1 Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
WAYNE DALTON OF SYRACUSE PRESENTS:
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
OBJECTIVES 1. Characterize the various stages leading to the production of finished blueprints. 2. Differentiate between an architectural schematic.
Residential Fire Sprinklers Building Codes Plan PreparationPlan Preparation The sprinkler contractor should be required to submit a set of complete, detailed.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
Objectives To become familiar with a set of Construction Specifications; 1)Their layout and format. 2)The terms and definitions used and their legal ramifications.
Chapter 18 Working Drawings.
Quality Management – Cost and Time Management Initial Cost of Materials & Equipment Labor Cost Long Term Cost Time Management.
Building Codes Violation of building codes and regulations can cause injury to building users and expose architects to legal liability and the possible.
Chapter 9. Please read chapter 9.  Please review, know and understand the terms related to fire protection page 284.  Know the Classifications of.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
FPF190: Fire Protection Fundamentals FPF190 Fire Protection Fundamentals 1 Code Consultant.
Construction Contract Documents
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
Intro to Construction Drawings
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
Residential Construction Unit 1 Mr. Todzia.  Definition-Legal requirements designed to protect the public by providing guidelines for structural, electrical,
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
Construction Specifications
HVACR116 – Trade Skills Mechanical Drawings.
MODULE ONE BASIC BLUEPRINT READING PRINCIPLES
Architect By: Chia-Jade Lee & Chloe Horgan By: Chia-Jade Lee & Chloe Horgan.
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
Construction Specifications Foreman’s Development Series
Pre Incident Planning and Related Loss Reduction Strategies
Chapter 10 Fire Prevention. Introduction One of the most important and least recognized jobs that the fire department performs is fire prevention Prevention.
Construction Drawing Occupational Safety and Fundamentals
Specification & Quantities Estimating
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
Energy Curriculum Advanced Transportation Technology and Energy Initiative.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Understanding Fire Sprinkler Systems (c) Nothing in this Act shall be construed to prevent a fire sprinkler contractor licensed under the Fire Sprinkler.
© 2008 Delmar, Cengage Learning Fire Protection Systems and The Model Code Process Chapter 2.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Maine State Fire Marshals Office1 Laws and Codes Relating to Existing Apartment occupancies in the State of Maine Mark Stevens CFI-II, CFPS, CFPE Inspections.
4 Fire Prevention, Code Enforcement, And Fire And Life Safety Education Unit 4.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Sprinkler Loads on Trusses
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
ETP 1138C Week #2 Advanced print reading basics (Types of Engineering documentation) This week we will cover the following topics in class: We will introduce.
CEE 578 Senior Capstone Design Types of Construction Drawings
Sprinkler Loads on Trusses Educational Presentation.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
Estimating and Scheduling CEE 492
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
ISO17799 / BS ISO / BS Introduction Information security has always been a major challenge to most organizations. Computer infections.
Session 1: Identifying Construction Drawings and Drawing Components.
7 Chapter Plans, Specifications, and Codes. 7 Chapter Plans, Specifications, and Codes.
Author: Nurul Azyyati Sabri
Blueprint Reading and Care
Construction Documents
Photovoltaic Systems Engineering Session 19
Fire Protection Survey Procedure
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Commercial Construction Projects
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
Photovoltaic Systems Engineering Session 12
Fire Alarm Tech Practice Test # 16 NICET
Presentation transcript:

1 Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1

2 Objectives List the items that comprise a set of contract documents for the design of a special hazard or fire alarm system List the categories of drawings that comprise a contract drawing package Explain the differences among the categories of contract drawings

3 Objectives Evaluate a set of contract drawings to determine the value of each drawing relative to the accurate development of a special hazard or fire alarm system design Explain the problems associated with the designer of a special hazard or fire alarm system failing to reference drawings relevant to fire protection systems in a contract drawing package

4 Objectives List the divisions of the contract specifications Explain the relationship between a set of contract drawings and the contract specifications Determine the divisions of the specifications that are of most value to the development of a fire protection system design

5 Objectives Identify the problems that could develop if the contract specifications conflict with the contract drawings List the items that should be found in every designer’s survey kit Perform a survey of a building to be used for the design of a fire protection system

