1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.

Slides:



Advertisements
Similar presentations
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
Advertisements

Facilities Management and Design Chapter 4 Safety and Security systems.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Capital Project Presentation As approved through formal resolution by the RCS Board Of Education on March 11,2015. This new presentation outlines the $750,000.
REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:
Energy Conservation Program Overview A Presentation to the Board of Education June 7, 2011 Prepared by Facilities and Planning.
Public Works Institute April 8, 2014 Bob Hartnett Deputy Director of Public Works Steve Aldridge City Architect.
Detroit Public Schools FY 2005 Adopted Budget June 30, 2004.
The Pit Crew: Strengthening the M&O and Facilities Parthership APRIL 3-6, 2013, LONG BEACH, CA.
Allegany-Limestone Central Schools Department Budget Presentation: Drafting our Plan for the Future To the Allegany-Limestone Board of Education February,
August 18 th, 2011 Showcase– Building and Grounds Department.
Chapter 5 Construction Tools and Equipment. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Differentiate.
Facilities Management and Planning Horace Bomar, Director November 1, 2011.
Jurupa USD Prop. 39 Energy Efficiency Project Phase III
Performance Contracting The Honeywell One Source Solution.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
Saint Charles, IL IASBO Facilities Management Committee Presentation 1 What Don’t I Know About Facility Management ? 60 th Annual Conference.
Woodland District 50: Operations and Facilities Report Energy Update 2012 Summer Work Five-Year Facility Plan Service Maintenance Agreement Night Time.
2012 Planned Facilities Reconstruction Project. Planned Facilities Reconstruction Health & Life Safety Energy Conservation & Management Security Upgrades.
Engineering Department
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Resource Conservation Program November 2003 Kelley Gonzales Resource Conservation Manager.
2015/16 Proposed Budget for Adoption General Fund$35,992,937 Special Revenue Fund (Grants) 549,082 Debt Service Fund (Bonds) 2,651,459 Total$39,193,478.
Northwest Power and Conservation Council The Role of the Regional Technical Forum in PNW Energy Efficiency Programs May 14, 2008.
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
Renaissance On Turtle Creek Annual Meeting January 20, 2009.
Revenue Limit Exemption Charlie Schneider CESA 10 Facilities Management Director.
Reserve Items are Classified as Items that are : The Association’s Responsibility Have a Limited Useful Life Have a Remaining Expected Useful Life Have.
FACILITIES MAINTENANCE PLANNING
01/15/16Prop 39 Update - Maintenance & Operations - Sustainability Initiatives Unit1 CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY.
Larry Baebler Jonathan Brown, P.E. April 20, 2015
Betterment Adam Pugh 2015 FIMS & RE Annual Training May,
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
 The U.S Department of energy has financed a program called ReEnergize. They create “Start Zones” in which a decrease in energy usage is funded. The Open.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
DEFERRED MAINTENANCE PROGRAM UPDATE REPORT Accomplishments and 2016 Planned Events October 1,
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
Administrator Sodexo Performance Survey June 9, 2015.
Buildings & Grounds State of the Schools. The role of the custodial staff for Foley Public Schools is to provide a safe, comfortable and clean environment.
SHELTON SCHOOLS OPERATIONS. Energy and Conservation Grant Measures Look at the three main areas of impact Replace HVAC units and Controls at SHS Better.
Tumwater School District Facilities Advisory Committee October 24, 2012.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
1958  Construction began on a new fire hall, adjacent to property known as Fireman’s Park.  The City entered into a contract to construct a firehouse.
Madison County Schools Facility Sales Tax April 2017
Cuba-Rushford CSD Capital Project
White Pigeon Community Schools
EDENTON-CHOWAN SCHOOLS
Addition of Fire Alarm system. None existing.
Strategic Planning & Operations
Hyde Park Central School District
OKEECHOBEE COUNTY FACILITY MAINTENANCE.
UNION GROVE ELEMENTARY REFERENDUM
The summer of 2018 and all the work that has taken place
FY 08 Facilities Department Budget Proposal January 25, 2007
Elements of Effective Signal Maintenance
Annette M. Wells Business Administrator February 9, 2016
Recent Bond Accomplishments
WELCOME WELCOME.
The Director of Facilities in a School District
Technology Department Annual Update
Chimacum District Facility & Program Plan
Division of Business & Finance Accounting Services Information Technology and Plant Operations 2017 Budget Hearing April 22, 2016.
EDENTON-CHOWAN SCHOOLS
Public Works 2020 Budget and CIP Review.
Westerly School Legacy Plan: A Vision for the Future of Education
Presentation transcript:

1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4. Maintenance Facility Needs 5. Major Maintenance Projects 6. Time for Questions

Supporting the District Mission An effective and well managed Maintenance program will help to create and maintain an inviting facility that students will feel comfortable in while providing elements of a nurturing and physically safe environment. Three main ways that Maintenance contributes to the Board’s goals are to: Maintain safe and reliable environments Maintain the public trust Be Efficient and Effective

Recent Maintenance Depart Reductions: Custodial Staff Reductions Reduced 2.25 FTE, loss of 3731 work hours Reduced 33% of Custodial Subs, 830 work hours lost Maintenance staffing Reductions Reduced 2.0 FTE, loss of 3316 work hours Major Maintenance Reduced by $10K to $290K Maintenance: Recent Reductions

Implementing Efficiency measures: Provide more self contained vans (Mobile Shops) Carry more commonly used tools and supplies to reduce unnecessary trips to pick them up resulting in more time on task Reduce the amount of times staff are called off jobs, Clarify what issues require emergency or immediate responses Extend time between highly repetitive tasks where possible Foremen and Managers focus on larger tasks to ensure field staff have what they need to accomplish task More time spent on “Proper Prior Planning” and task scheduling Cedar Creek Crew – Cost effective project resource Maintenance: Reduction Countermeasures

Small Repair Grant $91K, Leverage for District Portion of Larger grant Energy Efficiency Grant $500,000 from State $180,000 from Utility incentives Borrowing $444,000 to pay back from Energy Cost savings Remaining non-functional Heat Pumps will be replaced. 17 units replaced by contractor 10 units replaced by owner Contractor installed Control system for central management Replace remaining less efficient light fixtures Replace flush valves and fixtures and install aerators All Work must be completed by June Maintenance: Grants

Equipment Storage and Grounds Shop Recent Equipment acquisitions need storage Previous Grounds Shop –Now Mt View Staff Parking Lot Grounds shop located under the stadium Equipment and shop is locate in and around student areas New Safer location to be further from student areas Equipment stored around stadium interferes with other activities More Efficient for Grounds staff Staff Report to directly to their designated work area Reduced on clock travel time, more time on task Maintenance: Facility Needs

Maintenance: Facilities Grounds Phase 1, Parking for Grounds truck and trailer to drive through, one stall for both lifts to be out of weather. Phase 2, More inside storage and work area for maintaining grounds equipment Phase 3, Expanded storage replace steel containers

Maintenance: Facilities

Maintenance: Main Facility Needs At Maintenance Shop. Begin clearing old buildings to make room for more secure and covered parking Add power for lighting and heat to upper storage area Paint Exterior of building Develop plans to fold into next Facility study for Bond further development of this site

Maintenance: Major Projects Replace failed HVAC equipment at SHS Extend conservation efforts through Grant Funding Tennis Court resurfacing and lights repaired

Maintenance: Major Projects

Rafter Tails – Stop deterioration

Maintenance: Major Projects Rafter Tails – Stop deterioration

Maintenance: Major Projects Recoat Mini-dome Cap Repair Choice Roof Remove Flex Ducts that contain Asbestos

Maintenance: Major Projects Repair Stadium Lights Rusting Electrical cans and missing heaters

Time for Questions