CSULA’s Energy Consumption Database Senior Design Project By: Kai Choi Subedi Bishwo 1-2 Computer Science Student
Abstract CSULA spends over $300,000 per monthon electric bill CSULA’s is consider as schedule A-3 under LADWP’s electric rates
Goal: User friendly interface, Online Meter #LocationkWh Meter # 1Parking Lot B20 Meter # 2Parking Lot C20 Meter # 3Fine Art25 Meter # 4King Hall15 Meter # 5E & T Building10 Total90
Equipments
Energy Consumption Interval, hrLoad, KW 12 AM - 4 AM200 5 AM - 6 AM500 6 AM - 9 AM AM -12 PM PM - 4 PM PM -8PM800 8 PM - 10 PM Pm - 11 PM PM - 12 AM200
Example
Project Name Energy Database and Assessment Company NameCSULA Project Lead:Kai Today's Date:11/25/2008 (vertical red line) [42]Start Date:10/10/2008(Fri) 0 WBSTasksTask LeadStartEnd Duration (Days) % Complete Working Days Days Complete Days Remaining 10 / 6 / / 13 / 0810 / 20 / 0810 / 27 / / 3 / / 10 / 0811 / 17 / 0811 / 24 / / 1 / 0812 / 8 / / 15 / 0812 / 22 / 0812 / 29 / 08 1 / 5 / 09 1 / 12 / 091 / 19 / 091 / 26 / 09 2 / 2 / 092 / 9 / 09 2 / 16 / 09 1 Fall QuarterKai 10/10/0811/26/084884% Meter Reading 10/10/0810/23/ % Proposal 10/24/0810/30/08795% Power Point 10/31/0811/13/081495% Final Fall Report 11/14/0811/27/081450% Research 10/14/0811/30/084861% Meters 10/14/0810/27/ % Electric Rates 10/28/0811/03/08775% LADWP's ELM 11/04/0811/17/081450% Metasys 11/18/0812/01/081425% Winter Qarter 11/17/082/23/09990%71099