6 Objectives Survey and accurately determine dimensions of a reflected ceiling plan Survey a building using the structural elements as the primary points of reference Field-check a drawing of a fire protection system Perform metric conversions where appropriate 6

7 Objectives Evaluate design objectives for special hazard suppression systems Know the characteristics that define a special hazard Evaluate branches of the Fire Safety Concepts Tree Know the difference between prescriptive and performance-based design

8 Fire Protection as a Profession Fire professionals are dedicated to saving lives Serious errors or less than minimal fire protection can lead to death Application of technical knowledge is fundamental Ethical behavior on the same level as technical knowledge

9 Fire Protection Engineers and Technicians Fire protection engineer: –Licensed professional engineer –Can apply science and engineering to protect the public from the impacts of fire Fire protection technician: –Achieved NICET Level III of IV certification in the appropriate subfield –Knowledge, experience and skills necessary to lay out fire protection systems

10 Fire Protection Engineers and Technicians Functions of a fire protection engineer –Fire protection analysis –Fire protection management –Fire science and human behavior –Fire protection systems –Passive building systems

11 Fire Protection Engineers and Technicians Functions of a fire protection engineer –Evaluation of the hazards and protection schemes required to develop a workable, integrated solution to a fire safety problem –Preparation of design documents –Layout of fire protection systems

12 Fire Protection Engineers and Technicians Functions of a fire protection engineer (co –Affixing a professional seal to documents –Review fire protection installation shop drawings for compliance with engineer’s design –Monitor installation of fire protection systems –Responsibility for designing and maintaining competency through continued education

13 Fire Protection Engineers and Technicians Functions of a fire protection technician –The system layout in accordance with the engineer’s design –Shop drawings in accordance with the engineer’s design or as otherwise permitted by state regulations –Supplemental calculations based on the engineer’s design

14 Authority Having Jurisdiction (AHJ) Authority having jurisdiction (AHJ): individual or agency who reviews and approves drawings and completed installations Examples of AHJs –Municipal permitting organization –Fire prevention officer of the municipality –Insurance company –Governmental organization –Code official

15 Metric Conversions, Significant Figures, and Rounding Metric Conversion Act of 1975: requires conversion to the metric system for all federal projects by 1992 Buildings not designed using the metric system can cause problems Most fire protection calculations performed with two significant figures to the right of the decimal point

16 Metric Conversions, Significant Figures, and Rounding Metric units QuantityUnitSymbol LengthMeterm MassGramg TimeSeconds TemperatureKelvinK

17 The National Fire Protection Association Publishes more than 290 codes, standards, recommended practices, and guides for fire safety and design of fire protection systems Codes: mandatory requirement suitable for adoption into law Standards: mandatory NFPA requirements that may be used to approve a fire protection system Recommended practices: NFPA documents that provide non mandatory advice Guides: informative NFPA documents

18 Oral, Written, and Graphic Communication Fire protection professionals depend on the ability to clearly communicate complex ideas to a wide audience Communications skills include written communication, oral communication, and graphic communication

19 Graphic Communication: Drawing Fire Protection Systems Graphic communication - conveyed through drawings Drawing: graphic representation of a designer’s ideas Computer-aided design (CAD): computerized method of preparing drawings Fire protection system drawings are drawn to scale

20 Graphic Communication: Drawing Fire Protection Systems Figure 1-1 Computer aided design process for fire drawings

21 Figure 1-4. An architect’s scale is needed for design of fire protection systems Graphic Communication: Drawing Fire Protection Systems (con’t.)

22 Graphic Communication: Drawing Fire Protection Systems Drawing medium - the reproducible surface on which a drawing exists Size of the print medium must be larger than the drawing you are printing, to allow room for notes and a title block Cover sheet of a contract drawing contains a wealth of information for the fire protection designer

23 Site (Underground) Drawings Civil drawings: coordinate underground utilities entering and leaving a building or group of buildings Profile plan: shows reference elevations with respect to finished grade Invert elevation: references the bottom of a pipe with respect to the reference elevation

24 Architectural Plans Architectural drawings: drawings that show dimensions of walls, floors, ceilings, and other building features Plan job: design performed using new architectural plans as the basis for design Survey job: a project involving an existing building for which plans cannot be obtained

