Principles of correct VRV Installation A. Refrigerant pipe work

Slides:



Advertisements
Similar presentations
Service Section Technical Training.
Advertisements

Refrigeration Systems
Coach Air Conditioning
Chapter 4 Air-Conditioning Components
Daikin Altherma™ Troubling Shooting
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
HEAT PUMPS.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Page 1 MDS Installation. Page 2 Contents  Introduction  Outdoor Unit Installation  Indoor Unit Installation  Refrigerant Pipe Work  Gas Charge 
Installation. Indoor Unit Installation Typical Installation.
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
HVACR312 - Refrigeration Metering Devices.
C oncerns Ltd ool Energy Efficient Refrigeration Jane Gartshore, Cool Concerns Ltd.
Working with refrigerants After studying this chapter, you will be able to Purge system with nitrogen. Pressurize system for leak detection Describe different.
COMMERCIAL REFRIGERATION
ASHRAE Presentation: VRF Overview Mitsubishi Electric Presenter: Phone number ©2011 Mitsubishi Electric& Electronics USA, Inc.
Installation. Indoor Unit Installation Typical Installation.
Product Introduction.
Trouble Shooting and Performance Testing
Evaporators For Air Conditioning
Oil Pressure Problems What to look for.
Hydraulics For The Long Term
Air Conditioning EPA Type II.
1 HVACR316 - Piping Condensation Removal Refrigerant Traps Condensation Removal Refrigerant Traps.
The new Super Multi from TCUK
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
CHAPTER 6 Moving Heat: Heating and Air Conditioning Principles
Air-Source Heat Pumps I North Seattle Community College HVAC Program Instructor – Mark T. Weber, M.Ed. Airsource Heat Pump 1.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
Perfect solution for large building
Hawke’s Bay Refrigeration
Installation. Indoor Unit Installation Typical Installation.
Service Section Technical Training. Good Air Conditioning Installation Practices.
David Garvin Product Manager EarthDirEX Geothermal Copyright © 2015 Nortek Inc. All rights reserved.
TECHNICAL TRAINING INVERTER-Y
Pressure-Enthalpy and the Variable Refrigerant Cycle
Large Tonnage Chiller AC Screw. Content Mechanical System Key Components Control Logic Application 2.
Automotive Heating and Air Conditioning CHAPTER Automotive Heating and Air Conditioning, 7e James D. Halderman | Tom Birch SEVENTH EDITION Copyright ©
G-2 Cryogenic System Restoration of G-2 Refrigerator for Proposed E969 Experiment WBS 1.11 Tony Nicoletti 2/8/06.
Page 1 MCQUAY DIGITAL SCROLL SYSTEM Installation.
BASIC AUTOMATIC CONTROLS UNIT 16 ADVANCED AUTOMATIC CONTROLS
Problem Solving using Error Code Saijo Denki Inverter R-410A
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. 5 August 2014.
7 A/C System Components, Operation, and Service.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Product: Air conditioner Training Manual Editor: Hao Guanghui
Air condition installation
3. Climate Control Systems Service Automotive – Heating & Air Conditioning Topics covered in this presentation: Gauge set and refrigerant Service ports.
James McIntyre VRF Training Manager V5 Key Components.
Chapter 4 Training Package HCFC Phase-out RACSS – UNEP 2014 Servicing of HCFC/HFC Based Air-conditioners.
Automotive Heating And Air Conditioning
GROUND SERVICING OF VARIOUS SUB SYSTEMS
AIR CONDITIONING SYSTEM
CHIGO VRF System Commissioning.
Welcome to: Air Conditioning Maintenance & Repair Course
Presented by.
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
14 Refrigerant Recovery, Recycling, and Recharging.
Climate Control Systems Service Air Conditioning System Service
Cassette Type Room Air conditioner 14th August 2016, Kuantan, Pahang.
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
Engine Oil Changes.
Engine Oil Changes.
Presentation transcript:

Principles of correct VRV Installation A. Refrigerant pipe work B. Drain pipe work C. Service space D. Information Flow Hotel Applications Seminar, 9-11 November 2006 Speaker: Joachim Verhelst I would like to give you some more detailed information about refrigerant pipe work, drain pipe work and service space requirements for a well performed VRV installation. (used in middle to large scale applications like Hotels.) -- Daikin offers cooling solutions: cooling, heating air conditioning, = a confort level. Not units only accomplish this, but also the information flow they recieve, also a descent installation of all important aspects, like Refrigerant and drain pipe, and respecting of good design, respecting service space. --Wouldn’t it be easyer for you to convince a client to go for a Daikin product, if he knows that all this points of refrigerant pipe work attention points, drain pipe work importance and Service space requirements, are taken into consideration for the creation of his project? -- Wouldnt it be good as a consultant to know the importance of VRV installation key attention points? Now, These aspects are slightly different in a typical VRV installation, compared to a more simplistic split (skyair) or multisplit applications:

A. Refrigerant piping work Explanation important points of refrigerant piping procedure & new refrigerant 3 very important keywords, that will return in the whole of the presentation, are Dry, clean and Tight installation. In every step of the installation of a VRV system, these 3 points have to be taken into account, even more then for the installation of a split or multisplit system, since the consequences if the installation is erronoous, is bigger here than they are in a smaller system. However, as you know; there are many advantages to this system, like capacity reduction, load spreadding, costdown, and low service needs. In the next slides, we will discuss every step of the installation shortly. No moisture, no dirt, no leakage !

