Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai.

Slides:



Advertisements
Similar presentations
Chris Greacen “Energy is a human right”: Renewable energy on the Thai/Burma border Energy and Development Workshop Monterey Institute of International.
Advertisements

Distributed Generation & Energy Storage in Indonesia
CHANGES IN ELECTRIC GENERATION Generation vs. Demand: Demand growing 3% per year New Generation more difficult to build.
Citizen’s meeting on Power Sector Reform Chris Greacen November 25, 2007 Bangkok, Thailand Solar, wind, hydro, CHP in Thailand: technology, cost, potential,
Renewable Energy Issues - NEDO’s Experience in Southeast Asia - 10 December 2002 Masahiro Miyazaki NEDO Bangkok (Southeast and South Asia Office) New Energy.
Renewable Energy in Islamic Republic Of Iran
1 GENERATING DIALOGUE CLEAN ENERGY, GOOD GOVERNANCE AND REGULATION by Maritje Hutapea Directorate General for Electricity and Energy Utilization Ministry.
Thoughts on sustainability of PEA Solar Home Systems for PEA 14 Mar, 2548 Chris Greacen Palang Thai
Chris & Chom Sangarasri Greacen Lopez Library 12 May, 2005 No more surgeries by flashlight solar power for jungle clinics in Burma and other tales of green.
Cambodian Energy Sector Development Ministry of Industry, Mines and Energy Vietnam, Ho Chi Minh, 11 November, 2011 Greater Mekong Subregion Fifth Meeting.
Chris Greacen Li Garden Hotel, Hat Yai, Thailand 20 Nov, 2005 Solar, wind and micro-hydropower: options, costs, resource assessment Palang Thai.
Renewable Energy The Re al Alternative?. Module Overview Lesson 1, The REal alternative Why, how much, when and what Lesson 1, The REal alternative Why,
Practical Policies for Decentralized Electricity Generation Chris Greacen Palang Thai MEE-Net Workshop 18 January 2012 Bangkok.
Solar Energy
Electricity Generation, Storage and Distribution Technology Presentation Peter Ellwood (HSL)
Renewable Energy 1) Solar Power 2) Wind Power 3) Hydro Power (Water) 1) Solar Power 2) Wind Power 3) Hydro Power (Water)
Clean, Affordable Decentralized Energy Options -- Burma Chris Greacen Palang Thai MEE-Net Seminar on Energy in Burma 24 Jan 2011 Chiang Mai.
Solar PV Design Implementation O& M March 31- April 11, 2008 Marshall Islands 2. Solar Home Systems (SHS) 2. Solar Home Systems (SHS) Herb Wade PPA Consultant.
Empowering Rural Electrification in Myanmar: Opportunities and Policies Tungapuri Hotel Nay Pyi Daw, Myanmar Dr. Chris Greacen March 9, 2013.
Group 4 Punyapat Saksupapchon Thailand Wong kek Liang Malaysia Kyungmi Park Korea Tick Phengsombath Laos Ahmad Nasikun Indonesia.
Environment and Energy Htun Paw Oo 1 June Content Environment and Energy Ecosystem services The role of energy Myanmar energy context Way forward.
Thailand, May 2009 Mekong Energy and Ecology Network The First Mekong Energy and Ecology Training.
Thailand situation analysis and initial idea for case study Chris Greacen Sopitsuda Tongsopit Chuenchom Greacen Palang Thai.
Renewable Resources Unit 8. Electricity The production of most electricity depends on a spinning turbine which is connected to a generator made up of.
Distributed Power Opportunities in the Developing World Presentation to the Distributed Wind Energy Association F. Andrew Dowdy February 13, 2013.
Solar Electricity 14 April, 2009
Solar Energy 20 October, 2010 Monterey Institute for International Studies Chris Greacen, Palang Thai.
Chris Greacen Chiang Mai, Thailand 24 January 2013 Grid-connected renewable energy in Thailand under the VSPP and SPP programs MEENet workshop, session.
Biogas System Solar Hot water Charity Tournament 2012 Biomass Programs supporting Energy-Efficiency Dr. Twarath Sutabutr Deputy Director-General Department.
Chris & Chom Greacen Oct 4, 2006 RAEL UC Berkeley Towards sustainable energy in Thailand Palang Thai Border Green Energy Team Public interest energy policy.
Electricity Generating Authority of Thailand (EGAT) 1 STRUCTURE, STATUS AND CROSS BORDER POWER INTERCONNECTION 0F THAILAND b y Mr. Prutichai Chonglertvanichkul.
Electricity in Thailand: current arrangements, impacts, alternatives 2 August, 2006 ERI Chris Greacen
Feed-in tariffs and south-south policy/technology transfer: The evolution and implementation of Very Small Power Producer (VSPP/SPP) Regulations in Thailand.
