1 1 Rapid recent developments in Phase I L1Calo Weakly 25 Jul 2011 Norman Gee.

Slides:



Advertisements
Similar presentations
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
Advertisements

JFEX Uli Schäfer 1 Uli Intro / overview / issues Draft, will change !!!! Some questions flagged.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Phase-0 Topological Processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
L1Calo – towards phase II Mainz upgraders : B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz, U.Schäfer, C.Schröder, E.Simioni, S.Tapprogge.
Programmable logic devices / tools Programmable logic devices are digital logic devices, providing combinatorial logic (gates, look-up tables) and flip-flops.
ATLAS L1 Calorimeter Trigger Upgrade - Uli Schäfer, MZ -
GOLD Status and Phase-1 Plans Andi E. & Uli S. Uli Schäfer 1.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Uli Schäfer 1 S-L1Calo upstream links architecture -- interfaces -- technology.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
JFEX Uli Schäfer 1 Mainz. Jet processing Phase-0 jet system consisting of Pre-Processor Analogue signal conditioning Digitization Digital signal processing.
FEX Uli Schäfer, Mainz 1 L1Calo For more eFEX details see indico.cern.ch/getFile.py/access?contribId=73&sessionId=51&resId=0&materialId=slides&confId=
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Evaluation of the Optical Link Card for the Phase II Upgrade of TileCal Detector F. Carrió 1, V. Castillo 2, A. Ferrer 2, V. González 1, E. Higón 2, C.
L1Calo Intro Cambridge Group, Dec 2008 Norman Gee.
JFEX baseline Uli Schäfer 1 Uli. Intro: L1Calo Phase-1 System / Jets Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM.
April CMS Trigger Upgrade Workshop - Paris1 Christian Bohm, Stockholm University for the L1 calorimeter collaboration The ATLAS Trigger Upgrade.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Alan Watson ATLAS Overview week, Prague, 17/09/2003 Rx   Calorimeters (LAr, Tile) 0.2x x Mb/s analogue ~75m 0.1x0.1 RoI Builder L1 CTP.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
S. Rave, U. Schäfer For L1Calo Mainz
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 12-May-2014.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
JFEX Uli Schäfer 1. Constraints & Numerology Assumption: one crate, several modules. Each module covers full phi, limited eta range Data sharing with.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 19-May-2014.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Mark Thomson University of Cambridge WP6: L1Calo Upgrade.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
09/09/2010 TDAQ WG - Louvain 1 LKr L0 trigger status report V. Bonaiuto, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti, F. Sargeni, F. Scarfi’
Upgrade intro and report on DESY Upgrade Meeting 5 May 2010 Norman Gee.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Samuel Silverstein, SYSF ATLAS calorimeter trigger upgrade work Overview Upgrade to PreProcessor MCM Topological trigger.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
L1 Technical Proposal: Phase 2 ● Slow progress on writing TP phase 2 – Distractions with beam and calibration – Also some things are still unclear ● Hence.
L1Calo Upgrade Phase 2 ● Phase 2 Functional Blocks? – Thoughts on L1 “refinement” of L0 ● Simulation framework ● Phase 1 Online SW Murrough Landon 2 February.
Phase2 Level-0 Calo Trigger ● Phase 2 Overview: L0 and L1 ● L0Calo Functionality ● Interfaces to calo RODs ● Interfaces to L0Topo Murrough Landon 27 June.
Phase 2 L1Calo/Calo Interface ● Introduction ● Calo RODs ● Granularity and algorithms ● Calo-L1Calo links ● L1Calo design? ● Summary Murrough Landon 9.
Rainer Stamen, Norman Gee
ATLAS calorimeter and topological trigger upgrades for Phase 1
Weiming Qian On behalf of the ATLAS Collaboration
L1Calo Phase-1 architechure
L1Calo upgrade discussion
ATLAS L1Calo Phase2 Upgrade
Cabling Lengths and Timing
Run-2  Phase-1  Phase-2 Uli / Mainz
The First-Level Trigger of ATLAS
Level-1 Calo Monitoring
L1Calo Joint Meeting Introduction
CMX Status and News - post PRR -
CMX scope and functionalities
(Not just) Backplane transmission options
Presentation transcript:

