CJK IMT 28 Xi’an, China 2-3 June 2011 1/n CJK IMT 28, Xi’an, China CJK-IMT28-016 Summary of AWG-10 HIROIKE, Akira

Slides:



Advertisements
Similar presentations
ITU-R activities related to TDR Colin Langtry Counsellor Radiocommunication Study Group 8 Workshop on Telecommunications for Disaster Relief, February.
Advertisements

11 Research activities on technologies for future mobile communications in Asia-Pacific region Chair TG-IMT, APT Wireless Group.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.5 – Electronic News Gathering Presenter: Andrew King on behalf of Roger Bunch.
Review of the work items of the SATRC working group on spectrum in SAP-IV 2 nd Meeting of SATRC Working Group on Spectrum in SAP-IV March 2014, Tehran,
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/4 CJK-IMT Possible contribution for Revision of Rec. ITU-R M.1580/1581 ATARASHI,
Progress report of the SATRC working group on spectrum 2 nd Meeting of SATRC Working Group on Spectrum in SAP-IV March 2014, Tehran, Iran.
DOCUMENT #:GSC15-GRSC-12 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:8 ITU preparations for WRC-12 Colin Langtry, Counsellor,
LSA in the 2.3 – 2.4 GHz band Bruno ESPINOSA, ECO Trial LSA workshop, Helsinki, 3rd September.
WMO Workshop on Radio Frequencies for Meteorology Meteorological Satellite Services David F. McGinnis U.S. Dept. of Commerce, NOAA 7 October 2002 Geneva,
PRESENTATION ON THE WORK OF WORKING GROUP 11 ON SPECTRUM MANAGEMENT EACO Seminar for Chairpersons of National Regulatory Authorities 28 May 2015 Kigali.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:
ITU-R Liaison Group Report - Session #70 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /00xx Date.
International Civil Aviation Organization REGIONAL GNSS RELATED ACTIVITIES Secretariat ICAO APAC OFFICE GNSS IMPLEMENTATION SEMINAR 26 MARCH 2012.
CJK & APT activities November 2-3, 2004 WWRF Steering Board Toronto, Canada November 2-3, 2004 WWRF Steering Board Toronto, Canada Youngkyun KIM Senior.
1 CJK9, Zhangjiajie, China (CJK B3G #20) Summary of AWF-6 (31 st March – 3 rd April, Danang, Vietnam Zhangjiajia, China 8-10 April 2009 Juyeon Song
ASIA-PACIFIC TELECOMMUNITY (APT) “Key Activities and Programs” TCT/TTA Joint Seminar “NGN Broadband Development and Implementation” 29 January 2009 By:
Sg-whitespace SubmissionRashid A. Saeed, Telekom MalaysiaSlide 1 February 2009 Slide 1 Work in the ITU: Focus on how 802 can best leverage.
Doc.: IEEE /016r0 Submission March 2003 Andy Gowans - UK RA Andy Gowans Private Business Systems Unit Radiocommunications Agency
1 ITU-R Liaison Group Report - Session #66 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0030r1.
1/6 CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China CJK-IMT Possible Contribution to 11 th Meeting of WP5D ~ Related to Report ITU-R.
7 th ITU-R WP5D Meeting Summary February 17-24, 2010 Orlett W. Pearson March 2010.
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/7 CJK-IMT Way forward on Chapter 4 of CJK White Paper by SIG-Future IMT ATARASHI,
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
