Support structure working group video- meeting P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez July 15th, 2014.

Slides:



Advertisements
Similar presentations
Improving a magnetic shield: what works and what does not 26 March 2013 Kiril Marinov 1.
Advertisements

Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.

SQXF Instrumentation wires and connectors. Instrumentation & Quench heaters wires March 2014 J.C. Perez2 Instrumentation wires: AXON reference HH2619.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
SQXF Shell & Yoke Assembly Procedure
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Review of tests of superconducting magnets in SM18 - Stephane Sanfilippo AT-MTM-AS Field Quality of MQ. Measured in SM18 Presented by: Stephane Sanfilippo.
Helene Felice HQ02 Assembly status 02/28/2012. HQ02 layout COIL 16COIL 15 COIL 17COIL 20 VIEW LOOKING AT LEAD END A C BD Sector A Sector B Sector C Sector.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
Status and Highlights of the Pulsed Magnet Program as of summer 2010, mid-point in current award period Delivered 350 th science pulse > 70T in 75T magnets.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
10/28/2015Pierre Moyret1 Production of SQXF Magnet Components: Return on experience P.MOYRET EN-MME-FS.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
Triplet status and plans P. Ferracin, G. Ambrosio, M. Anerella, A. Ballarino, B. Bordini, F. Borgnolutti, R. Bossert, D. Cheng, D.R. Dietderich, B. Favrat,
Starters.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
Electricity and Magnetism
Vacuum pipe deflection Mariusz Juchno, Paolo Ferracin, Paolo Fessia 28 January, 2014.
Dan Cheng, Helene Felice HL-LHC Standards and Best Practices Workshop June 11-13, 2014 The US LARP Collaborative Effort Magnet Design and Engineering Tools,
HL-LHC Annual Meeting, KEK, 11/21/14WP3 Summary – G. Sabbi 1 Work Package 3 Summary GianLuca Sabbi, Ezio Todesco 4 th HiLumi LHC – LARP Annual Meeting.
Magnetic Fields Due to Currents JH
Dan Cheng S. Kincaide, H. Felice, X. Wang 4/23/2015 MQXFS Mechanical Interfaces (Proposed)
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
Conductor working group video-meeting P. Ferracin, S. Izquierdo Bermudez December 19, 2013.
……………..Continued Recap Grinding Machine Operations on grinding machine 1.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
E. Cavanna, M. Duret, P. Ferracin, T. Genestier, L. Grand-Clement, F. Lackner, S. Luzieux, F. Savary, S. Triquet, J.C. Perez, M. Pozzobon, H. Prin, P.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
Dan Cheng QXF Structures Working Group November 7, 2014 Implications for the split-shell MQXFS concept.
The reading is 7.38 mm. The reading is 7.72 mm.
Helene Felice Team: Dan Cheng, Daryl Horler, Paul Bish, Hugh Highley and Nate Liggins Thank you to Paolo Ferracin, Gianluca Sabbi and Franck Borgnolutti.
P. Ferracin on behalf of the MQXF collaboration
MQXF Design and Conductor Requirements
HQ02b Preload Increase - Summary
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Mechanical results on the double aperture Version V20ar
Discussion session on day 1
P. Ferracin and G. Ambrosio
Paolo Ferracin, Giorgio Ambrosio
MQXF updates P. Ferracin October 9th, 2014.
MQXF coil cross-section status
QXF schedule and milestones
Commercial Nomination 2627 East 17th Avenue
Cross-section of the 150 mm aperture case
Chapter 32 Problems 6,7,9,16,29,30,31,37.
MQXFS6 assembly and loading
Presentation transcript:

Support structure working group video- meeting P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez July 15th, 2014

Coil CAD model 15/07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 2

Magnet CAD model 15/07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 3

Cross-section 15/07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 4

Shell measurements 15/07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 5

Shell 1 15/07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 6

Shell 2 15/07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 7

Shell 3 15/07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 8

Shell 4 15/07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 9

Diameters Shell 1Shell 2Shell 3Shell4 mm ∅ av ∅1∅ ∅2∅ ∅3∅ ∅4∅ ∅5∅ /07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 10

Circularity/cylindricity Shell 1Shell 2Shell 3Shell4 mm Nominal0.100 Cylindricity Circularity Circularity Circularity Circularity Circularity /07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 11

Pin offsets Shell 1Shell 2Shell 3Shell4 mm Z+ O X- O Z- O X Z X Z /07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 12

Appendix 15/07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 13

Status on SQXF structure procurement Shell 1 15/07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 14

Status on SQXF structure procurement Shell 2 15/07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 15

Status on SQXF structure procurement Shell 3 15/07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 16

Status on SQXF structure procurement Shell 4 15/07/2014 P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez 17