SYSTEMS ANALYSIS AND DESIGN 8 TH EDITION Chapter 7 Development Strategies.

Slides:



Advertisements
Similar presentations
System Analysis and Design
Advertisements

Systems Analysis and Design 8th Edition
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
System Analysis and Design
Data and Process Modeling
Copyright © 2014 Pearson Education, Inc. 1 Managers from across organizations are involved in developing and acquiring information systems Chapter 5 -
Data and Process Modeling
Acquiring Information Systems and Applications
Systems Analysis and Design 9th Edition
Moving from Analysis to Design
Chapter 2.
CHAPTER 10 & 13 IS within the Organization & Acquiring IS and Applications.
Designing new systems or modifying existing ones should always be aimed at helping an organization achieve its goals State the purpose of systems design.
Effective systems development requires a team effort from stakeholders, users, managers, systems development specialists, and various support personnel,
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Systems Analysis and Design 9th Edition
Chapter 5.
Fundamentals of Information Systems, Second Edition
Development Strategies
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Principles of Information Systems, Sixth Edition 1 Systems Investigation and Analysis Chapter 12.
Management Information Systems, 4 th Edition 1 Chapter 16 Alternative Avenues for Systems Acquisitions.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Investigation and Analysis Chapter 12.
Introduction to Systems Analysis and Design
Design, Implementation and Maintenance
Acquiring Information Systems and Applications
Acquiring Information Systems and Applications
PHASE 3: SYSTEMS DESIGN Chapter 8 System Architecture.
Chapter Objectives Describe software trends, including the concept of software as a service Explain software acquisition alternatives, including traditional.
Chapter 5 DEVELOPMENT STRATEGIES
Chapter 6 Home Page – Welcome! To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your.
Chapter 10.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
SYS364 Evaluating Alternatives. Objectives of the Systems Analysis Phase determine, analyze, organize and document the requirements of a new information.
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 9 Introduction to Design.
Prof. Mohammad Moizuddin
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
Systems Analysis & Design 7 th Edition Chapter 6.
Chapter 16 Alternative Avenues for Systems Acquisitions
11.1 © 2007 by Prentice Hall 11 Chapter Building Information Systems.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Acquiring Information Systems and Applications
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Acquiring Information Systems and Applications
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
Acquiring Information Systems and Applications
Systems Analysis & Design (Sixth Edition) 1 Chapter 5 Development Strategies PHASE 2: SYSTEMS ANALYSIS.
Systems Analysis and Design 8 th Edition Chapter 7 Development Strategies.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 8 Moving from Analysis to Design.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Accounting Information System By Rizwan Waheed M.Com 710.
CHAPTER 13 Acquiring Information Systems and Applications.
Principles of Information Systems, Sixth Edition Systems Investigation and Analysis Chapter 12.
Developing Business/IT Solutions Chapter 12 McGraw-Hill/IrwinCopyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Systems Analysis and Design 10th Edition
Principles of Information Systems, Sixth Edition Systems Investigation and Analysis Chapter 12.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Topic 5 Development Strategies.  Describe the concept of Software as a Service  Define Web 2.0 and cloud computing  Explain software acquisition alternatives,
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 8 Moving from Analysis to Design Design Strategies.
Development Strategies
Development Strategies
Fundamentals of Information Systems, Sixth Edition
Building Information Systems
Systems analysis and design, 6th edition Dennis, wixom, and roth
Systems analysis and design, 6th edition Dennis, wixom, and roth
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Presentation transcript:

SYSTEMS ANALYSIS AND DESIGN 8 TH EDITION Chapter 7 Development Strategies

Chapter Objectives  Describe the concept of Software as a Service  Define Web 2.0 and cloud computing  Explain software acquisition alternatives, including traditional and Web-based software development strategies  Describe software outsourcing options, including offshore outsourcing and the role of service providers 2

Chapter Objectives  Explain advantages and disadvantages of in-house software development  Explain cost-benefit analysis and financial analysis tools  Explain the differences between a request for proposal (RFP) and a request for quotation (RFQ)  Describe the system requirements document 3

Chapter Objectives  Explain the transition from systems analysis to systems design, and the importance of prototyping  Discuss guidelines for systems design  Describe software development trends 4

Introduction  Chapter 7 describes the remaining activities in the systems analysis phase  The chapter also describes the transition to systems design, prototyping, and systems design guidelines  The chapter concludes with a discussion of trends in software development 5

The Impact of the Internet  Software as a Service  Software as a Service (SaaS)  25% of all new business software will be deployed as a service by 2011, while the value of the SaaS industry will grow to $40 billion 6

The Impact of the Internet  Traditional vs. Web-Based Systems Development  Traditional development System design is influenced by compatibility issues Systems are designed to run on local and wide-area company networks Systems often utilize Internet links and resources, but Web- based features are treated as enhancements rather than core elements of the design 7