CEPT positions for WRC-15 Mr. Alexander Kühn CPG-15 Chairman October 2015.
ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/4 CJK-IMT Results of 10 th Meeting of WP 5D in Are ~ WG Spectrum Aspects ~ TANNO,
11 ITU-R Liaison Group Report - Session #75 Closing Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0058.
1 ITU-R Liaison Group Report - Session #71 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127.
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
Role of World Radiocommunications Conference and European preparations for WRC Stella Lyubchenko 4 th CEPT Workshop on European Spectrum Management and.
Agenda item Allocation to the Fixed- Satellite Service in the 7 ‑ 8 GHz range Presenter: Carol Wilson (Coordinator: Kevin Knights)
INTRODUCTION TO ECC PT1 April ECC PT1 is the lead group on mobile in CEPT ECC PT1 is responsible for mobile broadband issues in CEPT CEPT preparation.
Major topics from ECC strategic plan Spectrum issues Peter Faris 4 th CEPT Workshop on European Spectrum Management and Numbering 5 th April 2016.
AI MHz MHz ECC DEC (15)01 + CEPT report 53 ECC-FCC-IC Liaison Meeting Maisons Alfort, May 2015 Didier Chauveau ECC PT1 Chairman.
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Jeju, 13 – 16 May 2013Standards for Shared ICT CJK activities on WPT Standardization Mr. YJ CHUNG (TTA) on behalf of CJK-WPT WG* Document No: GSC17-PLEN-24.
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/4 CJK-IMT Possible Contribution to 11th Meeting of WP5D ~ Related to Updating of.
Decisions of RA-15 and WRC-15 with Special Relevance to Developing Countries Решения AR-15 и ВКР-15 в особенности касающиеся развивающихся стран Иштван.
7 th ITU-R WP5D Meeting Summary February 17-24, 2010 Orlett W. Pearson March 2010 Copyright Statement. Alcatel-Lucent grants a free, irrevocable license.
ITU-R activities on WRC-19 AI 1.12
Status report on CJK NGN Working Group
Cindy Cook Chairman, TG 5/1 November 2, 2016
GSC IMT Task Force Report
SADC WRC-15 Preparatory Meeting
WRC agenda item Perspectives from APT -
ITS-Related Work Items in ITU-R Study Group 5, Working Party 5A
FSMP/ 1 Report Presentation to the ANC
Introduction to ECC PT1 February 2011.
Status report on CJK NGN Working Group
Panel Session 4 WRC-15 Agenda items 1. 2 and 1. 3 (incl
Introduction to Asia-Pacific Telecommunity (APT)
Broadband PPDR frequency situation in Europe
5G and IMT Identification - Views from CEPT-
September 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Regulatory activity above 275 GHz in.
January 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for January 2017]
Doriana Guiducci, European Communications Office
CJK B3G WG Report.
ITU Radio Issues in 2003 Progress Report ITU-R GSC /01/2019
Cindy Cook, GRSC-9 Chair, ISACC
François Rancy Director, ITU Radiocommunication Bureau
Sergio Buonomo Counselor ITU-R Study Group 5
François Rancy Director, ITU Radiocommunication Bureau
GSC IMT Task Force Report
Status report from ITU-R WP 5A on ITS activities
GSC IMT Task Force Report
Activities of ARIB on IMT Standards
GSC IMT Task Force Report
Possible Future Agenda Items
Ca-US-ECC Consultation 2012
Presentation transcript:

