Energy Group Kilowatt Hour Meter Date: 11/14/2011 Project Update Team Leader: Kevin Manieri Team Advisors: Dr. Fish + Tom Austin Students: Dave Allen,

Slides:



Advertisements
Similar presentations
MicroCART Micro processor C ontrolled A erial R obotics T eam Abstract MicroCART is a group of EE/CprE students tasked with developing an autonomous helicopter.
Advertisements

Team: – Brad Jensen – Will Klema – Nate Schares Client: – PowerFilm, Inc. Advisor: – Dr. Ayman Fayed Solar-Powered Mobile Power Station (MPS)
1 HON Introduction Honeywell Confidential Today’s Economic Realities Civic leaders face many issues… Improving productivity Improving safety & security.
Josiah Dobson Brett Nicholson Travis Befus Team 11.
Boeing Operations in Orange County Tom Croslin, Vice President, Southern California Engineering Design Center.
Fig. 4: Electrical System Block Diagram Digital Signage Public Alert System Emergency Messaging System for Classrooms and Frequently Populated Areas Team.
Hardware-In-The-Loop Testbed Team 186: Douglas Pence, Ken Gobin, Aaron Eaddy, Advisor Sung Yeul Park Department of Electrical and Computer Engineering,
Stand-Alone and Mesh Networks of Dissolved Oxygen (DO) Monitors Sd-May11-20 Betty Nguyen Scott Mertz David Hansen Ashley Polkinghorn Advisors Joseph Shinar.
PIC Evaluation/ Development Board Dec02-12 December 10, 2002 Client: ECpE Department Faculty Advisors: Dr. Rover, Dr. Weber Chad Berg, Luke Bishop, Tyson.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Multiple-output, Variable-output DC Power Supply May03-22 Team Members: Erik Johnson Joel Jorgensen Peter Holm Philip Schulz Clients – Prof. Patterson,
Project Manager: Rajiv Chalasani Mark Goesmann Kevin Staake David Nyman Client : Dr. Lynn Beck Department of Economics.
“Smart-grid technology starts in the home.” Understand your energy usage. Take control to save money!
Mobility Tricycle Project Disability Resources Project Update Members: Madison Brunk, Jeff Dwier, Ryan Frederick, Bobby Hall, Moses Keener, Jared.
Operating Room Instrument Rapid Delivery System sddec11-03 Group Members: Charles Ristau (Group Manager) Yik Sen Tan (Webpage Designer) Tariq Azmy (Secretary)
“Smart-grid technology starts in the home.” Understand your energy usage. Take control to save money!
Abstract Introduction Project Requirements Resources Proposed Approach and Consideration Closing Summary General Information Faculty Advisor Dr. Gerald.
. Client : Dr. Lynn Beck Department of Economics.
Next Steps. Implementation Timeline Timeline Operational & revenue goals Expenses Who does what.
SMART METER TEXAS Status Update May 5, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics –
Mathew Watkins: Project Manger Larry Wu: Hardware Engineer Eric Robbins : Software Engineer Libby John: Systems Engineer Sponsor: Jeff Smith Advisor: Dr.
SMART METER TEXAS Status Update June 3, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Pump Controller Team Number: May06-12 Team Members Dwayne Stammer CprE Francois Munyakazi EE Dan Paulsen CprE/EE Faculity Advisor Nicola Elia Client Viking.
Economic Analysis of Alternative Energy Sources Problem Statement Design for rural Iowa client Evaluate alternative energy sources - Wind - Solar - Petroleum.
Thermosyphon Design Project Energy Group - Thermosyphon Design Team.
FotoGazmic Software Project Plan Senior Project: CS 425 Spring 2003.
EMS User Group Conference – 2008 PHI EMS MIGRATION TO COMMON PLATFORM PROJECT Manley Higgins Project Manager System Operations Pepco Holdings Inc. September.
Santee Cooper Encouraging Energy Efficiency APPA National Conference June 15, 2009.
Senior Design 1 Android Pilot Nation 2.0 Team Cuckoo’s Nest –Stewart Wilson –Marshall Miller –Oliver Peery –Michael Kness University of Portland School.
WELCOME TO GREEN SOLAR ENERGY SYSTEM GREEN SOLAR ENERGY SYSTEM.
The Collaboratory Monday, January 25, What is the Collaboratory? The Collaboratory: Is an organization run by students, faculty and staff advisors.
The Collaboratory: for Strategic Partnerships and Applied Research Looking back, looking ahead August 2011 Leaders Workshop.
Collaboratory Spring 2010 Advisors Workshop. Welcome!
Knowledge Bowl System Team Fire on the Mountain: Jennifer Bond, Rob Cagan, Michael Patterson, & Jonathan Smith Faculty Advisor: Dr. Joseph Hoffbeck Dr.
EE/CS 480 Fall /29/2015 6:24:03 AM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System.
Market Systems Release Update Modifications Committee Meeting 55 June 19 th
Preliminary Design Review Your Logo Here Team Leader: Thomas C. Null, III Team Members: Andrew Tomlinson, Matthew Gunter Faculty Advisor: Dr. Roger King.
Abstract Introduction End Product & Deliverables Resources Project Requirements Team Members: Faculty Advisors: Client: Team Members: Faculty Advisors:
Software Engineering 1 Object-oriented Analysis and Design Applying UML and Patterns An Introduction to Object-oriented Analysis and Design and Iterative.
Carl Vance Combustion Air Pre-heater Design Review Presentation ME 486 3/13/03.
Q u a l i t y 1 Austin Energy Electric Service Delivery Quality Management System.
Android Multi-Meter (AMM)
Web-based Interrogation & Control of a Power Quality Data Acquisition Device.
Powerpoint Templates Page Senior Design II Mid-Semester Presentation.
 Team Elliott Heath Nick Wales University of Portland School of Engineering Faculty Advisors Dr. Crenshaw Dr. Nuxoll Industry Representative Mr. Marcos.
IMPROVING HEALTHCARE USING HEALTH INFORMATION SYSTEMS IN GUYANA An integral component of the CIDA FUNDED PUBLIC HEALTH STRENGTHENING PROJECT IN GUYANA.
Abstract Introduction Assumptions & Limitations Design Objectives Functional Requirements Design Constraints Technical Approach Measurable Milestones End.
Microeconomic Development Group Forgotten Voices Project October 17, 2011 Project Update Team Manager: Sarah Baranik Team Advisor: Jesse Schwamb Students:
Team 19 Project Br ö sel. Team Members 2/9 The Project Design Alternatives Testing Future Work Questions Team Members Nathan Leduc Electrical/Computer.
EE/CS 480/481 12/12/ :16:40 PM University of Portland School of Engineering Project Yew Inline Power Monitor with Cost Analysis Team Zubin Bagai.
MARS Taskforce COPS Update August 10, Definitions AMC – AMS (IDR) meter type settled using the 15-Minute LSE data received from TDSP AMDG – 15 Minute.
1 Austin, TX November 11 th, 2004 TX SET Update. 2 TX SET Version – 2.0A – 2.1 Discussion Topic.
TEAM PCG JANUARY PROGRAM REVIEW Garrett Gustafson (Spring Team Lead) Ben Co, Wendelin Mueller, and Julia Weimar-East Project LightBox Primary Faculty Advisor:
Stand-Alone and Mesh Networks of Dissolved Oxygen (DO) Monitors Sd-May11-20 Betty Nguyen Scott Mertz David Hansen Ashley Polkinghorn Advisors Joseph Shinar.
Problem Statement The goal of this project is to complete the basic automated functions of the Dream Green putting surface. The objective is to produce.
In today’s world of ever-increasing energy prices and environmental concerns, alternative energy sources are constantly being researched. This project.
CS-EE 481 Spring January, 2005 University of Portland School of Engineering Project Swift Fox Automotive Accelerometer & RPM Monitor Team Andrew.
Project Plan Document By: Aaron O’Banion Mark Williams Chris Cobb Todd Astroth Matt Stowe.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
Supporting quality devices
Banner Project Update for Division Deans
Nanoro HDSS, Burkina Faso Halidou TINTO, Innocent VALEA, Karim DERRA
Planetarium Resuscitation Ongo-06 May 1, 2002
Introducing Healthy Parents, Healthy Children
ECE 477 Design Review Team 8  Spring 2007
80-Hour SHARP Certification Course Schedule
How To Use 1 Delete the lines and text you don’t need 2
Convergence Bidding Working Group – 10/22/09
How To Use 1 Delete the lines and text you don’t need 2
Presentation transcript:

Energy Group Kilowatt Hour Meter Date: 11/14/2011 Project Update Team Leader: Kevin Manieri Team Advisors: Dr. Fish + Tom Austin Students: Dave Allen, Jack Geiger, Aaron Gettamy, Jon Martin, Ryan Slater, and Zach Sorrell

Objective – Design and implement a reliable and manufacturable device to measure, display, and limit AC power usage by a home or another building. Energy sharing Energy awareness Energy conservation The Project Clients: SIM (Serving In Mission) Matt Walsh Commercial Market

Jan – Site team installed solar array Mahadaga, Burkina Faso Handicapped Center Solar pump for Maternity Clinic Aug – Request by Matt Walsh Sept – Project started June 2010 – Nonfunctional prototype sent to Burkina January 2012 – Functional prototypes sent to Burkina History

4 sdfg Building hardware for KWHR Meter Version 1.2v2 Coding Software Testing Functionality Creating complete meter Current Work

Schedule - Milestones 11/14/11: Complete Enclosure/Wired boards 11/21/11: Completed electronic hardware testing of meter 11/28/11: Programming complete 12/12/11: System testing and 5 completed meters 1/2/12: Site team trip to Mahadaga, Burkina Faso

For our members to continue to have energy, passion, and time for the project. Finish building/testing prototype before January January site team trip SIM and Matt Walsh’s work in Mahadaga Burkina Faso. Prayer Requests