Introduction to Electricity PART 1
‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy.
Energy – Current Status and Policies Shuba V. Raghavan CSTEP Center for Study of Science Technology and Policy 1.
1 Development of Renewable Energy Application in Vietnam Energy and Petroleum Department MINISTRY OF INDUSTRY.
Towards Sustainability for Thailand's Solar Home Systems Observations from Tak province by Chris Greacen, Ph.D. Presentation at SERT, Naresuan University.
May 20, 2009 MeeNet, Thailand Micro-hydro, biomass, biogas: technology, cost, potential, applications Palang Thai.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
Approaches to Rural Electrification in East Africa: Donors, Projects, Rural Energy Agencies & the Private Sector Mark Hankins Energy for Sustainable Development.
Sustainability and Thailand's Solar Home System: Is it still achievable? Observations from Tak province by Renewable Energy Conference, BITEC Fredrik Bjarnegård.
Grid-tied decentralized power generation: experience from Thailand and Tanzania Chris Greacen Palang Thai AEPF 9 17 October 2012 Vientienne, Lao.
Clean electricity options for a free Burma Chris Greacen Palang Thai Seminar on “Energy: Tragedy in Burma” 20 November 2007 Chulalongkorn University.
15-17 Nov 2004Italy-Vietnam Cooperation Perspectives1 International workshop on Management and Protection of Vietnam’s Natural Environment and Resources.
Distributed Generation and Energy Storage in the Philippines Rafael L. Abergas Manager Planning and Technical Services Department Small Power Utilities.
Electricity in Thailand: current arrangements, impacts, alternatives 27 June, 2007 ERI Chom Greacen Chris Greacen
Energy in the United States Electricity, Nuclear Energy, Renewable Energy Summary report by Sarah Lahr Sustainable Air Quality 2/11/02.
Evolution of Thailand’s Very Small Power Producer (VSPP) regulations Humboldt State University 11 September 2008 Chris Greacen Palang Thai.
GMS Power Grid Who gains, who loses? Chuenchom Sangarasri Greacen 17 July 2005 Piyawan Resort.
Selling renewable energy profitably to the grid: The evolution and results of Very Small Power Producer (VSPP) Regulations in Thailand and Tanzania Regional.
Remarks on occasion of launch of Solartron/Grundfos solar water pumping project January 22, 2007 Chris Greacen Border Green Energy Team Palang Thai
Thailand’s experiences in the power sector Chuenchom Sangarasri Greacen Chris Greacen, Ph.D. Palang Thai International Seminar on Dams and Sustainable.
CUBA ELECTRIC INDUSTRY
Background Information The United States uses a lot of energy – nearly a million dollars worth of energy every minute, 24 hours a day, every day of the.
Energy & Power Unit 5, Lesson 1 Explanation © 2011 International Technology and Engineering Educators Association, STEM  Center for Teaching and Learning™
Governance issues in the Thai Electricity Sector WRI/TEI Workshop on Electricity Governance in Asia Chuenchom & Chris Greacen Palang Thai:
Renewable Energy for conviviality: some experiences from Thailand Chris Greacen Palang Thai Eco-Village Training 20 December 2007 Mu Ban Dek, Kanchanburi.
Medors.in DESCRIPTION Off-grid refers to not being connected to a grid generally National grid Off-the-grid homes are autonomous, they do not rely on.
Chris & Chom Greacen 16 April 2009 Towards clean, just and democratic energy development in Thailand and South-east Asia Palang Thai.
Presentation at SERT, Naresuan University
Clean electricity options for a free Burma
Renewable energy potential in Thailand
1 KNOWLEDGE SHARING ON SOME COMMUNITY BASED RENEWABLE ENERGY PROJECTS IN THAILAND CHARTDANAI.
Chris & Chom Sangarasri Greacen
NS4960 Spring Term, 2018 China: Expanded Renewables
Connecting small renewable energy generators to the grid in Thailand: case studies & technical requirements Renewable Energy Forum Thursday, 28 October.
Micro- and pico-hydropower in Thailand: a short overview of technology, applications and critical factors for success Chris Greacen Palang Thai
Connecting pigfarm biogas to the grid in Thailand – VSPP regulations
Renewable Energy for conviviality: some experiences from Thailand
Presentation transcript:

Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Palang Thai พลังไท Thailand NGO Objective: –To ensure that the transformations that occur in the region's energy sector: augment, rather than undermine, social and environmental justice and sustainability. Key approaches: –We teach hands-on energy technology –We draft / comment on policies –We work to empower citizens to look critically at government and industry projects and plans –We advocate structural reform พลัง (palang): n 1. Power. 2. Empowerment. ไท (thai): adj. 1. Independence. 2. Self-reliance

Outline hands-on village scale –solar electricity for medical clinics in Karen-controlled Burma –village micro-hydropower – Thailand energy politics and policy –Very Small Power Producer (VSPP) program –Bo Nok / Hin Krud – stopping silly big power plants institutional aikido

Conflict area Little/no rural electrification Joint effort: TOPS (Taiwan), Palang Thai (Thailand), SunEnergy Power (USA) Green Empowerment (USA)

Border Green Energy Team Solar electricity for 40 medical clinics for internally displaced inside Burma

Up to 2 million internally displaced people in Burma

Ruggedized solar electric systems built by medics in 3-5 day hands-on trainings 9 trainings ( ) >90 medics trained 40 clinics

Community micro-hydro (12 villages)

Micro-hydroelectricity Source: Inversin, A. R. (1986). Micro-Hydropower Sourcebook.

Kre Khi village, Tak Province 1 kW for school, clinic, church Cost: <$3,500 (turbine $250) Head: 10 meters Flow: 15 lit/sec

Laos – low head micro-hydro orgy

Mae Wei – ‘pump as turbine’ off-grid induction

Video… Mae Wei

Border Green Energy Team Refugee camp trainings

So far: Solar PV Micro-hydro Hydraulic ram pump Solar cooking 7 hybrid solar/diesel systems Biogas

Solar/diesel hybrid systems for computer training centers in 7 refugee camps

Border Green Energy Team Maintenance & repair trainings for > 14,000 Thai solar home systems

Thai government solar home program 203,000 solar home systems US$200 million No maintenance plan 23% failure rate within 20 months

“The Service & Support Department is like the guy in the parade who walks behind the elephant with a broom and a big bucket”

Thai SHS in Tak province Rated 120 peak Watt single crystalline PV module Rated 150 W, 50 Hz, 230 V Inverter / 10 A Charge controller 12 V, 125 Ah deep cycle lead-acid battery Two 10 W tube fluorescent lights with electronic ballasts AC outlet for TV or other appliances

Ministry of Interior PEA Installation company End users $ $ SHS Existing linkages warranty Tax payers $

Ministry of Interior PEA Installation company End users $ $ SHS Missing linkages warranty What happens when systems fail? There is no feedback loop from the end users to installation company, PEA, government or taxpayers Tax payers $

Warranty awareness Self-help: local technicians + user training Ministry of Interior PEA Installation company End users $ $ SHS Missing linkages warranty Tax payers $ Feedback on status of systems, failure modes, successful interventions

SHS Warranty  Warranty periods –Complete system: 2 years –Solar panel: 5 years –Charge controller/Inverter:3 years –Battery: 2 years –Light/Ballast: 2 years  The system warranty is expiring within a few months  Very few villagers informed that there is a warranty

SHS Warranty  Postcards with warranty and maintenance information could be distributed by Tambons  Idea presented at meeting with DLA (Department of Local Administration)

