MC 252 Site Overview

Top of BOP Stack

Mule Shoe Detail

Readiness Summary

Trial Objectives & Site Suitability Issue to be checked or testedOnshore Test Suitability Subsea Test Suitability Alignment pin & plug make-up risks Risk of seal damage Befit or risk from pins & plug use Mule shoe engagement with pipe debris Flange rotation & bolt release ROV tool access & function/speed ROV crew familiarization & training Rig crew familiarization &training Ability to stab with rig X Ability to keep flange alignment during make-up X Flow effect on seals XX Stabbing under flow XX

Schedule DRAFT

Other Issues Decide if trials are necessary, if so which & when Define Accountabilities Confirm ROV vessel for flange unbolting Confirm ROVs for flange make-up (DD2 or other support vessel)