TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)

Slides:



Advertisements
Similar presentations
P4 Shutter Review May, 2005 P4 – ID Movable Beam Stop and Integral Shutters Presented by K. Beyer and T. Lutes.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
ME 495 EV Team 3: Adapter Plate Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
O. Aberle, EN/STI/TCD 16 October 2014 WORKSHOP ON R2E, RADIATION AND AVAILABILITY AT THE LHC COLLIMATOR EQUIPMENT AND INTERVENTIONS, OPTIMIZATION OF DOSE/INTERVENTION.
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
HRM28-TCDI Updates June 24 th, 2015 Fausto Lorenzo Maciariello, F-X Nuiry, R. Ferriere, K. Karagiannis, M. Butcher, G. Vorraro, S. Le Fouest.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
HiRadMat Collimator Jaws HRMT23 03/07/2014EN/MME - E. Berthomé1.
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
The Stripping Foil Test Stand in the Linac4 Transfer Line
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
A. Bertarelli CERN TS – MME Group 1 CERN European Organization for Nuclear Research Actuating system of the LHC Collimators (Phase 1) Main Features.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
ESS | A Preliminary Feasibility Assessment of Power Converters and Magnets for Beam Raster System| | Carlos A. Martins, ESS Preliminary Feasibility.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Updated Design of TCLD whit reduced jaw length Collimation Upgrade Specification meeting L. GENTINI.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
The integration of 420 m detectors into the LHC
HL-LHC 11 T Dipole for DS Collimation 8 th to10 th December, 2014 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, F. Savary,
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
Preparation for Circulating Beam - Part II Collimators (40') Oliver Aberle o Breakdown of tests foreseen in preparation for beam o Equipment folder: tests.
1 CAN WE KEEP THE CURRENT SYSTEM FOR LIU BEAMS ? Francesco Cerutti, Alessio Mereghetti, Joao Saraiva LIU-SPS Beam Scraping System Review 2013 Jan 22 contributions.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
HRM28-TCDI Updates October 28 th, 2015 Fausto Lorenzo Maciariello, on behalf of the TCD Team.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Two-beam module layout
LCWS11 WG4 Fully featured accelerating structure engineering design
Stator Plan & Schedule Chris Booth 2nd March 2009
News and Introduction from CERN June 15th, 2005
L. Gentini, A. Bertarelli, F. Carra
ELENA installation and commissioning status
Review on collimator movement with stepping motors
Possible causes for SPS ZS2 misalignment
List of changes and improvements for the next generation CLIC module
The 5th HERD Workshop, CERN IsCMOS Camera Developement
Planned activities on collimator for LS1
H600 Pro H1200 Pro Nov
The 11T cryo-assembly: summary of design and integration aspects
Review on collimator movement with stepping motors
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Phase II Collimators : design status
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
LARP Phase II Secondary Collimator RC-1
Fiber End Cap (for high power applications)
Presentation transcript:

TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)

Outline Actual Design Flexibility / Sacrificial? From a single unit towards couples? Modifications / Options Conclusion O. Aberle (EN-STI-TCD)2

Actual Design O. Aberle (EN-STI-TCD)3 Flange to flange length 1.34 m Graphite blocks R4550, 1.2 m long, 37 mm thick, clamped 2 independent motors per jaw Flatness over 1.2 m: 0.1 mm Parallelism over 1.2 m: 0.1 mm Alignement by survey: 0.1 mm

Actual Design O. Aberle (EN-STI-TCD)4 Phase one table Flange DN 60! No RF fingers/ferrites No water cooling No quick connection (electrical or for vacuum) No plug-in for positioning

Flexibility / Sacrificial? O. Aberle (EN-STI-TCD)5 Keep design features o from TCDI/ring collimators (e.g. quick plugin, integrated BPM) and profit from o collimator development (e.g. new materials, manufacturing technologies ) Stay within the actual length for a mono-block jaw o  Two TCDIs with the existing design (1.2 m), maybe different jaw material? o Jaw clamping system allows assembly of different materials on the same beam o Overall positioning precision TCDIs ~250 µm. o Relative positioning between the two neighboring TCDIs ~50 µm. o Would have 4 motors per TCDI “jaw” o Very important: Best knowledge of beam position With bellows etc.: 3.5 m for full flexibility o Flexibility = exchange only first one in case of beam impact

O. Aberle (EN-STI-TCD)6

From single unit towards couples? LIU TCDIs = long TCDIs 1.9 m long TCDIs (for densities of graphite, BN) Longer/low density – preferable for thermo-mechanics (adding a second TCDI -> 2.4 m length) Higher density for better efficiency (start with Graphite, go to higher density downstream) 2 main options: o Stand alone units o coupled units O. Aberle (EN-STI-TCD)7

From single unit towards couples? 2 main options: o Stand alone units o coupled units Pumping module allows for fast separation, remote handling and to use spare surface O. Aberle (EN-STI-TCD) mm

O. Aberle (EN-STI-TCD)9 MKT vacuum connection Modifications / Options

O. Aberle (EN-STI-TCD)10 Integrated BPM o Significant higher complexity of design Water cooling / RF issues Remote handling to be studied o Several features available o Reduced tunnel space and different slope! Normal operation – low dose Accident case – high dose, but fast cool down (see Helmut’s talk)

Conclusion Stay close to dimensions of proven design o TCDI design for simpler, cheaper manufacturing, more material flexibility o TCTP design has more options o Pick form both options – other input (e.g. TDI?) Two units can do the job More studies needed (see previous talks) Feasibility to have new system ready for LS2 Rough number for the budget: 500 kCHF / unit o Options have a cost (cable length!, remote handling) O. Aberle (EN-STI-TCD)11