BGET on TV Goals:  TV-broadcast discussion of SHS sustainability, need for more local capacity  Inform public of warranty

BGET SHS trainings in Tak province

Failed inverter/charge controller (~10% of all systems surveyed). Observed failure modes - inverter Solartron and PEA provided 15 replacement inverters for the first 2 trainings

Ballast failure ~9% of systems surveyed Observed failure modes - ballast

Observed failure modes –battery battery failure in ~6% of systems surveyed healthy, without sulfation sulfated plates

Installation error: Battery failure caused by solar panel installation in shady location 14:00 Saw Kre Ka village, Tha Song Yang District Problems found during training/surveys

Installation error: Bad panel locations Problems found during training surveys

User error: bypassed controller  battery overcharge 1.Villager bypasses broken controller and charges battery directly from PV 2.Battery over-charged. Electrolyte level drops and plates are exposed to air. Battery fails. 1 2 Observed failure modes – (cascading component failure)

User error: Controller bypass leads to burned diode 1 2 Observed failure modes – (cascading component failure) 1.Villager bypasses broken controller and charges battery directly from PV 2.One mistake of reverse battery polarity blows up bypass diode in PV junction box, melting junction box.

policy & planning level…

Very Small Power Producer (VSPP) regulations

Can’t we hook it up and sell power back?

VSPP meetings…

Uses waste water from cassava to make methane Produces gas for all factory heat (30 MW thermal) + 3 MW of electricity 3 x 1 MW gas generators Korat Waste to Energy – biogas … an early VSPP project

Biogas from Pig Farms Reduces air and water pollution Produces fertilizer Produces electricity 8 x 70 kW generator Ratchaburi

Biogas from Pig Farms

Bangkok Solar 1 MW PV Project size: 1 MW Uses self-manufactured a-Si

VSPP summary June 2008

Thailand VSPP Tanzania ? Cambodia ? ? ?

Next project… community built, community-owned, profitable VSPP micro-hydro

Unlimited living?

Electricity production and consumption (GWh) 1700 families relocated Loss of livelihood for >6200 families Loss of 116 fish species (44%) Fishery yield down 80% 65 Mae Hong Song Source: MEA, EGAT, Searin, Graphic: Green World Foundation Dams Malls Province Pak Mun Impacts of Pak Mun Dam alone

Bonok-Ban Krud story

Bonok Bankrud

Power Demand: Projections vs. Actual MW

Linear versus exponential extrapolation

Fuel mix in power generation - power development plan 2007 GWh Import Nuke RE Gas Coal Lignite Hydro

Thai – Pacific Northwest power planning exchange

Leveraging change ActivityLeverage Medical clinic PV in Burma40 clinics serve 100,000+ “It’s hard to do amputations with a flashlight” Micro-hydro* inexpensive(<$2per W) Intuitive & local Refugee camp trainings* If peace comes and repatriation can happen, refugees are returning to a ‘blank slate’ VSPP * Renewables becomes viable grid- connected business. * “Power plant” redefined. Power sector planning reformTransparency Accounability public participation End to “too much generation capacity” and “wrong kinds”.

Principles Commit Be flexible and open to opportunities for equilibrium-shifting change Take time for reflection… stay real Document and release “Many hands make light work”

For more information Chom and Chris Greacen Palang Thai Skype: chrisgreacen

Thailand in context Constitutional monarchy with a parliamentary system (similar to England) Size: about 4/5 of California Population: 66 million (2x that of CA) GDP (PPP) : $553 billion (1/3 of CA’s) GDP per capita: $8,500 (1/6 of CA’s) Energy consumption: 57 million BTU (1/4 of CA’s) Peak power demand: 23 GW (<half of CA’s) 99.8% of villages are electrified

78 North Korea village wind farm

79

80 Powerhouse under construction

81 Interphase with DPRK grid

82 Farm manager starts windturbine

83

Hourly load curve, by year from 1985 to Graph based on an appliance usage survey of 35 families in Mae Kam Pong village, April and June 2001.

Contribution to evening maximum peak demand by appliance, for the years 1985 – 2001.