1. Brazing with nitrogen replacement Put and thought the N2 when brazing N2 pressure is 0.8 kg First of all, the installer brazes vertical piping: Most prone to leaks, since most brazing needed. There shoud be an open ending; to displace the oxigen at the inner side of the tube during brazing; to avoid oxidation at the inside of the pipe, causing dirt/system malfunctions later.

Correct storage of pipes Point of piping work ・Dry Clean Tight are same as R22 ・For Dry : Put the cover for both end when store the pipe  For Clean : Put the cover for both end when through the wall and leave the site Please, do NOT use pipes for Sanitary purposes. Installers without VRV experience (first installation) sometimes say, the sizes of pipes/flairs don’t fit… Well: They do fit, but not with pipes of sanitary purposes. These have a totally different material purity and strenght, pressure test limits, totally incapable to capture the pressures working on the system (40 atmosphere!).

2. Flushing Cleans the refrigerant pipes in order to prevent: clogging of expansion valve (capillary tube) Cause of contamination in piping: oxidized film generated during brazing entering of dust, particles, oil, etc. from outside use of other refrigerant Flushing: several times to be sure that water drops that stick to the pipes (adhesion forces) are loosened Vacuum drying: at vacuum, water evaporates --> vapor is removed insufficient cooling or heating degradation of oil oxidation of compressor

3. Air tightening test Prevents Refrigerant Leakage in order to avoid: Gas shortage Insufficient cooling or heating Temperature rising of discharge gas Frost accumulation on heat exchanger

3. Air tightening test Leak check is done with nitrogen: 40 Leak check after 24 h. at 38 Bar Step 3 30 20 Leak check after 5 min. at 21.5 Bar Step 2 10 Step 1 Leak check after 3 min. at 10.3 Bar 3 min 5 min 24 hours

3. Air tightening test The test is divided in 3 parts: 1: Vertical pipe 2: 1+Indoor piping 3: 2+Outdoor piping 3.8 Mpa during 24 hours If air tight test is done only at the end when all pipes are brazed together, and a leakage is discovered (pressure drop during pressurized test, then it is very difficult to find out the leak point. Daikin recommend to divide the test for 3 times

3. Air tightening test Convenient tools for air tight test

4. Vacuum drying Prevents Moisture in Refrigerant Circuit in order to avoid: clogging of expansion valve (capillary tube) insufficient cooling or heating degradation of oil oxidation of compressor Cause of moisture in piping: water entering from outside (rain) dew condensation occurring inside the pipes Flushing: several times to be sure that water drops that stick to the pipes (adhesion forces) are loosened Vacuum drying: at vacuum, water evaporates --> vapor is removed

5. Additional charge of refrigerant The calculation of the additional charge weight should take account of the length of pipe and the situation of branches After calculation, the weight of additional charge shall be recorded on the name plate. Input liquid into the liquid pipes from a charging cylinder following completion of the vacuum drying operation When charging cannot completed, use the action of the compressor during the test run.

5. Additional charge of refrigerant Precise amount is calculated as a function of: Length of pipe Situation of branches Added at the outdoor unit liquid valve During last stage of vacuuming At the start of the test run Weight of additional refrigerant charge Recorded on the outdoor unit nameplate. Monitored with automatic system (VRV III leakage test)

5. Additional charge of refrigerant Depend on piping length additional charge is required Circulate the additional charge amount by formula following the installation manual or Eg Engeneering manual EEDE06-2 paragraph 2.6 Refrigerant Pipe selection, p 55 Or technical data- books under point Refrigerant Pipe Selection, eg p 180 Under installation, eg p 155 point 8.4 for RXYQ5-54P7W1B

New refrigerant R410A tools Use the collect tools for new refrigerant Some tools are used from present but most of all for R410A are need to prepare

B. Drain pipe work Adjust downward gradient Should use the attached drain hose If never use and connecting pipe to the unit directly drain-pan crack may occur due to bending stress that cannot absorbed

Group Drain Piping In the case of common drain piping take care about indoor units position Otherwise water leak will may occur

Different orientations of outdoor units and walls C. Service space Different orientations of outdoor units and walls Single units Installation in rows Centralised group layout Short circuits are avoided Maintenance is facilitated. In the case of several outdoor units installation Keep the enough space following the installation manual

D. Explanation to customer Explain: Hand over relevant printed materials. 1. How to use remote controller. 2. How to clean air filters in indoor units. 3. How to keep optimum operation. 4. How to check if trouble occurs or not. 5. Who to contact if an emergency occurs. Enough explanation to use air conditioners makes very few service calls. In the instruction manual Si39-303, Operation procedure P.207 to P.213 shows how to use remote controllers, optimum operation P.214 shows precautions to ensure the system operates properly, symptoms of air conditioners P.215 shows whether they are troubles or not. And it is helpful for end users to know how they call for services and how the air filter is cleaned. At the end, relevant printed materials, shown at Si39-303 Page 105, should be handed over to end users who can confirm what to do if anything happens.

Summary Installation Drainpiping Information flow to End-Customer By a experienced (and trained) Daikin Installer Keywords: “Clean, Dry, Tight!” Drainpiping With downward slope, Widening tubes Space foreseen in design Information flow to End-Customer About skillfull installation About system features About preventive and corrective service. A decent explanation on “How to use air conditioner” brings very few service calls.

The END