LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.

Slides:



Advertisements
Similar presentations
Introduction. What is ISO14001? A documented system of all impacts a company are having on the environment. A detailed strategy to reduce these impacts.
Advertisements

Substantive Change Requesting Commission Approval of Substantive Changes at Institutions MSCHE Annual Meeting December 2009.
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Regulatory Landscape for Leased Federal Airports Archerfield Airport Community Aviation Consultation Group (AACACG) 2 November 2011 Helen Gannon Aviation.
SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
18 February Anaerobic Digestion On-farm AD Planning Permission and Environmental Permitting.
Landfill Legislation Richard Campbell. INTRODUCTION  Prior to the mid-1980's, waste disposal sites were: sites that no one wanted, ie they were holes.
Waste Management (Food Waste) Regulations 2009
The Process of Siting and Approving a New Landfill in Ontario
Our Water, Our Resource, Our Responsibility Module 5: Water Protection Unit 2: Control Measures.
40 CFR REGULATIONS FOR IMPLEMENTING PROCEDURAL PROVISIONS OF NEPA Legislative vs. Discretionary Timelines - Agency Requirements for Implementing.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Planning Permission Process and Procedures
Site Waste Management Plans Presentation – September 2009 Planning Agents’ Forum.
HERITAGE - LOCAL GOVERNMENT by Susan O’Neill. Heritage - Local Government Strategic heritage planning – identifying and listing heritage items and translating.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Engaging with Planning Agents Reform of the Planning System 30 April 2015.
Constructionsite Planning and Building Regulations Ron Gatepain.
1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.
REVISED WASTE CLASSIFICATION AND MANAGEMENT SYSTEM FOR SOUTH AFRICA National Waste Classification and Management Regulations & Standards Stakeholder Workshop.
Development Contributions Planning Agreements Environmental Planning and Assessment Act 1979 Part 4, Division 6, Subdivision 2 lindsaytaylorlawyers Level.
Development Management Objective to promote proper planning and sustainable development and adopt a pro-active approach towards development that accords.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
Overview of Land Use Compatibility between Sensitive Land Uses and Nuisance Sources Peter Piersol A&WMA/OPPI Land Use Compatibility.
Fichtner Consulting Engineers UK Covanta Energy Ltd Content of Environmental Permit Application Nick Gamble.
The Contaminated Land Regulations – Consolidated Review 21 September 2005 Craig Edwards.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Environment Protection (Waste to Resources) Policy TIANA NAIRN November 08.
Bad Neighbours (land-use conflicts) Andrew Mack – Associate Director NELA WA State Conference 3 September 2015.
New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
The new VicSmart process and provisions. What is VicSmart? VicSmart is a fast planning permit process A decision is expected to be made in 10 days All.
SEA - National plan Electricity Supply Arend Kolhoff Netherlands Commission for EIA Jordan - September 2003.
Capacity Building of Kazakhstan Aarhus Centres in Providing Access to and Exchange of Environmental Information Olga Melnik, Information and Analysis Center.
Regulatory Framework for Uranium Production Facilities in the U.S.
PLANNING, TRANSPORTATION & ESTATES WASTE PLANNING ISSUES Mark Jones Deputy Director.
Rookery South Resource Recovery Facility (RRF) Evolving List of Documents being prepared for submission to the Infrastructure Planning Commission Administration.
Environment Protection (Waste to Resources) Policy TIANA NAIRN March 2007.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
REMEDIATION OF CONTAMINATED LAND IN SOUTH AFRICA Part 8 of the Waste Act Ms Mishelle Govender Chemicals and Waste Management.
The Permitting Process under the Pollution Prevention and Control (Scotland) Regulations Ian Halliday Senior Policy Officer.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Life After Landfill – regulatory requirements Kate Hamer and Thomas Gallasch Waste to Resources, Regulation and Compliance EPA 27 th September 2007.
LOCAL AUTHORITY REGULATORY ASPECTS Paul Carroll Executive Scientific Officer Waterford County Council Integrated Constructed Wetlands Awareness Seminar.
Regulations and Best Practices January 2016
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 Ministry of Environment and Spatial Planning of Kosovo Mr. Muhamet Malsiu, Acting Head.
1 Planning 4A7 Design & the Built Environment Dept. of Civil, Structural, & Environmental John O’Connor.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Local buffer support Program
EIA approval process, Management plan and Monitoring
Disposal of used lead batteries and accumulators
SCOPE LEGISLATIVE FRAMEWORK IN TURKEY CURRENT SITUATION & INDICATORS
Landfilling in the Slovak Republic – legislation and actual situation
National Environmental Policy Act of 1969 (NEPA)
National Environmental Policy Act of 1969
Local buffer support Program
Environmental Impact Assessment (EIA) in New Brunswick
Reporting in the EIA process
Presentation transcript:

LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues and Timing for Decisions" Alex Eadie, Principal Environmental Officer Environmental Impact Assessment (EIA) Unit Assessment Branch Planning SA

PROCESSES FOR DECISION ON WASTE PROJECTS Development Assessment Commission Process Major Developments Process

DEVELOPMENT ASSESSMENT COMMISSION PROCESS Application to Council DAC is authority for waste applications Schedule 8 of Development Regulations - Activity of environmental significance (refers to schedule 21) - Activity of Major Environmental significance (refers to schedule 22) Schedule (3) composting, organic fertiliser and soil conditioner works >20 tonnes/year Schedule (3) Waste or recycling depot - 6(3) Composting works > 200 tonnes/year Requires referral to EPA

SCHEDULE 5 OF DEVELOPMENT ACT REGULATIONS REQUIREMENTS FOR PLANS AND SPECIFICATIONS Site plans – location of proposed development, position and dimensions of proposed and existing structures, topographical features, levels and slope of land, drainage, effluent disposal, internal layout Plan or description of – location relative to adjacent land, distance to nearest building, location of water bodies Detailed description of activities – methods to minimise impacts (noise, odour, fumes, dust, and other emissions), arrangement for storage, disposal of waste, stormwater and sewerage, traffic movements, hours of operation, excavations required and soil erosion control

FUNDAMENTAL INFORMATION REQUIRED Types, quantities of materials to be received Groundwater level and water quality below the site and requirements for lining and leachate collection (organics recycling and processing facilities) Impacts on amenity – odour, noise, dust – may include need for modelling Landscaping and decommissioning re-vegetation Visual impacts Buffers Draft Environmental Management Plan Refer to Planning SA and EPA guidelines

SUMMARY OF MAJOR DEVELOPMENT ASSESSMENT PROCESS ENVIRONMENTAL IMPACT ASSESSMENT PROCEDURE (cont) AUTHORITY (Cont) DEVELOPMENT ASSESSMENT COMMISSION Decision on Appropriate Level of Assessment (e.g. EIS, PER, RD) Preparation of Guidelines MINISTER Declaration as a Major Development

SUMMARY OF MAJOR DEVELOPMENT ASSESSMENT PROCESS ENVIRONMENTAL IMPACT ASSESSMENT PROCEDURE (cont) AUTHORITY MINISTER (Consultation and Assessment) EIS, PER, RD Prepared by proponent Document released for public comment Comments provided to proponent

SUMMARY OF MAJOR DEVELOPMENT ASSESSMENT PROCESS ENVIRONMENTAL IMPACT ASSESSMENT PROCEDURE (cont) AUTHORITY (Cont) MINISTER (Consultation and Assessment) Response prepared by proponent Assessment Report prepared and released to the public by Minister GOVERNOR (Decision) Decision made by Governor

WHAT IS THE NATURE OF APPROVAL? Relates to the project and plans that were assessed and these are referenced in the decision notice Approval runs with the land Any departures from the assessed and approved development may require additional approval In terms of DAC process – decision can be made under delegation or may need to go to full DAC In terms of Major Developments process - Governor delegates decision on minor amendments to DAC - if amendments affect the substance of development, may need Amended EIS, PER, RD and decision by Governor

PROCESS TAKES TIME Has to fit in with DAC fortnightly meetings – 3 months statutory, but typically 6-9 months Referral to EPA mandatory – 6 weeks for comment, may stop clock if insufficient information and EPA can direct refusal or direct conditions for activity of major environmental significance If Major Development, number of steps - Declaration - Issues Paper - Guidelines - Proponent prepares documentation - Consultation and public meeting - Response document - Assessment report - Decision by Governor and Gazettal

PROBLEMS ENCOUNTERED Unrealistic expectations on time for decision Insufficient or incorrect technical information Inconsistent information provided in application, appendices and management plans Lack of early consultation with government Design not in accordance with accepted best practice and guidelines

HOW DO WE IMPROVE PROCESS? For Planning Authority Explain process and make sure timelines and requirements of other agencies are well understood (particularly for Major Developments) Be more specific on information required (i.e. site specific boreholes to define groundwater conditions, odour modelling, noise assessment) Be aware of budgetary issues facing regional local government Consult more with proponent throughout the assessment process Following approval make sure proponent is aware of the conditions and what has to be done before construction or commencement of operations

HOW DO WE IMPROVE PROCESS? For Councils and Industry Plan well ahead of need for development or expansion Accept there is core information that is required with application – delays may occur if insufficient Significant amendment to accepted practice requires careful investigation and design and takes time to accumulate There is a process that is driven by legislation and it takes time Comply with conditions of approval and stick to commitments made in application Operate for reasonable period of time before seeking amendments – demonstrate you are a good operator

Photo courtesy WMAA

THANK YOU & QUESTIONS