FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June 20, 2008.

Slides:



Advertisements
Similar presentations
ICOTS HELPFUL HINTS DO NOT SHARE YOUR PASSWORD!! YOU ARE RESPONSIBLE FOR ALL INFORMATION ENTERED UNDER YOUR NAME. He who spares the guilty threatens the.
Advertisements

Welcome to WebCRD.
Page 1 of 11 Lessees can submit individual Unit Values for their Production Entities if they do not want to utilize the default unit value. If no Unit.
Creating and Submitting a Necessary Wayleave Application
Home This training presentation is designed to introduce the Residency Management Suite to new users. This presentation covers the following topics: Login.
1 of 61 EHBs v2.0 Overview Health Resources and Services Administration (HRSA) Presented To: Grantees EHBs version 2.0 – Overview for Grantees.
How to use the Student / Temporary Employee Online Time Sheet Q: When will online time sheets be used? A: Go live is September 16, Online time sheets.
Customer eForms FSA customers may download and use forms with a Level 1 eAuth account; however, obtaining a Level 2 eAuth.
This basic tutorial will take vendors step by step through the RFQ process. The tutorial will also point out many of the exciting new.
Page 1 of 21 This module will describe the procedure for a Metis Bid Request and how to upload the Metis supporting documentation. Welcome To the ETS –
Page 1 of 36 Respective of PNG Tenure Regulation Sections 19 to 23; when Crown land is leased without a producing well and is being drained by a freehold.
Welcome to the Turnitin.com Instructor Quickstart Tutorial ! This brief tour will take you through the basic steps teachers and students new to Turnitin.com.
Works Cardholder Tutorial Initial Login, Transaction Review, & Reports.
The Federal Hiring Process Using USAJOBS & Application Manager
Submitting Book Chapters via Manuscript Central A Short Guide for Wiley-VCH Authors.
Recruitment Office Procedures Job Posting Requests Creating a Search Committee –Adding Search Committee MembersAdding Search Committee Members –Designating.
PRIOS ARA Limited Agent User Instructions PRIOS ARA Limited Agent User Instructions Professional Repossessors Interactive Operating System.
Step by Step Instruction: How to Conduct Direct Certification using File Upload: SAIS IDs Released January 2014 “How to Conduct Direct Certification using.
The Online Volunteer Log (Talbot County) *Live as of February 19 th, AM.
Board of Canadian Registered Safety Professionals Certification Maintenance Online Tool BCRSP introduces a new web-based tool to assist certificate holders.
Online Reporting Guide
State of Kansas INF50 Excel Voucher Upload Statewide Management, Accounting and Reporting Tool The following Desk Aid instructs users on overall functionality.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Lead Management Tool Partner User Guide March 15, 2013
Discipline, Crime, and Violence August New DCV Application The DCV application and submission process has been revised beginning with the
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Walk Through of VEEP Online System Updated June 2015 Registering as a ‘New User’ Logging On and Reporting.
Home NEW INNOVATIONS Resident/Fellow Introduction NEW INNOVATIONS Resident/Fellow Introduction This presentation includes the following topics: Login Notifications.
Support Training Module. Support Manual 1.“On The Lot” – How it all works… 2.Craigslist Settings 3.Post to Craigslist 4.Backpage Settings 5.Post to Backpage.
RiskMeter Batch Training. Batch Tool The Riskmeter batch tool allows users to submit multiple locations all at once. The Riskmeter batch tool allows users.
Submitting Course Outlines for C-ID Designation Training for Articulation Officers Summer 2012.
HR Action Request The Ohio State University OAA HR Service Center.
Web Center Training ©2003 Optimum Technology, Inc.
Integrated Enterprise System 11/1/11Create travel expense TRIP - SAP GUI ECC 6.03 vers SAP TRIP Transaction Creating a Travel Expense Report (TER)
Franklin Twp. Youth Soccer Online Registration Tutorial.
Overview of DCPDS Regional User’s Module The purpose of this module is to allow regional DCPDS users to download their regional transaction files. Any.
What is WEBDesk? Web based claims management tool Accessible from Detailed view on all claims submitted through MediSwitch Various.
Walk Through of VEEP Online System Updated May 2011.
Pennsylvania Bar Foundation – PA IOLTA Loan Repayment Assistance Program ONLINE Application Tips & Hints.
Turn It In Getting Started. Access and click on Create an Account.
American Diploma Project Administrative Site Training.
American Diploma Project Administrative Site Training.
American Diploma Project Administrative Site Training.
American Diploma Project Administrative Site Training New Jersey.
Indiana Utility Regulatory Commission Electronic Filing System “EFS” Tutorial.
To the ETS – Metis Bid Request Online Training Course
To the ETS – Crown Mineral Activity Undisposed Crown Rights
e-TES Employee Training Guide
SUBMITTING A PAYMENT REQUEST FORM
Expense Report Training
ePAR - Secondary Assignment
c.net5 Online Management
ePAR Training Module Termination 11/9/ /9/2018
EPAR Training Module Transfer 11/9/2018 ePAR - Transfer.
EPAR Training Module Change Funding Source.
Rogers Sourcing Supplier Login Process For Returning Users
EPAR Training Module Retirement 11/20/2018 ePAR - Retirement.
ePAR - Job Attribute Change
To the ETS – Encumbrance Online Training Course
Applying for a contractor’s license online
To the ETS – Metis Bid Request Online Training Course
Welcome to WebCRD.
Welcome! Crown Mineral Activity To the ETS – Crown Mineral Activity
To the ETS – Encumbrance Online Training Course
Upload/Download Inventory
Upload/Download Inventory
Create, Upload and Use Data Extensions (Lists)
Presentation transcript:

FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June 20, 2008

FERC Order No. 698 Communication Requirements FERC Order No. 698 adopted the NAESB Standards on communication between natural gas pipelines and gas powered generators, which pipelines implemented on November 1, Spectra Energy Transmissions Gas – Electric Coordination procedures were originally posted on November 1, 2007 and were reposted on February 1, Order 698 requires pipelines and gas fired power generators to provide the following information: –Gas Fired Power Plant Operators are required to communicate material changes in circumstances that may affect hourly gas flows, to ensure that pipelines will have relevant information to run their systems. –Pipelines will confirm with gas fired plant operators as to whether flow deviations can be honored.

