Robert Pak 1 DOE VTX Review June 2, 2009 Mechanical Integration & Safety Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.

Slides:



Advertisements
Similar presentations
April 7, 2010D.R. Lynch 1 PHENIX Shutdown 2010 April 7,2010 Don Lynch.
Advertisements

3 Oct Cost and Schedule Update Craig Ogilvie, Iowa State University Analysis of system risks Update schedule  Critical path.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
1 2/11/2010 PHENIX WEEKLY PLANNING 2/11/2010 Don Lynch.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
1 12/10/2009 PHENIX WEEKLY PLANNING 12/10/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
1 3/4/2010 PHENIX WEEKLY PLANNING 3/4/2010 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
Robert Pak DOE Review Jan. 19, Robert Pak 1 DOE Review Jan. 19, 2005 VTX HBD PHENIX Central Region From VTX Proposal (dims in mm) Integrate Detector.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
Walter Sondheim 6/2/20091 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL Mechanical Project Engineer.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
Columbia University IN THE CITY OF NEW YORK FVTX Electronics Oversight and Integration Eric J. Mannel Columbia University.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Robert Pak, FVTX Annual Review, Nov WBS Mechanical Integration Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
Installation of the T600 at Fermilab CSN2, September 22,
Preparations for Run 6 Don Lynch February 13, 2006.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/31/2009 Don Lynch.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
1 1/28/2010 PHENIX WEEKLY PLANNING 1/28/2010 Don Lynch.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
PHENIX WEEKLY PLANNING 2/16/06 Don Lynch. Prep for Run 6 Completed.
1 2/4/2010 PHENIX WEEKLY PLANNING 2/4/2010 Don Lynch.
VTX readiness for RUN15 Y. Akiba.
as a prototype for Super c-tau factory
Presentation transcript:

Robert Pak 1 DOE VTX Review June 2, 2009 Mechanical Integration & Safety Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief Engineer Robert Pak: Integration Manager

Robert Pak 2 DOE VTX Review June 2, 2009 Outline Mechanical Integration: Assembly plan (WBS 1.5.3) under development Beam pipe (WBS ) procurement in progress Detector support (WBS ) started in FY09 Power & water in IR (WBS ) progress off project External cooling system (WBS ) start in FY10 Infrastructure for dry N 2 system completed Safety: 1 st ESRC meeting for VTX/FVTX on June 11 th

Robert Pak 3 DOE VTX Review June 2, 2009 Assembly procedure overview 3 Main assembly L3/L4 assemblyL1/L2 assembly

Robert Pak 4 DOE VTX Review June 2, 2009 Stripixel ladder installation on layer #4

Robert Pak 5 DOE VTX Review June 2, 2009 Stripixel layer #4 on transport frame

Robert Pak 6 DOE VTX Review June 2, 2009 Gas enclosure placed in support truss Details in HPS on VTX TWiki

Robert Pak 7 DOE VTX Review June 2, 2009 Space frame installed into support truss

Robert Pak 8 DOE VTX Review June 2, 2009 Barrel layer #4 installed into space frame

Robert Pak 9 DOE VTX Review June 2, 2009 Barrel layers #1&2 installed into space frame Details in HPS on VTX TWiki

Robert Pak 10 DOE VTX Review June 2, 2009 Be beam pipe final CAP from Brush Wellman Smaller dia Be section

Robert Pak 11 DOE VTX Review June 2, 2009 Off Project

Robert Pak 12 DOE VTX Review June 2, 2009 Additional stainless transitions and spools Quotes in-hand based on final drawings

Robert Pak 13 DOE VTX Review June 2, 2009 NEG coating and bake-out of beam pipe $106k for entire 47 ft warm straight section in PHENIX CAD has taken responsibility for SS sections | | | Item | Description | Price | | | | 1 | 5 m long pipe CF125/CF75 (dwg )| $23, | | | | 2 | 1.75 m conical pipe CF125/CF75 (dwg | $12, | | | ) | | | | | 3 | 0.55 m pipe CF75/CF40 (dwg | $12, | | | -part 01) | | | | | 4 | 2.03 m pipe CF75/CF40 (dwg | $12, | | | part 02) | | | | | 5 | 1.8 m long pipe, CF 125 | $12, | | | | 6 | 2.57 m long Be-section pipe, CF 35 ( dwg | $27, | | | ) | | | | Quote from SAES Getters SpA, Lainate, Italy :

