Agenda Introduction/presentations (5 min each) Overview of ENVIROPAK project (Prof John Taylor, UP) (20 min) Technical Annex (10 min each WP leader) –reviewing.

Slides:



Advertisements
Similar presentations
EU – ACP PROGRAMME FOR SCIENCE AND TECHNOLOGY INNOVATIONS AND CAPACITY BUILDING (PSTICB) 9 ACP RPR 61.
Advertisements

Physical properties of kafirin films Enviropak final meeting Mats Stading Katarina Nilsson Susanna Edrud Siw Kidman Annika Altskär Paola Olofsson Maria.
 Copyright 2005 Digital Enterprise Research Institute. All rights reserved. SAOR: Semantically Annotated Oncology and Radiology Progress.
Work Package 3: Phytochemical characterisation of active materials Lead partner: NRI-UOG Involved partners: RBGKEW, MUM, UZ.
ENVIROPAK 36-month final project meeting Sonya Buchner.
RISK MANAGEMENT. COORDINATOR RISKS ADMINISTRATIVE respect project agenda control over planned activities relation with the EU gathering output produced,
State of the Art in Theory and Practice of Rural Development Measures Partner 4: The University of Wales Aberystwyth.
Supported by Project Administration Second Project Meeting London, 10/11 March 2009 Liv Becker / Veit Bürger, Öko-Institut e.V.
ESSnet on SDMX phase II Dario Camol
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP 7 Scientific coordination First phase (M1-M6) QIUPING CHEN POLITECNICO DI TORINO STABLE.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Part-financed by the European Union European Regional Development Fund and European Neighbourhood and Partnership Instrument Activity reporting Baltic.
The OpenAIRE Project Open Access Infrastructure for Research in Europe Stefania Biagioni, Donatella Castelli, Paolo Manghi CNR - ISTI GL11 - Library of.
UP’s part of WP 2 The Whole Gory Story (but fortunately for all concerned in a very shortened form)
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
INTEGRATED PROJECT MUCOSAL VACCINES FOR POVERTY-RELATED DISEASES MUVAPRED MUVAPRED Project Summary Human Immunodeficiency Virus and Mycobacterium tuberculosis.
ENVIROPAK WP5. Development of coating Techniques (Maida Khan, Borges Chambal, Asmina Sulemane, Izdine Opressa, Sandra Chemane and Silvia Abdula) November.
Work plan for the upcoming year. What has been done so far Our Deliverables D2.1 Description of the constructed database, data quality and data collection.
WP 7 – Release of components from coatings to fruit and nuts Katarina Nilsson, Mats Stading, Susanna Edrud, Maria Petersson Structure and Material Design.
1 GRPE Informal Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 63 Geneva, 19 January 2012 Informal document No. GRPE (63rd GRPE, 17 -
Month 6 Meeting Dedeman Hotel, Ankara, Turkey Thursday July 7 th 2005 R ESIST V IR Co-ordination of Research on Genetic Resistance to Plant Pathogenic.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
WORK PACKAGE 6. COATING FORMULATION 10 % Kaffirin Ethanol as solvent Plasticiser mixture (1:1:1) –Polyethylene Glycol –Lactic Acid –Glycerol Relaxation.
WP 1 progress CSIR –Experimental design arranged –Raw material (pears) supply assured –Visited Capespan, Cape Town –Experimental set-up/equipment designed.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
CANDU Owners Group Inc. “Strength Through Co-operation” 1 Presentation to CNC-IAPWS May 23, 2003 AN OVERVIEW OF CANDU OWNERS GROUP R&D PROGRAM for CNC-IAPWS.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
South Hingham Study Group Scope of study – geography & topics Progress to date Goal setting.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
11 June WP4 Forum and dissemination By Kim Haugbølle, WP4 leader Forum meeting 6, DG ENTR, Brussels.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
36-month meeting Nov 24 – Cape Town SIK – IMBC – IFR – CSIR – UP – UEM – UOM ENVIROPAK Project administration Annual and final report, TIP, cost.
VIIP Proposal Preparation Workshop November 3, 2015.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 66 Geneva, 06 June 2013 Informal document No. GRPE (66th GRPE,
Part-financed by the European Union Reporting system Joint Technical Secretariat Information Seminar for Latvian Project Partners Riga, 29 April 2009.
INCO 3739 Integrating Multiple Demands on Coastal Zones with Emphasis on Aquatic Ecosystems and Fisheries Third Annual and Final Reporting 4th Project.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Prof. Dr. Bernhard Plattner.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Deliverable Status Christian Esposito University of Napoli Federico II Naples, 25th January 2011.
ICT Smartcities 2013 FP7-SMARTCITIES-2013 WP6 – Project Management OPTIMising the energy USe in cities with smart decision support system (OPTIMUS) Objective.
Tracking Trade: Creative Industries EU/SA Trade Dialogue Baseline Research.
TOK Meeting III Domenico Cotroneo University of Naples Federico II Coimbra, 30th September 2011.
Internal market, Industry, Entrepreneurship and SMEs 63rd GRB February 2016 EC study to enhance UN Regulation Nos 9, 63 and 92 with respect to sound.
Kafirin protein from sorghum: Its application as a fruit coating and new challenges S. Buchner-Rech, A. Minnaar, C. Erasmus.
Action objectives OVERALL:
Action objectives OVERALL:
M&E Task Force Meeting
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the Baltic Sea Region (BSR)
Briefing of the Project Agenda:
Learning and Teaching Tools Fuelling University Relations with Economy in Mozambique and South Africa Sept Maputo Kick-off LaTFURE 13&14 Feb 2017.
European Union – Russia Brokerage Event
2018 – 2019 Child Well-Being Community Investment Process
Portfolio Management Process & Customer Request Management
MINOR CROPS 2018 STAKEHOLDER WORKSHOP
ABI/SABMiller antitrustitalia
ASTRail project presentation
Project Management M I S S I O N WP1:
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE 802 IMT-Advanced Technology Proposal Process
Workplan and Administrative Management
Activities of ARIB on IMT Standards
WP 1 Management and Coordination
Presentation transcript:

Agenda Introduction/presentations (5 min each) Overview of ENVIROPAK project (Prof John Taylor, UP) (20 min) Technical Annex (10 min each WP leader) –reviewing Work Packages (WPs) –roles and responsibilities WP progress (15 min each WP leader) INCO DEV (Dr Janice Dewar, CSIR) (15 min) –reporting requirements –payment schedules –project meetings Next meeting – Norwich 3-5 July 2002 General

Reporting Report submitted to EC (month) Period covered (months) Report type 70-6Progress Scientific & Cost Progress Scientific & Cost Progress Scientific & Cost

Indicative dates for payments MonthDateEvent 001 Jan 2002Start of project 331 Mar 2002Payment from SIK 1931 July 2003Payment from SIK 3131 July 2004Payment from SIK ? After 38?after 28 Feb 2005 Final payment from SIK

Project meetings CSIR, SA (Jan 2002) IFR, UK (3-5 July 2002) UEM, Mozambique (Jan 2003) SIK, Sweden (June 2003) ITMC, Italy (Jan 2004) UOM, Mauritius (June 2004) UP, SA (Jan 2005)

EU INCO-DEV PROJECT ENVIRONMENT-FRIENDLY PACKAGING SOLUTIONS ENHANCED STORAGE AND QUALITY OF SOUTHERN AFRICA’S FRUIT AND NUT EXPORTS PARTNERS – SIK - Swedish Food and Biotechnology Institute – ITMC - Consiglio Nazionale delle Ricerche, Italy – IFR - Institute of Food Research, UK – CSIR - South Africa – UP - University of Pretoria, South Africa – UEM - Eduardo Mondlane University, Mozambique – UOM - University of Mauritius

Work plan  Extract kafirin protein from available sorghum bran sources  Meanwhile, investigate conditions of tropical and deciduous fruits and cashew nuts after harvest  Develop coating techniques  Evaluate quality of coated fruit and cashew nuts  Investigate release from kafirin films and thermoplastic kafirin  Test coated fruit and cashew nuts under real conditions

Work packages 1. Establishment of base-line data of fruits and cashew nuts - CSIR 2. Isolation and optimisation of protein extraction procedures, and preparation and chemical modification of film materials - UP 3. Analysis and physical properties of protein, films and coatings - IFR 4. Investigation of thermoplasticity of film materials and development of thermoplastic processing techniques - ITMC 5. Development of coating techniques for fruits and cashew nuts - UEM 6. Evaluation of the quality of coated fruits and cashew nuts – UOM 7. Investigation of release of components from coatings and films to fruit and nuts 8. Commercial testing of improved products and technology transfer - CSIR