The Impact of the Internet  Traditional vs. Web-Based Systems Development  Web-based development Systems are developed and delivered in an Internet-based framework such as.NET or WebSphere Internet-based development treats the Web as the platform, rather than just a communication channel Web-based software usually requires additional layers, called middleware 8

The Impact of the Internet Looking to the Future: Web 2.0 and Cloud Computing – The Web 2.0 platform will enhance interactive experiences including wikis and blogs, and social networking applications – Cloud computing could bring enormous computing power to business and personal Internet users 9

Outsourcing  The Growth of Outsourcing  A firm that offers outsourcing solutions is called a service provider  Application service providers (ASP)  Internet business services (IBS) Also called managed hosting 10

Outsourcing  Outsourcing Fees  A fixed fee model uses a set fee based on a specified level of service and user support  A subscription model has a variable fee based on the number of users or workstations that have access to the application  A usage model or transaction model charges a variable fee based on the volume of transactions or operations performed by the application 11

Outsourcing  Outsourcing Issues and Concerns  Mission-critical IT systems should be outsourced only if the result is a cost-attractive, reliable, business solution that fits the company’s long-term business strategy  Outsourcing also can affect day-to-day company operations and can raise some concerns 12

Outsourcing  Offshore Outsourcing  Offshore outsourcing – global outsourcing  Many firms are sending IT work overseas at an increasing rate  The main reason for offshore outsourcing is the same as domestic outsourcing: lower bottom-line costs  Offshore outsourcing, however, involves some unique risks and concerns 13

In-House Software Development Options  Make or Buy Decision 14

In-House Software Development Options  Developing Software In-House  Satisfy unique business requirements  Minimize changes in business procedures and policies  Meet constraints of existing systems  Meet constraints of existing technology  Develop internal resources and capabilities 15

In-House Software Development Options  Purchasing a Software Package  Lower costs  Requires less time to implement  Proven reliability and performance benchmarks  Requires less technical development staff  Future upgrades provided by the vendor  Input from other companies 16

In-House Software Development Options  Customizing a Software Package 1. You can purchase a basic package that vendors will customize to suit your needs 2. You can negotiate directly with the software vendor to make enhancements to meet your needs by paying for the changes 3. You can purchase the package and make your own modifications, if this is permissible under the terms of the software license 17

In-House Software Development Options  Creating User Applications  User application  User interface  Help desk or information center (IC)  Screen generators  Report generators  Read-only properties 18

Role of the Systems Analyst When selecting hardware and software, systems analysts often work as an evaluation and selection team The primary objective of the evaluation and selection team is to eliminate system alternatives that will not meet requirements, rank the system alternatives that are feasible, and present the viable alternatives to management for a final decision 19

Analyzing Cost and Benefits  Financial Analysis Tools  Payback Analysis  Return on investment (ROI)  Net present value (NPV) 20

Analyzing Cost and Benefits  Cost-Benefit Analysis Checklist  List each development strategy being considered  Identify all costs and benefits for each alternative. Be sure to indicate when costs will be incurred and benefits realized  Consider future growth and the need for scalability  Include support costs for hardware and software 21

Analyzing Cost and Benefits  Cost-Benefit Analysis Checklist  Analyze various software licensing options, including fixed fees and formulas based on the number of users or transactions  Apply the financial analysis tools to each alternative  Study the results and prepare a report to management 22

The Software Acquisition Process  Step 1: Evaluate the Information System Requirements  Identify key features  Consider network and web-related issues  Estimate volume and future growth  Specify hardware, software, or personnel constraints  Prepare a request for proposal or quotation Request for proposal (RFP) Evaluation model Request for quotation (RFQ) 23

The Software Acquisition Process  Step 1: Evaluate the Information System Requirements  Prepare a request for proposal or quotation Request for proposal (RFP) A written list of features and specifications given to prospective vendors before a specific product or package has been selected. Evaluation model Request for quotation (RFQ) Used to obtain a price quatation or bid on spesific product or package. 24

The Software Acquisition Process  Step 2: Identify Potential Vendors or Outsourcing Options  The Internet is a primary marketplace  Another approach is to work with a consulting firm  Another valuable resource is the Internet bulletin board system that contains thousands of forums, called newsgroups 25

The Software Acquisition Process  Step 3: Evaluate the Alternatives  Existing users  Application testing  Benchmarking - benchmark  Match each package against the RFP features and rank the choices 26

The Software Acquisition Process  Step 4: Perform Cost-Benefit Analysis  Identify and calculate TCO for each option you are considering  When you purchase software, what you are buying is a software license  If you purchase a software package, consider a supplemental maintenance agreement 27