25 Structural Drawings Structural drawings: provide details related to the floors, roof, and structural elements of a building Foundation plans: show floor and wall structural details and sectional views Framing plans: show beam and joist size and elevation

26 HVAC Drawings HVAC drawings: heating, ventilating, and air conditioning drawings Supply diffuser: ceiling element used to distribute fresh air to a room Return diffuser: ceiling element used to draw stale air from a room Plenum space: space above a suspended ceiling that is kept under negative pressure for return air

27 Plumbing Drawings Designated in the contract set with a “P” prefix May show fire protection system piping layout or schematic Water supply and other fire protection- related information may be in the plumbing general notes

28 Fire Protection Contract Drawings Strong preference in the profession to display all fire protection and detection requirements on a separate set of contract drawings

29 Electrical Drawings Contract drawing set has an “E” prefix Useful to special hazard and fire alarm system designers Provide the location and power requirements of lighting and other electrical devices Locations of other electrical devices may also be shown on electrical drawings

30 Specifications Developed by architects and engineers from –Standardized computer specification database –Revisions to specifications for a project that may conflict with the contract drawings Performance specification: a general specification that provides the minimum information necessary to estimate, design, and install a fire protection system

31 Specifications Detailed specification: requirements for the design of a fire protection system –Little latitude for interpretation or alternatives Specification divisions: categories of building component groupings standardized by the Construction Specifications Institute Specification sections: detailed requirements for each CSI division

32 Specification Division Numbers and Titles Procurement and Contracting Requirements Group General Requirements Subgroup Facility Construction Subgroup Facility Services Subgroup Site and Infrastructure Subgroup Process Equipment Subgroup

33 Specification Division Numbers and Titles Fire protection systems and fire alarm systems are within Division 21 Formerly part of Division 15 Change resulted in better coordination and reduced conflict between two different contractors or subcontractors

34 Fire Protection Surveys Survey: investigation of a building and its components to take detailed measurements of the building as a reference for a fire protection drawing Get your bearings Determine the general building layout Bring proper survey equipment

35 Fire Protection Surveys (con’t.) Figure Survey equipment

36 Fire Protection Surveys Survey building details Develop a system design strategy Building elevations and ceiling measurements Water supply information Draw the building, layout the system, field- check the drawing and inspect the system after installation

37 Special Hazard Suppression Systems Protects hazards not amenable for protection by an automatic sprinkler system Special hazard categories –Large quantities of flammable liquids –Facilities containing valuable or irreplaceable commodities –Facilities where water may pose a danger

38 Special Hazard Suppression Systems Special hazard categories –Automatic sprinkler systems are not always fast enough for effective suppression –Mobile facilities where the transport of water is unfeasible –Facilities where service loss is intrinsically linked to facility loss or water damage –Facilities where high-tech research lost by fire or water damage could be significantly more than the dollar loss

39 Design Approaches for Special Hazard Design Requires evaluation of design objectives and design concepts, and implementation of design methodology Design objectives –Property protection and preservation –Life safety and preservation –Business continuity –Protection of the environment

40 Design Approaches for Special Hazard Design Design concepts: Fire Concepts Safety Tree (see Figure 1-13, Page 40) Design methodologies –Prescriptive design: direct use of national, local, or manufacturer standards to design a suppression or detection system –Performance-based design: an engineering approach to fire protection design (see Figure 1-14, Page 43)

41 Figure Steps in the Performance-Based Analysis and the Conceptual Design Procedure for Fire Protection Design Design Approaches for Special Hazard Design

42 Summary Must understand differences between a fire protection engineer and a fire protection technician Knowledge of oral and written communication and media is essential, particularly computer-aided design Contract documents consist of contract drawings and specifications

43 Summary Contract drawings consist of the cover sheet and civil, architectural, structural HVAC, plumbing, fire protection and electrical drawings All documents used to minimize conflicts or omissions that could affect performance of a fire protection system Specifications generally take precedence over contract drawings

44 Summary Specifications divided into specification divisions Specifications for fire suppression systems are located in Division 21 Fire alarm systems are in Division 28 An organized and well-planned strategy for conducting a survey assures a successful result

45 Summary Fundamental approaches, objectives, concepts, and methodologies related to special hazard and fire alarm design must be understood and evaluated before commencing design