Building Permits for Solar Domestic Hot Water Systems Ted Van Vliet Toronto Building October 1 st, 2008 Presented at Solar Neighbourhoods Contractor Workshop.

Slides:



Advertisements
Similar presentations
Special Inspections
Advertisements

Building Code II ARC313. Building Code sets out technical requirements for the construction, renovation and demolition of buildings sets out technical.
CODE ENFORCEMENT DIVISION.  PURPOSE OF NUISANCE ORDINANCE:  It is the purpose of the nuisance ordinance to establish means whereby the City may remove.
12/30/99Public Forum - Sewer Lateral RESIDENTIAL SEWER LATERAL REPAIR PROGRAM Proposition 1 on the April 6, 1999 Election Ballot Ordinance 19,
Board of Standards and Appeals Community Board 3 / Manhattan June 13, 2011 Introduction Introduction Applications: Applications: –Variances –Special Permits.
June 26 th, 2010 Presentation to the Cavendish Community Ratepayers Association Inc.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
BUILDING PERMIT PROCESSING RATIONALE ( Lease Agreement, article on Miscellaneous – Improvements) “ The LESSEE shall not make any structural changes,
Residential Fire Sprinklers Building Codes Plan PreparationPlan Preparation The sprinkler contractor should be required to submit a set of complete, detailed.
Geothermal Alliance of Illinois February 28-29, 2012 Dave Johnson, P.E. Illinois Department of Public Health.
Quality Management – Cost and Time Management Initial Cost of Materials & Equipment Labor Cost Long Term Cost Time Management.
Planning Legislation – Prof. H. Alshuwaikhat ZONING Zoning is the division of a municipality, city or town into districts for the purpose of regulating.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Meet the DBI Pros Summit October 11-12, 2007 Isam Hasenin, P.E., C.B.O., Director How To Obtain a Permit.
WELCOME Getting Smart About Home Modifications A Webinar Series Sponsored by the Wisconsin Department of Health Services W ebinar #5 Permits, Zoning and.
ARE LOCAL ZONING AND BUILDING CODE REQUIREMENTS PREEMPTED BY STATE LAW? Distributive Electrical Generation Systems.
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
Residential Construction Unit 1 Mr. Todzia.  Definition-Legal requirements designed to protect the public by providing guidelines for structural, electrical,
CODE ENFORCEMENT. Code Enforcement Code Enforcement Officers work in twelve geographically defined code enforcement areas. In each area the inspectors.
Rob McMonagle, SolarCity Program Manager, Toronto Atmospheric Fund March 31, 2010 Inspecting Residential Solar Water Heating Systems.
FY Budget Presentation to Board of Finance March 17, 2014 Building Department Robert DeMarco, Chief Building Official.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Energy surveying qualifications and procedures West Midlands Housing and Energy Conference 2007.
1 Canadian Fire Alarm Association The Perspective from a Municipal Building Department Wednesday May 5, 2010 Presented by:Mike Seiling, CET, CBCO, Chief.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Developing a Solar Hot Water Deployment Program Lessons From the Toronto Solar Neighbourhoods Initiative April 28, Rob McMonagle, Toronto Atmospheric.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
©2011 Cengage Learning. Chapter 15 ©2011 Cengage Learning REQUIRED GOVERNMENT REPORTS.
1 Public Planning Meeting Date: June 24, 2015 Application: Draft Plan of Subdivision, Official Plan and Zoning By-law Amendment Applicant: Highland Gate.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
NC Rules and Requirements: Certified Inspectors of Subsurface Systems NC Certified Inspector Training School.
SECOND UNITS IN BRAMPTON BREB BUSINESS BREAKFAST October 8, 2015.
Planning & Community Development Department Consideration of a Call for Review Minor Conditional Use Permit #6003 (1528 Whitefield Road) City Council Meeting.
C U S T O M E R D R I V E N. B U S I N E S S M I N D E D. Department of Licensing & Regulatory Affairs Bureau of Construction Codes Keith E. Lambert, P.S.,
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Redevelopment in the Resort Housing District To the Sanibel- Captiva Chamber of Commerce Nov. 29, 2011 Prepared by: Planning Department.
The division of lands by legislative regulations, into areas or zones, which specify allowable land uses and size restrictions.
Hillsborough Building & Planning. Green Building 101  Efficiency of buildings and responsible use of water, and construction materials  Reducing building.
Building Permit Contractor Round Table 8731 Citizens Drive New Port Richey, Florida Wednesday – July 10, :00 pm to 4:00 pm.
School Construction Training and Education May 4, 2011.
Planning & Community Development Department Board of Zoning Appeals: Hillside Development Permit # Hillcrest Place City Council March 14, 2016.
Permit Process & Application Guide
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Amendments to the Town and Country Planning (General Permitted Development) Order 2008.
City of Franklin Department of Building and Neighborhood Services Transitioning from Private Sewage Disposal to Public Sanitary Sewer September 30, 2010.
May 4, 2011 Jenefer Youngfield Utah State Office of Education Utah K-12 Public School Construction Education and Training.
South Central Economic Development District. Community Development Block Grants For Housing Housing grants support rehabilitation of owner- and renter-occupied.
Mandatory Connection 2 nd Information Meeting November 17, 2015.
Ontario Building and Fire Code Overview Presentation for the Downtown Revitalization Committee May 4, 2016 Jack Tosta, Chief Building Official Andrew McPherson,
CROSS CONNECTION CONTROL PROGRAM
CITY OF HARARE EMERGENCY SERVICES
Department of Permits, Licenses, and Inspections
Ontario’s Drainage Legislation
Answer these questions.
Enforcement of Floodplain Management Regulations
Public Information Centre
Global Connections Day Building Safety Service Provider
Department of Buildings
Annual Inspection Certification Program
“How you can become a licensed contractor”
Partners in Building Safety
Chemical Purchasing.
City Council Meeting August 27, 2018
Construction Contract Administration
Building Permit Process
Village of Montgomery Solar Permitting
Institutional Controls At Voluntary Cleanup Sites
Council Orientation October 24, 2017
Presentation transcript:

Building Permits for Solar Domestic Hot Water Systems Ted Van Vliet Toronto Building October 1 st, 2008 Presented at Solar Neighbourhoods Contractor Workshop

Presentation Outline Who we are Ontario Building Code and Zoning By-laws Building Permit Applications and Submission Requirements Questions

Toronto Building: Who we are and What we do...

Who we are and What we Do: Toronto Building: Enforce the Ontario Building Code, the City of Toronto's zoning by-laws and other applicable law, including: Reviewing Building Permit applications; Issuing Building Permits; and, Conducting Inspections Divided into 4 Administrative Districts within the City of Toronto

District Office Locations and Contact Information Toronto and East York District Toronto City Hall 100 Queen Street West Wards: 14, 18, 19, 20, 21, 22, 27, 28, 29, 30, 31, 32 North York District North York Civic Centre 5100 Yonge Street Wards: 8, 9, 10, 15, 16, 23, 24, 25, 26, 33, 34 Etobicoke York District Etobicoke 2 Civic Centre Court Wards: 1, 2, 3, 4, 5, 6, 7, 11, 12, 13, 17 Scarborough District Scarborough Civic Centre 150 Borough Drive Wards: 35, 36, 37, 38, 39, 40, 41, 42, 43, 44

Why get a Building Permit for SDHW Systems To avoid structural failure of the building; Fire Protection; To ensure that the system will not separate from the building; To avoid contamination of potable water; To avoid water damage i.e. leaky roof, improper water shedding, improper plumbing connections Because it is a legal requirement!!!