1 1 Rapid recent developments in Phase I L1Calo Weakly 25 Jul 2011 Norman Gee

25-Jul-2011N Gee - L1Calo Weekly - Upgrade 2 2 Background Phase-I Task Force set up to recommend contents of Phase-I upgrade By July had met 5 times since Dec 2010 Before last week, draft text from TDAQ – mainly level-1, concentrating on latency and known planned changes in L1Calo, L1Muon and CTP Some emphasis low threshold leptons –Including nMCM, CMX, L1Topo Suddenly, meetings 8,12,14,19 July + “pre-meetings” Detailed draft from LAr on 19 Jul at 10:30 for 13:00 pre-meeting!! –Baseline plan is fully replaced TBB. New TBB gives existing Analogue + 4 digitised depth samples; AND could provide lateral granularity –Tile would change only in 2021 –4 x 4 area to be instrumented in both calorimeters for tests

25-Jul-2011N Gee - L1Calo Weekly - Upgrade 3 3 Background Coincided with Stockholm follow-up meeting (organised by DF+CB, with SH, ML, SS invited but travelling, NK, NG) Discussion on L1Calo response… agreed to prepare diagrams & list functions (NG) + thoughts on no of connections (ML) –Several ad-hoc, undemocratic discussions in a frenetic week at CERN, diagrams become obsolete before drawing was complete, etc Meeting organised to discuss evolution in Simulation results post-Stockholm between Alan (using L1Calo granularity) and Denis Damazio & Steve Sekula (using L2 environment) –Conclusion: significant risk that ATLAS may be limited in trig capability, joint R&D on new TBB L1Calo should continue This went into Ph-I TF draft recommendations, was reported to USC, seems to have been accepted (full report being assembled this week) Need to do work on architecture. Current diagrams follow:

25-Jul-2011N Gee - L1Calo Weekly - Upgrade 4 4 Possible Phase I Level-1 Trigger Scheme shown to Ph-1 TF on 9 June

25-Jul-2011N Gee - L1Calo Weekly - Upgrade 5 20 July

25-Jul-2011N Gee - L1Calo Weekly - Upgrade 6 Comments Approximate size of system – from ML count of links in a depth-only system – roughly 8 digital Preprocessor modules “Depth Processors” –Could all fit in 1-2 crates, not a large/expensive/complex system Thinking: –Need to preserve all outputs provided by present L1Calo –We can’t delay L1Calo signals (needed by L1Topo for muon isolation) –New TBB signals are probably much later than PPR outputs (? 10 ticks) –Can’t get new TBB e.m. signals into existing system –Very hard to get old Tile etc had signals into new system would have to immediately expand to several crates – 3600 signals on grey cables: needs duplicate signals or entirely replace L1Calo –New parallel system is an incremental upgrade, not a replacement –Could be a prototype for Ph-II, Level-0

25-Jul-2011N Gee - L1Calo Weekly - Upgrade 7 More 20 July

25-Jul-2011N Gee - L1Calo Weekly - Upgrade 8 Functions of boxes on diagram Name change – Depth Processor becomes Feature Extractor Digital Preprocessor (individual channel-based) –Receive signals optically from from digital TBB, convert to 40 MHz, handle data reception errors; –Adjust timing to common phase and common clock; –BCID filtering, energy calibration, + other functions, e.g. rate metering; –Read out to DAQ (Slink or...) –Remap signals and transmit on fibres, providing duplicates as needed Depth processor (sliding window based) –Receive signals from digital preprocessor –Perform magic depth/granular algorithms –Either (a) send results to L1Topo, or – (b) send results to CMX, or – (c) get RoIs from CMX, match to depth data, send results to CTP and/or L1Topo. Both to provide DAQ/RoI readout as needed

25-Jul-2011N Gee - L1Calo Weekly - Upgrade 9 Next Steps Algorithms, connectivity, partitioning, modularity, latency, simulation, infrastructure, readout, rack space, fibre routing, …