Vanderbilt Energy: 15,000 20,000 25,000 30,000 35,000 40,000 45,000 18,708,842 Kilowatt Hours.

Slides:



Advertisements
Similar presentations
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Advertisements

NASA AMES Research Center Utility Energy Services Contract & Project Funding Sources August 23,
The Power to Make a Difference PPL Electric Utilities April 2010.
1. 2 CASE STUDY NEW CONSTRUCTION PUBLIC SECTOR Case study by SEDAC What they got… ▪Prescriptive Incentive for individual measures. ▪They did not model.
CERT UPDATE TO GUILFORD COUNTY ENERGY AUDITS OF BELLE MEADE BUILDING BB&T BUILDING HIGH POINT COURTHOUSE & DETENTION CENTER HIGH POINT PUBLIC HEALTH BUILDING.
Energy Entrepreneurs. en·tre·pre·neur :one who organizes, manages, and assumes the risks of a business or enterprise.
AIR QUALITY SERIES S MART E NERGY U SE FOR A H EALTHIER B USINESS C LIMATE AND C LEAN A IR Utility Energy Efficiency and Conservation Programs: Present.
Variable Frequency Drives Energy Savings Applications & Benefits National Grid-NYSERDA Upstate NY Commercial Industrial Efficiency Expo March 30, 2010.
Partnership Gwinnett + Southeast Green Series- Debunking Energy Efficiency Myths: Why your bottom line depends on Energy Efficiency Property of VIS VIVA.
The Value of DOD Installation Energy Management Control Systems (EMCS) and Command Centers for Improved Operations and Increased Energy Efficiency Moderator:
Smart Devices. Smart Buildings. Smart Business The Potential for DCx Technology Enabled HVAC Operation Scot Duncan, P.E.
Variable Frequency Drives VFD Basics
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Lower Moosa Canyon. Moosa Energy Savings Kilowatts hours used; ,000kWh ,000kWh ,000kWh ,000kWh ,000kWh ,000kWh(est.)
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
University Estates Directorate Energy & Cost Savings at Oxford Philip Pike Energy Conservation Engineer Oxford University Estates Directorate.
Contemporary Engineering Economics, 4 th edition, © 2007 Life-Cycle Cost Analysis Lecture No.22 Chapter 6 Contemporary Engineering Economics Copyright.
Energy Efficient Houston Jennifer Ronk, PG, CEM, PMP.
1 Xcel Energy Webinar October 24, :30 am to 1:00 pm CT VFDs Drive Efficiency: Learn how Variable Frequency Drives can benefit your facility.
Local Government Case Study – Fairfax County Jennifer L. Gorter, PE, CEM Fairfax County Government Facilities Management Department (FMD) July 11, 2008.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
You can achieve 100% Energy Saving WHEN YOU TURN OFF THE LIGHTS.
Fairfax County’s Environmental Initiatives Kambiz Agazi June 11, 2008.
POWER SAVING BY ROCKSOLID INDUSTRIAL SOLUTIONS SYSTEMS REQUIRING PUMPS USING VALVE CONTROL SYSTEMS REQUIRING FANS USING DAMPER CONTROL SAVE GOOD $MONEY$
Oakland Schools 2010/2011 Energy Report October 28, 2011.
IntelliPool: I want to know more !  Automatic surveillance of your pool parameters  Free online acces, alerts and control of your pool  Easy to install.
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
Energy and Water Savings Presented by Bill Power Power Services, Inc San Mateo County Ag Workshop December 5, 2014.
Name of Building(s) or Project Speaker(s) Organization(s)
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Energy Conservation Physics /24/03. Reducing energy consumption may help alleviate environmental problems: Conserve fossil fuel resources Reduce.
Marriott Corporate Headquarters
Energy Conservation Initiatives Joan Kowal Energy Manager, UMCP May 1, 2008.
Serves Local Distribution Companies Manages Small Business Lighting for 18 LDCs Largest evaluator of Retrofit Programs - 26 LDCs TRC tool and support.
Energy Efficiency Solutions: Reduce Costs, Improve Infrastructure, Meet Environmental Goals Case Study: Towson University.
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
RENEWABLE ENERGY STRATEGIES FOR MANUFACTURERS BEN D.S. COLLINS RENEWABLE ENERGY DEPARTMENT SUPERVISOR
Air Conditioner Efficiency. Air Conditioner Problem Suppose an older home in San Antonio is equipped with a central air-conditioning unit with SEER rating.
RAYAN PLAST Survey Report Conducted By: Green Line Company.
Cutting Machine 22kW Survey Report Conducted By: Green Line Company.
Earth’s Changing Environment Lecture 19 Lighting Efficiency Problem.
Calculating Energy Use and Converting Units Chapter 2.
Energy Consumption Energy consumption is measured in kilowatt. hours. A kilowatt hour is the amount of energy being consumed per hour. –Energy (kwh) =
Wurster Hall MBCx Project October 30th, Project Overview Project Goals Project Objectives Identify Low Cost/No Cost Measures Identify Retrofit.
Lighting Efficiency. Lighting Efficiency Problem Suppose that 25 incandescent light bulbs rated at 100 Watt are replaced by 25 fluorescent lamps rated.
Hawaiienergy.com Graceson Ghen. hawaiienergy.com  Hawaii’s energy conservation and efficiency program  Administered by Leidos Engineering, LLC under.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
Research and Innovation in Palestine TECHNICAL WORKSHOP 30th Sep. 2015, Madrid Dr. Imad Ibrik, Director Energy Research Center at An-Najah University in.
Commercial Energy Assessments City of Ames Emily Rice The Energy Group.
Oakland Schools 2014/2015 Energy Report January 31, 2016.
1 December 8 th, 2010 CoreNet Global New York City Chapter Cutting edge energy practices for the Corporate end user Time Warner Real Estate & Facilities.
SHELTON SCHOOLS OPERATIONS. Energy and Conservation Grant Measures Look at the three main areas of impact Replace HVAC units and Controls at SHS Better.
Hawaiienergy.com Walter Enomoto Energy Efficiency Advisor Maui County.
Back to the Basics: Climate and Energy Workshop Energy Efficiency Best Practices Karalee Browne.
Robert Greenwald, P.Eng, MBA February 26, 2004
January 12, 2017.
Aircon Mechanical Systems
2017 Commercial Energy Efficiency Program
2013/2014 Energy Report January 5, 2015
Energy Savings Projects
Variable Frequency Drive Savings Calculator Tools
Energy Incentive Programs
Energy Efficiency Saves Your Business Money
Energy Saving Concepts and Opportunities in Foundry (A case Study)
NET-ZERO-ENERGY (NZE) WASTEWATER TREATMENT PLANTS (WWTPs)
Port of Seattle Clean Air Strategy
Presentation transcript:

Vanderbilt Energy: 15,000 20,000 25,000 30,000 35,000 40,000 45,000 18,708,842 Kilowatt Hours

T-8 T-12 Lighting Retrofit: “the low hanging fruit”

General Library: Energy Conservation Efforts: Lighting Retrofit & Control Replacement of Rooftop Units BAS Upgrade Energy Conservation Efforts: Lighting Retrofit & Control Replacement of Rooftop Units BAS Upgrade KWH 7%

Tennis Center:

KWH 46% fc

Student Recreation: Before After Reduced lighting energy 71.8% from: 28,000 watts to 7,896 watts

Energy Conservation Efforts: BAS-night setback implementation BAS-variable air volume tuning Energy Conservation Efforts: BAS-night setback implementation BAS-variable air volume tuning Jacobs / Featheringill KWH 15%

Energy Conservation Efforts: BAS-night setback implementation BAS-variable air volume tuning Energy Conservation Efforts: BAS-night setback implementation BAS-variable air volume tuning KWH 26% Buttrick Hall:

Energy Conservation Efforts: BAS-addition of DDC controls to the main HVAC infrastructure Addition of variable speed drives to the AHU motors Lighting Retrofit Energy Conservation Efforts: BAS-addition of DDC controls to the main HVAC infrastructure Addition of variable speed drives to the AHU motors Lighting Retrofit OGSM: KWH 30%

Night Setback On during the day Off after hours BHP 2 = 3 BHP 1 RPM 2 RPM 1 Variable Frequency Drive 40 HP reduced <10 HP OFF = 100% Energy Savings 60% 100%

High Efficiency Equipment “Maglev” Bearings High Efficiency Equipment “Maglev” Bearings

Other Project Buildings: Energy Conservation Efforts: Lighting Retrofit & Control VFD Installations Chiller Replacement BAS Upgrade Energy Conservation Efforts: Lighting Retrofit & Control VFD Installations Chiller Replacement BAS Upgrade KWH

Annual Energy Consumption Trend 15 Project Buildings Combined KWH Annual Energy Consumption Trend 15 Project Buildings Combined KWH