NA62 – GTK Cooling Station 1 Main characteristics Fluid: C 6 F 14 (fluorocarbon) Operating temperature: -30 °C ÷ -10°C Temperature precision: ±1 K Temperature.

Slides:



Advertisements
Similar presentations
Chapter 12 HVAC Controls Pneumatic Control Systems • Air Compressor Stations • Transmitters and Controllers • Pneumatic Thermostats • Auxiliary Components.
Advertisements

BeginningNext SlideBack End Program AVADAL 1 of 21 SK-1 Roller Apron Segment Overview.
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
ADX 150 – Engine Repair ADX 170 – Climate Controls
André Augustinus 16 June 2003 DCS Workshop Safety.
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
Chemigation. Chemigation Chemigation is the process of applying pesticides and fertilizer through irrigation waterChemigation is the process of applying.
GNI0003H PP1 Loop Trainer. GNI0003H PP2 Reason for Study Because the Loop Trainer gives instructors the capability to control water flow, pressure and.
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
NEXT GENERATION ANTILOCK BRAKES VELAMMAL COLLEGE OF
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Pump Installation Vigyan Ashram, Pabal.
Hydronic Mechanical Controls
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
JHCBC AUTO A/C PERFORMANCE TESTING CHAPTER 3 Page
The Cooling System.
Blabo® Automated Tank Cleaning ExxonMobil 2009 Article Electrical standards Designed for operation in hazardous areas. Constructed for zone 1, and some.
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Meeting October 2004 – Coseners House.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Plan 2 – Dead-end Seal Chamber Optional Jacket
HVAC523 Basic Subsystems.
Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
V ALVES I N I NDUSTRY (P ART 1) by ANIS ATIKAH BINTI AHMAD.
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
Rod Dry Dec Training Module #6: Problem Statement Low pressure steam (1 barg) is condensed in a heat exchanger with cooling water. The exchanger.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
GTK gas coolingsystem status Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi NA62 - GTK working group meeting
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
André Augustinus 9 October 2006 Interlocks update.
XAS 375 CD6 Compressors Committed to sustainable productivity
ECS workshop, CERN, may ‘00M. Ferro-Luzzi LHCb Vertex Detector System Reminder of current VELO design Controls: Motion mechanics Vacuum system Cooling.
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Valves In Industry (Part 1)
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
IT-3963/EN Bidder’s conference Design, supply, installation and commissioning of the cooling system for the NA62 Gigatracker Tuesday 10 December 2013 Building.
Engine Brake VEB + VEB + is the name of the Volvo engine braking system and is a further development of the VEB engine brake. Engine brake VEB + consists.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
BASIC AUTOMATIC CONTROLS UNIT 16 ADVANCED AUTOMATIC CONTROLS
MECH1300 Pneumatic Components Topics Pneumatic Cylinders Pneumatic Motors Other Pneumatic Actuators Pneumatic Directional Control Valves Pneumatic Flow.
Hydraulic Pressure Control
Boiler Safety Valve Regulations
GTK Controls and Safety Thermal results with the ceramic heater Kaitlin Howell, Georg Nüßle, Paolo Petagna,
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Thermodynamics Processes.
Sequence Valves.
Forum on Tracking Detector Mechanics - Bonn, May 2016
Tracker cooling loop “check out” draft for discussion
Pneumatic schematic of the Dräger Infinity V500 intensive care ventilator. A. Gas-mixture and gas-metering assembly. Gas from the supply lines enters the.
Frese DPRV Introduction Introduction 2017.
Hydraulic Pressure Control
Cryogenic System Commissioning Summary Report
ESS elliptical cryomodule
By: JAGDEEP SANGWAN Refrigeration Basics 101.
Flow Control Valves & Pressure Relief valves
Cryogenics – The Basics
Boiler Safety Valve Regulations
Presentation transcript:

NA62 – GTK Cooling Station 1 Main characteristics Fluid: C 6 F 14 (fluorocarbon) Operating temperature: -30 °C ÷ -10°C Temperature precision: ±1 K Temperature stability: ± 0,5 K Flow rate (cooling loops): 7 ÷ 10 g/s Operating pressure: 13 bar* Tank pressure: bar Number of circuits: 3 April 10th, 2015 Maximum allowable pressure PS of the equipment in conformity with the European directive PED 97/23/EC

NA62 – GTK Cooling Station 2April 10th, 2015

NA62 – GTK Cooling Station 3 Coolant (C 6 F 14 ) characteristics Fluid: C 6 F 14 (fluorocarbon) Non-toxic Non flammable zero ozone depletion potential April 10th, 2015 Tank capacity: m3 Total amount of C 6 F 14 : m3

NA62 – GTK Cooling Station 4 Main characteristics General Safety Issues To prevent over pressure inside the circuits, when the cooling station is switched-off all valves (regulation valves, stop valves and pneumatic electro valves)/actuators are open (status normally open). So, the fluid can expand inside the tank during the warm-up (from – 25 degree up to ambient temperature). In case of over pressure due to mechanical failure of the valves, 21 pressure relief valves assure that, the pressure inside the circuits don’t exceed 13 bar. In case of leakage inside the detector, the fluid will be recovered into the return tank. This tank will be maintained in under pressure via a dedicated vacuum pump. April 10th, 2015

NA62 – GTK Cooling Station 5 Leakage inside the detector(s) In case of leakage inside the detector, the pressure (PT5101/02/03) at the inlet will decrease quickly. In this case, the cooling station control system will shut the loop(s) acting on the valve(s) GS5101/02/03 and GS5104/05/06. In case of over pressure (PT5101/02/03), the control system will stop the loop(s), acting on the valve(s) GS5101/02/03. In this case, the valve(s) GS5104/05/06 will be kept open to prevent aver pressure inside the detector. In case of low flow rate (FT5101/02/03), the control system will stop the loop(s), acting on the valve(s) GS5101/02/03. In all these scenarios, the control system will send a signal (dry contact) to the DSS and DCS. April 10th, 2015

NA62 – GTK Cooling Station 6 Detector Safety System DSS 4 inlets and 4 outlets interlocks are available to be hardwired connected to the Detector Safety System (DSS). These allow the possibility to stop the cooling on each cooling loop separately or to stop the whole cooling system on DSS request. April 10th, 2015

NA62 – GTK Cooling Station 7 Detector Control System DCS It checks the following parameters: Temperature of the coolant at the inlet (T_in); Temperature of the coolant at the outlet (T_out); Coolant flow; Pressure at the inlet and at the outlet. Meaning that if the above parameters are within the allowed ranges, the status will be OK and the cooling station runs, otherwise the cooling station or the loop(s) will be switched-off. In this case, the control system will send a signal (dry contact) to the DSS. April 10th, 2015