CJK IMT 28 Xi’an, China 2-3 June /n CJK IMT 28, Xi’an, China CJK-IMT Summary of AWG-10 HIROIKE, Akira

2/n CJK IMT 28, Xi’an, China AWG-10 Overview Date : 22 nd - 25 th March 2011 Venue : Royal Orchid Sheraton, Bangkok, Thailand Participants : Around 200 participants Note) ITU-R Regional Workshop on “IMT for Next Decade” was held in the same venue on March 21 st. AWG Structure : Plenary Spectrum WG (WG - SPEC ) Technology WG (WG - TECH ) Service and Applications WG ( WG -S & A) Spectrum arrangement &harmonization Spectrum monitoring Sub Working Groups Sharing study on IMT PPDR Task Groups BWA FSS in10-15GHz CRS/SDR IMT Task Groups ITS SRD FMC Radiocommunication convergence Task Groups Modern Satellite App Aeronautical and maritime

3/n CJK IMT 28, Xi’an, China AWG Office Bearers (as of March 2011) WG-SPEC:Mr Lewis (AVA/New Zealand ) SWG on Spectrum Arrangement and Harmonization: Ms Zhu ( MIIT/P.R.China ) SWG on Spectrum Monitoring: Mr Liu (MIIT/P.R.China) TG on Sharing Study on IMT Systems: Ms Welch (Qualcomm International/Hong Kong) TG on BWA : Dr Lim (Samsung/Republic of Korea) TG on PPDR : Mr Bhatia (Motorola India) TG on FSS Spectrum in GHz Range : Mr Seow (SES World Skies/Singapore) WG-TECH:Ms Song (Samsung/Republic of Korea) TG on SRD: Mr Uno (ATR/Japan) TG on IMT : Dr Atarashi (NTT DOCOMO/Japan) TG on CRS and SDR : Dr Lang (CATR/P.R.China) TG on ITS : Mr Oyama (Hitachi/Japan) WG-S&A:Dr Agung (Telecom Indonesia ) TG on FMC : Dr Gunawan (Telecom Indonesia) TG on Modern Satellite Applications: Ms Lee (Measat Satellite System/Malaysia) TG on Radiocommunication Convergence: Mr Li (China Unicom/P.R.China) TG on Aeronautical and Maritime Issues: Mr Gang (MIIT/P.R.China) Plenary Chair: Mr Sun (Huawei/P.R.China ) Vice chair: Dr Satoh (ARIB/Japan) Vice chair: Ms Perera (Government of New Zealand) Note: Each WG/SWG/TG has chair person only.

4/n CJK IMT 28, Xi’an, China Main Outcomes of WG-SPEC New report on “Sharing and Compatibility Studies of GSM MCBTS (Multi-Carrier Base Stations) and Adjacent Systems in the 900 MHz and 1800 MHz Bands in Asia Pacific”  Draft new report was finalized and approved by the AWG plenary. Studies on User Equipment (UE) out-of-band emission levels and implementation issues relating to usage of the band MHz by the Mobile Service, including IMT  Work on a Draft New Report that would capture results of these studies was initiated. Draft New Report will be finalized at AWG-11.  To assist the completion of the technical studies on UE out-of-band emission levels and the finalization of the Report, it was agreed to re-convene its technical correspondence group (CG) between AWG-10 and AWG-11.  It was also agreed that it would be beneficial if 3GPP were informed of the AWG studies relating to the development of UE out-of-band emission levels and the schedule/timeline for completion of these studies. 3GPP Individual Member companies participating in AWG will inform 3GPP of these AWG studies due to no document approval procedure defined for LS to 3GPP at this stage. New report on “PPDR Applications using IMT-based Technologies and Networks”  Structure of the report was updated and finalized.  It was agreed that draft new report will be finalized at AWG-13.  LS to inform ASTAP of the latest work plan and etc. on PPDR was developed and sent to ASTAP.

5/n CJK IMT 28, Xi’an, China Main Outcomes of WG-SPEC New report on “Case Studies on Typical Radio Interference, their Causes and Solutions”  Working document was updated.  Draft new report will be finalized at AWG-11. New report on “Spectrum Management and Monitoring during Major Events”  Working document was not updated due to no contribution received.  Draft new report will be finalized at AWG-11. New report on “Studies in Addressing the Inefficiency Associated with the Asymmetry of Existing Unplanned FSS Uplink/Downlink Spectrum in the GHz Band”  Working document was updated.  Work plan was reconsidered and it was decided that draft new report is to be finalized at AWG-13. Work item for SWG on SA&H  Possible work items were discussed and identified as shown below. To develop a [Recommendation/Report] on the common frequency bands for operation of short range devices To develop arrangements for the use of 5GHz bands on an unlicensed basis in line with decisions of WRC-03 to meet the needs of private broadband systems Possible development of harmonized frequency arrangements in MHz band  Input contributions to AWG-11 on the topic for consideration are expected.

6/n CJK IMT 28, Xi’an, China Main Outcomes of WG-TECH Work on Future IMT NW  This work was initiated at AWF-9 and Questionnaire to gather information was sent out to APT countries after AWF-9.  Only two responses (P.R.China and Japan) were received between AWG-9 and AWG- 10.  AWG-10 decided to re-send the same Questionnaire with notes for clarification.  Detailed review of received responses will be conducted at AWG-11.  Review of presentation materials used in ITU-R Regional Work Shop was conducted and the result of review was noted in the meeting report of TG-IMT. This will be utilized in developing the work plan on Future IMT NW in the next meeting. Work on IMT technology  New study item proposals on Adaptive Antenna Systems, Convergence of RAN, and Heterogeneous Networks (HetNet) were received from Huawei and China Unicom at AWF-9. AWF-9 carried forward these study item proposals to AWG-10 for further considerations. Questionnaire on HetNet was sent out after AWF-9.  Based on discussions about carried forward documents and other input documents to AWG-10, it was agreed to initiate a new study item on the future development of IMT technologies. The scope of this study is not limited to above three technologies.  Related work plan and possible deliverable were discussed and agreed. APT report on this study will be finalized at AWG-13.  Responses to Questionnaire on HetNet received until AWG-10 were carried forward to AWG-11 for review.