FERC Order No. 698 Communication Requirements Upon request by the pipeline, the Power Plant Operator will provide all the information required by Order No Spectra will issue a posting when Order No. 698 is enacted. Effective June 20, 2008 Spectra Energy has streamlined and simplified the procedure by which Power Plant Operators shall update hourly consumption profile information to Spectra Energy.

FERC Order No. 698 Communication Requirements The information can be submitted in one of two manners: –Option 1: Uploading the standardized Spectra Energy Order 698 Spreadsheet into user interface on the LINK ® system –Option 2: Manually enter data directly into the user interface on the LINK ® system. For both options, the individual uploading or entering the hourly consumption profile must have a LINK ® System logon and password. In addition, they must have adequate LINK ® privileges to view measurement information for the specified meter. –Contact your Capacity Service Account Representative or LINK ® group at if you have any questions.

FERC Order No. 698 Communication Requirements Spectra requires the hourly consumption profile information to be submitted prior to the beginning of the appropriate gas day (9:00 am Central Clock Time). The Profile shall be re-submitted to Spectra by the Power Plant Operator when material changes in hourly gas flows are anticipated for current or future gas days. Previous hour’s consumption profile will not be allowed to be altered or changed after the hour has passed. The submission of the hourly profile does not relieve operator from nominating adequate quantities to meet demand, nor does it constitute the acceptance of such profile. The following slides provide the user step by step instructions to submit hourly profile information into the LINK ® system. The procedures provided here-in are the same for all Spectra Energy pipelines.

FERC Order No. 698 Hourly Profile Instructions Select the appropriate Spectra Energy Pipeline (business unit) and Log-in

Under “Customer Activities”, “Flowing Gas”, “Measurement” Click on “Order 698 – Power Plant Profile” FERC Order No. 698 Hourly Profile Instructions

Select Date

FERC Order No. 698 Hourly Profile Instructions Select Meter Number from drop down menu. Only meters associated with your log-in will be available for selection.

FERC Order No. 698 Data Entry Option 1: Upload from Spreadsheet Click the Upload Button

Option 1: Upload from Spreadsheet If necessary, a new template can be obtained by right-clicking the Template link and click “Save Target As”. Save the file in the appropriate directory.

Option 1: Upload from Spreadsheet Click the Browse button.

Option 1: Upload from Spreadsheet Select the file from the appropriate directory and select Open. Note: This file must be the same as the Spectra Energy Order 698 template. See Appendix ‘A’ for details.

Option 1: Upload from Spreadsheet If you have multiple profiles within the file, select the appropriate worksheet to upload.

Option 1: Upload from Spreadsheet You can choose to update profile information only, contact information only or both by selecting the appropriate radio button.

Option 1: Upload from Spreadsheet When you select the submit button you have automatically updated and saved the profile. (and you are complete!)

Option 2: Enter Directly into User Interface Enter Power Plant 24-hour contact information

Option 2: Enter Directly into User Interface Enter Gas Supply contact information

Option 2: Enter Directly into User Interface Enter gas flow consumption for each hour in Dths / hr.

Option 2: Enter Directly into User Interface Click submit and you are done.

Appendix A Standardized Spreadsheet

Uploading Standardized Spreadsheet When the on-line process (Option 1) is implemented by Spectra Energy, the standardized spreadsheet will be attached on the posting on the Link ® system. Do not re-format or alter the layout of the spreadsheet (e.g. do not add or delete rows or columns within the spreadsheet). However, you can utilize typical spreadsheet functionality in each cell or elsewhere on the spreadsheet. Multiple profiles can be saved on the same spreadsheet by utilizing different worksheets. When uploading the file, ensure the correct worksheet is selected under “Worksheet”.

Click save and you are done. Enter Directly into User Interface Enter any comments in cell B48. Comments do not carry over from one day to the next. Enter hourly consumption data in Dths / hr. For example: 9:00 am is the consumption between 9:00 am to 10:00 am Enter appropriate contact information for Gas Supply and Power Plant. Meter number in spreadsheet must match the meter number selected in the user interface.

Appendix B Other Helpful Hints

FERC Order No. 698 Hourly Profile Instructions In the event the power plant will NOT have any consumption for several days, check the “No Flow Until Further Notice” box. The profile will remain zero for future days until a new profile is submitted. No profile is required to be submitted for subsequent Gas Days until flow re-commences or is expected to re-commence.

FERC Order No. 698 Hourly Profile Instructions Each Power Plant Operator can compare the total expected profile to the total scheduled quantities for the Gas Day. Note: the scheduled quantities are not Real-Time Values but are updated every 20 minutes. The quantities are approved scheduled quantities not requested quantities.

FERC Order No. 698 Hourly Profile Instructions To review the most up-to date instructions on how to submit a 698 Power Plant Profile on to the LINK ® system click the “698 Tutorial” Link.