The Software Acquisition Process  Step 5: Prepare a Recommendation  You should prepare a recommendation that evaluates and describes the alternatives, together with the costs, benefits, advantages, and disadvantages of each option  At this point, you may be required to submit a formal system requirements document and deliver a presentation 28

The Software Acquisition Process  Step 6: Implement the Solution  Implementation tasks will depend on the solution selected  Before the new software becomes operational, you must complete all implementation steps, including loading, configuring, and testing the software; training users; and converting data files to the new system’s format 29

Completion of Systems Analysis Tasks  System Requirements Document  The system requirements document, or software requirements specification, contains the requirements for the new system, describes the alternatives that were considered, and makes a specific recommendation to management  Like a contract  Format and organize it so it is easy to read and use 30

Completion of Systems Analysis Tasks  Presentation to Management  Summarize the primary viable alternatives  Explain why the evaluation and selection team chose the recommended alternative  Allow time for discussion and for questions and answers  Obtain a final decision from management or agree on a timetable for the next step in the process 31

Completion of Systems Analysis Tasks  Presentation to Management  Depending on their decision, your next task as a systems analyst will be one of the following 1. Implement an outsourcing alternative 2. Develop an in-house system 3. Purchase or customize a software package 4. Perform additional systems analysis work 5. Stop all further work 32

The Transition to Systems Design Preparing for Systems Design Tasks – It is essential to have an accurate and understandable system requirements document The Relationship between Logical and Physical Design – The logical design defines the functions and features of the system and the relationships among its components – The physical design of an information system is a plan for the actual implementation of the system 33

Systems Design Guidelines  The systems analyst must understand the logical design of the system before beginning the physical design of any one component  Systems Design Objectives  The goal of systems design is to build a system that is effective, reliable, and maintainable 34

Systems Design Guidelines  Systems Design Objectives  User Considerations Carefully consider any point where users receive output from, or provide input to, the system Anticipate future needs of the users, the system, and the organization – hard-coded Provide flexibility Parameter, default 35

Systems Design Guidelines Systems Design Objectives – Data Considerations Data should be entered into the system where and when it occurs because delays cause data errors Data should be verified when it is entered, to catch errors immediately Automated methods of data entry should be used whenever possible Access for data entry should be controlled and all entries or changes to critical data values should be reported – audit trail 36

Systems Design Guidelines  Systems Design Objectives  Data Considerations Every instance of entry and change to data should be logged Data should be entered into a system only once Data duplication should be avoided 37

Systems Design Guidelines  Systems Design Objectives  Architecture considerations Use a modular design Design modules that perform a single function are easier to understand, implement, and maintain 38

Systems Design Guidelines  Design Trade-Offs  Design goals often conflict with each other  Most design trade-off decisions that you will face come down to the basic conflict of quality versus cost  Avoid decisions that achieve short-term savings but might mean higher costs later 39

Prototyping  Prototyping Methods  System prototyping  Design prototyping  Throwaway prototyping  Prototyping offers many benefits  Consider potential problems 40

Prototyping  Prototyping Tools  CASE tools  Application generators  Report generators  Screen generators  Fourth-generation language (4GL)  Fourth-generation environment 41

Prototyping  Limitations of Prototypes  A prototype is a functioning system, but it is less efficient than a fully developed system  Systems developers can upgrade the prototype into the final information system by adding the necessary capability  Otherwise, the prototype is discarded 42

Software Development Trends  A review of current online topics being discussed in the IT community  Software quality will be more important than ever  Project management will be a major focus of IT managers 43

Software Development Trends  Many software development tools and technologies are in transition  Service-oriented architecture (SOA) Loose coupling  Growth in open-source software  Web services  Programmers will continue to use dynamic languages 44

Chapter Summary This chapter describes system development strategies, the preparation and presentation of the system requirements document, and the transition to the systems design phase of the SDLC An important trend that views software as a service, rather than a product, has created new software acquisition options Systems analysts must consider Web-based development environments 45

Chapter Summary The systems analyst’s role in the software development process depends on the specific development strategy The most important factor in choosing a development strategy is total cost of ownership (TCO) The process of acquiring software involves a series of steps A prototype is a working model of the proposed system 46

Chapter Summary  Chapter 7 complete 47

Exercise  QUESTION 1 A Company can choose either to develop its own Systems or purchase any Software packages available in the market. A Software package can be purchased from vendors or application Service provider. Briefly describe THREE (3) advantages of purchasing Software packages. (6 marks) 48

Exercise  QUESTION 2 System changeover is the process of putting the new information system online and retiring the old system. Changeover can be rapid or slow, depending on the method used. Discuss TWO (2) methods of the system changeover. (4 marks)  QUESTION 3 List and briefly explain THREE (3) common reasons for the company to do in-house development. (6 marks) 49