Project Proposal Document Optimization 15 February 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.

Slides:



Advertisements
Similar presentations
Copyright The Info-Tech Research Group Inc. All Rights Reserved. D1-1 by James M. Dutcher Strategic IT Planning & Governance Creation H I G H.
Advertisements

Presentation by Prabhjot Singh
Project Management 6e..
NEES Project Management Workshop June 16 June 18 1 Segment 2.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
Defining the Project CHAPTER FOUR Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
CMMI PMC Group Members Inam ul Haq Sajjad Raza Nabeel Azam
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Copyright  Larry Dribin, Ph.D. SE470_EngFlows_v1.ppt SE470 EngFlows - 1 Excellence in Software Engineering Repeatable Level Defined Level Manage.
Requirements Specifications Today: Homework #1 due For next class: Pressman 11; SRD Team Status Reports Requirements Process (continued) Bio Break ( 5.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Hazard Analysis and Critical Control Points
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Software Engineering Institute Capability Maturity Model (CMM)
What is Business Analysis Planning & Monitoring?
Effective Methods for Software and Systems Integration
S/W Project Management
Extreme Programming Software Development Written by Sanjay Kumar.
Condor Technology Solutions, Inc. Grace RFTS Application Extension Phase.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Software Quality Assurance Activities
Business Analysis and Essential Competencies
Project Progress Document Optimization 5 April 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.
1 Bonham, chapter 8 Knowledge Management. 2  8.1 Success Levels  8.2 Externally Focused KM  8.3 Internally Focused KM  8.4 PMO-Supported KM
Using a Project Model for Assessment of CDIO skills Tomas Svensson, Svante Gunnarsson Linköping University Sweden June
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
IT Requirements Management Balancing Needs and Expectations.
CIS 499 Senior Seminar Introduction to IT project management.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
SacProNet An Overview of Project Management Techniques.
Effective Project Management: Traditional, Agile, Extreme Presented by (facilitator name) Managing Complexity in the Face of Uncertainty Ch08: How to Close.
Quality Activity Matrix Presented by Sandra Toalston President, SanSeek 1.
Advanced Higher Computing SOFTWARE DEVELOPMENT PROCESS.
QA Methodology By Rajib Roy Independent Consultant Qcon.
University of Toronto at Scarborough © Kersti Wain-Bantin CSCC40 systems analysis 1 what is systems analysis? preparation of the system’s requirements/definition,
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
Project Status Document Optimization 22 February 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.
Project Initiation at The Regence Group 12/19/2015John Garrigues1.
Product development Engineering & Regulatory Raj Agrawal InnAccel.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Copyright 2015, Robert W. Hasker. Classic Model Gathering Requirements Specification Scenarios Sequences Design Architecture Class, state models Implementation.
Verification vs. Validation Verification: "Are we building the product right?" The software should conform to its specification.The software should conform.
Project Management PTM721S
Chapter 24: Architecture Competence
Software Verification and Validation
WORK BREAKDOWN STRUCTURE
Lecture 17 ATAM Team Expertise
Business System Development
BSA 376 Competitive Success/snaptutorial.com
BSA 376 Education for Service/snaptutorial.com
BSA 376 Teaching Effectively-- snaptutorial.com
Engineering Design Process
Project Progress Document Optimization 22 March 2007
CIS12-3 IT Project Management
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Applied Software Project Management
PSS verification and validation
Managing Project Work, Scope, Schedules, and Cost
Executive Project Kickoff
Project Coaching Steve Snelling.
Unit IV – Chapter 2 V-Test Model.
Presentation transcript:

Project Proposal Document Optimization 15 February 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes

Problem Statement Heron Consultancy Process in place to filter legal documents through lawyers Aerospace Corporation Evaluation of SysML as a Systems Engineering tool.

Background: Heron Consultancy

Current EDD Process Diagram

Statement of Work (SOW)

Develop Methodology / Process to data mine legal documents with the best lawyers and the right cost. Scope

Technical Approach Understand Problem Analyze Historical Data Develop Methodology Define/Design/Model System Verify/Validate System

Understand Problem Determine extent & nature of deviations from past trends Identify/analyze factors & conditions that allow or hinder flow of documents from one stage to the next Interview Stakeholder

Data Types: Archives of Data Sources: Heron Analyze Historical Data

Develop Methodology Create SysML Model of Current EDD Process Analyze SysML Model with historical data Create New Document Process using Autonomy Software Create New Document Process using Attenex Software Model the Implementation of an Improved EDD Process

Define / Design / Model System Define and Validate System Requirements Requires Stakeholder Input Develop Process Architecture Code / Model

Preliminary Requirements

Verification & Validation V&V is critical to User/Stakeholder acceptance of the system Verification (Did we build the thing right?) Originating and Derived Requirements must be testable / verifiable. Verification Methods: Inspection & Test Validation (Did we build the right thing?) Method: Demonstration –Validate against scenarios with known outcomes

Key Deliverables Proposal (document and presentation) Status Reports Executable Models Final Report (document and presentation)

Project Management Schedule Team Responsibilities

Top Level Schedule

Team Collaboration Group site established: Check s/group site at least once a day Set up a due date/time for each milestone

Comments/Questions? THANK YOU!