When you need a Building Permit Construct a new building Any addition to an existing building Structural alterations Renovate or repair a building Make new openings for, or change the size of, doors and windows Install or modify HVAC systems New or altered plumbing An accessory structure larger than 10 square metres in area

The Ontario Building Code and Solar Domestic Hot Water Systems

Building Code Objectives Safety Health Accessibility Fire, Structural, Water & Sewage Protection of Buildings Resource Conservation Environmental Integrity Conservation of Buildings

Building Code Requirements Structural Sufficiency: Requirements for Housing - Part 9; Requirements for Large Buildings – Part 3 and/or Part 4 Plumbing Connections; Collector Design and Installation Requirements: Part 7 for all buildings Fire Protection Part 3 and 5 for all buildings

Packaged vs. Non-Packaged SDHW Systems ‘Packaged’ System (Off the Shelf) : Equipment must conform to CAN/CSA-F379.1 Installed in conformance with CAN/CSA-F383 ‘Non-packaged’ Systems (Custom Design): Designed and installed in accordance with ‘good engineering practice ’

Zoning By-laws and Solar Domestic Hot Water Systems

Zoning By-laws Zoning By-laws set out rules governing land use and the placement of buildings on a lot. It states exactly: Land and building uses; Building size, height, or density; Location of buildings and other structures; Minimum lot sizes and dimensions.

Zoning By-law Requirements for Solar Energy Devices For zones that allow dwelling units: When located on a building, it is subject to the zoning requirements for the building on which the device is located; and, When not located on a building, it is subject to the zoning requirements for an accessory or ancillary building or structure on a lot in which the device is located.

Sample Zoning Requirements Requirements for the Main Building Front Yard Setback6.5m Side Yard Setbacks1.0m Rear Yard Setback9.5m Building Height9.0m Requirements for Accessory or Ancillary Structures Must be located behind the main building Side Yard Setbacks0.3m Rear Yard Setback0.9m Building Height4.0m

Applying for the Building Permit

Requirements for Submission Application forms; CSA Certification documents or alternative solutions documentation; Building and Site Plans (2 copies); and, Payment of Building Permit Fees In many cases, separate permits are required for Plumbing and Structural work

Building Permit Application Form May require 2 applications Designer Information Sheet Declaration for Time Frames Tree Declaration Form Required Forms:

Designer Requirements Since 2006, the Ontario Building Code has required that all plans are prepared by a ‘qualified person’ Qualified person is: A Licensed Engineer; A Licensed Architect; or, A person who has passed exams prescribed by the Ministry of Municipal Affairs and Housing Professional seals/stamps or BCIN numbers must appear on all submitted documents and plans Homeowners who prepare their own plans are exempt from qualification requirements However, the City has the right to ask for an Engineer to prepare or review plans as necessary

Requirements for Plans 2 copies of: Site Plan; Roof Plan; Building Elevations; Details on the Hot Water Tank and all new and existing Plumbing Connections; Sufficient information should be provided on all plans to deem compliance with the Ontario Building Code and Applicable Laws Toronto Building has the right to ask for information deemed necessary to determine compliance with the Ontario Building Code and other Applicable Laws

Sample Site Plan

Sample Roof Plan

Sample Elevations

Connection and Piping Details Photo Credit: NRCan

CSA Certification Documents For Packaged Systems a copy must be provided as part of the application – including all supporting documents CSA certification information may be required for equipment in other types of installations

Alternative Solutions For Packaged Systems that do not have CSA certification, design alternatives may be considered Most alternatives require an Engineer to prepare; Alternatives must demonstrate equivalent or superior performance to systems certified under CAN/CSA-F379.1; Toronto Building may be able to ‘certify’ plans in some cases; If received; approval of alternative solutions or certified plans are good in Toronto only, and may be heavily restricted

Payment of Fees Fee By-law is currently being reviewed for SDHW permits Fees for small residential installations is $92.94 (includes all permits) For more complex installations and certified plans, additional fees may be charged All fees must be paid prior to the issuance of a Building Permit !

Building Inspections Open for Discussion The City is required to inspect all work for which a Building Permit is issued; It is the responsibility of the permit holder to ensure the Building Inspector is notified that work is ready to be inspected; Any deviation from the approved permit plans, may result in work being stopped

For copies of Forms and Other Information Please visit our website at

Questions ? Toronto and East York District Toronto City Hall 100 Queen Street West North York District North York Civic Centre 5100 Yonge Street Etobicoke York District Etobicoke 2 Civic Centre Court Scarborough District Scarborough Civic Centre 150 Borough Drive