CONTEKST Kragujevac Nis Novi Sad BEOGRAD Pancevo Čačak Užice Subotica Valjevo Kraljevo Pirot Sombor KfW – I, II, III phase EBRD KfW – I, II phase KfW – III phase EAR DH project Zrenjanin
CONTEKST In 55 towns Installed capacity 6600 MW 16% households (400,000 flats) 40 % in Belgrade 2004 Annual heat supply 5300 GWh Average age (XII -2004) of: BOILERS30 years NETWORK25 years SUBSTATIONS25 years DHS in SERBIA
Planed investments into industrial DH systems in Serbia Mil. Euro Project from the field of reconstruction, revitalization and modernization of heat sources Projects of distribution network revitalization Project which include the revitalization of heating substations Projects concerning the increase of the heat energy consume and project of construction or replacement of existing heat sources 12.00
NIP funds planed for the acquisition of heat meters Pecinci15.753,00 euros Novi Pazar ,2 euros Jagodina ,8 euros Zajecar83.638,4 euros Trstenik91.237,6 euros
Specific project goals: The revitalization of boiler capacities. Revitalization of the DH network Modernization of heating substations
Planned activities The candidate cities are the cites which have previously asked for financial support from the Ministry of mining and energy and which have been rejected due to the restrictions of financing The cities have prepared revitalization plans, the costs are as follows: Pecinci ,00 euros Novi Pazar ,00 euros Jagodina ,00 euros Zajecar ,00 euros Trstenik ,00 euros The local DH companies will contribute to the project through the installation of the equipment through regular maintenance work carried out by their own personnel.
Planned activities The activities include: the selection of PIU which would be in charge of project implementation and securing fund allocation. Procurement of equipment for urgent measures in the DH systems Installation of the equipment Commissioning of the works Basic project lots : Needed funds ,00 euros; Own funds ,00 euros Donor funds ,00 euros Unsecured funds ,00 euros proposed project beginning– January 2008; expected duration – 12 months.
Project end user The municipalities involved in the project The ministry of mining and energy, specifically the five mentioned