7/n CJK IMT 28, Xi’an, China Main Outcomes of WG-TECH Work on ITS  Draft new report on “The Usage of ITS in APT Countries” was finalized and approved by the AWG plenary.  It was confirmed that this new report needs to be updated based on additional information. Work on SRD  ToR of TG SRD was updated based on contribution from TG SRD chairman.  Two work plans were developed to create the following deliverables; Recommendation/Report on “The Common Frequency Bands for Operation of SRDs” Report on “Status of Introduction, Application, Issues and Technology for SRDs”  Questionnaires asking for Regulatory status for the frequency bands specified in the preliminary draft new Recommendation ITU-R SM.[SRD] Status of introduction, application, issues and technology for short range devices were developed and approved to be sent out to APT countries Work on CRS/SDR  Questionnaire on SDR & CRS was developed at AWF-9 to survey current status of service introduction/development and regulations. This was sent out to APT countries and the deadline of response submission was set to AWG-11.  Review of received responses was conducted at AWG-10.  Frame work of CRS/SDR Questionnaire report was discussed and agreed.  CRS/SDR Questionnaire report will be finalized at AWG-11.

8/n CJK IMT 28, Xi’an, China New report on “FMC Business Model”  Working document towards draft new report was updated. Some information obtained in reviewing responses to Questionnaire on Femtocell described below was added to working document.  Draft new report will be finalized at AWG-11. Work on Femtocell  Questionnaire on Femtocell to gather information was sent out to APT countries after AWF-9.  Review of received responses was conducted at AWG-10.  Working document towards draft new survey report on Femtocell, as compilation of received responses, was developed.  Draft new survey report will be finalized at AWG-11. New report on “Telecommunication-Broadcasting Convergence”  Working document towards draft new report was updated.  Draft new report will be finalized at AWG-12. Work on Machine-to-Machine(M2M) Communication  New study item proposal on M2M Communication was presented and discussed at AWF-9 and Questionnaire was sent out to APT countries after AWF-9.  Review of received responses was conducted at AWG-10.  WG agreed to initiate the new work on M2M communication and a working document towards draft new report on “Machine-to-Machine Communications Applications and Developments” was developed.  Draft new report will be finalized at AWG-13. Main Outcomes of WG-S&A

9/n CJK IMT 28, Xi’an, China Work on Modern Satellite Application  It was decided that TG-SAT has new task of developing Survey report on: –future needs of broadband communications which could be satisfied by satellite applications; –characteristics, regulatory and technical requirements of broadband satellite implementation. Report on the technical and operational studies for the efficient interoperability between satellite and terrestrial services in the area of disaster mitigation and relief. These two deliverables are to be finalized at AWG-14.  Questionnaire for survey report will be developed at AWG-11. Work on Aeronautical and Maritime issues  Draft Opinion on “The Framework for the Use of Mobile Phones Onboard Vessels” was developed. This Opinion will be finalized at AWG-11.  Draft Guidelines on “Technical Conditions for the Use of Mobile Phones Onboard Vessels” was developed. This Guideline will be finalized at AWG-11. Main Outcomes of WG-S&A

10/n CJK IMT 28, Xi’an, China General guideline on new study items  WG-TECH had discussions about general guideline on developing a new study item. General Guideline on developing a new study item at AWG –When a new study item is initiated, each deliverable should be identified with a micro workplan which includes a responsible group, the document type, the scope, the purpose, timeline and etc. –Technical discussion in relevant external organizations need to be considered in order to avoid unnecessary overlapping of work  Closing plenary approved the above guideline proposed by WG-TECH.  It was agreed that this guideline will be incorporated into the working procedure of AWG in the future. Next meeting  In closing plenary, APT secretariat tentatively announced that AWG-11 will be held during October in Thailand.  As a result of coordination after AWG-10 to avoid schedule overlapping with other meeting, AWG-11 is likely to be held during September in Thailand. Others