Robert Pak 14 DOE VTX Review June 2, 2009 Be beam pipe Schedule VTX, FVTX, PHENIX Management & CAD signed-off Current ETA from Brush Wellman: 6 mos. to gun-drill Be tube (by mid-Oct. 2009) Final assembly and QA (by mid-Nov. 2009) Deliver to BNL and reship to Europe for NEG coating CERN to handle Be section (SAES refuses) SAES Getters does all the rest Install prior to RHIC Run-11 (summer 2010)

Robert Pak 15 DOE VTX Review June 2, 2009 External support installed Electrically isolated from central magnet pole tips Measurement of magnet vibrations proved negligible

Robert Pak 16 DOE VTX Review June 2, 2009 Single support structure attached at 3 points to west detector sled 6 degrees of adjustment East mirror images west BNL concept for support truss

Robert Pak 17 DOE VTX Review June 2, DOF (Y & Z) 1 DOF (Z) 0 DOF Kinematic mounts for mating east and west detector halves 6 interface points w/ HYTEC

Robert Pak 18 DOE VTX Review June 2, 2009 Mounts for theodolites to be installed Provide stable location above beamline to shoot targets for CAD survey

Robert Pak 19 DOE VTX Review June 2, 2009 Platform for Electronics Racks Off project Shared infrastructure for VTX/FVTX/RPC electronics

Robert Pak 20 DOE VTX Review June 2, 2009 Platform water manifolds and cable trays Platform Utilities Platform water supply & return flexible connections Photos from D. Lynch, PHENIX Chief Engineer Platform electrical distribution and disconnect Off project

Robert Pak 21 DOE VTX Review June 2, 2009 Electronics rack lay-out New Platform HBD/RXNP (not shown) MuTrgrFEE N MuTrgrFEE S VTX Power FVTX RPCS1 RPCN1 New Platform RPCNS VTX FEM CAD courtesy of D. Lynch Cooling system location under discussion

Robert Pak 22 DOE VTX Review June 2, 2009 Cooling F - Ion Extraction Test Report 10/21/2008 Dele Fayemi 3M Electronics Markets Materials Division Tel: (651) Summary Samples of 3M Novec 7000 and 7200 subjected to neutron irradiation received from Los Alamos National Laboratory were tested to determine if degradation had occurred. Decomposition was quantified through fluoride ion measurements as described in the 3M test method: “ Fluoride ion extraction – indication of thermal decomposition ”. The irradiated fluid samples showed slightly elevated, but insignificant fluoride ion levels when compared to control samples. Test Results The results of the test are given in table 1. Table 1 Interpretation The in-beam samples recorded average free fluoride ion concentration of ~0.03 ppm. Though these are elevated fluoride ion levels compared to the virgin samples, these concentrations are much less than 1 ppm and indicate insignificant degradation beam 6.7x10 11 N eq /cm 2 integrated dose from LANSCE Cooling Fluid has no problem from irradiation

Robert Pak 23 DOE VTX Review June 2, 2009 Bleed the boil-off 5200 gal. capacity LN 2 Storage Dewar for Dry Nitrogren System shared by BBC/VTX/FVTX Dry N 2 System Off project

Robert Pak 24 DOE VTX Review June 2, 2009 Safety 1 st Experimental Safety Review Committee meeting for VTX/FVTX on June 11 th Includes mechanical and electrical aspects Participation from PHENIX and CAD safety experts In preparation, separate paperwork completed for VTX & FVTX Design Review Questionnaire (14 page document) CAD Hazard Identification Tool on the internet

Robert Pak 25 DOE VTX Review June 2, 2009 Summary Mechanical Integration: Assembly plan (WBS 1.5.3) under development Beam pipe (WBS ) installed summer 2010 Detector support (WBS ) started in FY09 Power & water in IR (WBS ) progress off project External cooling system (WBS ) start in FY10 Infrastructure for dry N 2 system completed Safety: 1 st ESRC meeting for VTX/FVTX on June 11 th