Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.

Slides:



Advertisements
Similar presentations
M2FS SAC UpdateMarch 18, 2012 System Overview: M2FS Spectrograph Two independent, identical channels Each fed by 128 fibers Each with LoRes and HiRes modes.
Advertisements

CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
Dennis Coyne Excomm Jan 26, 2004
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
MMT Magellan Infrared Spectrograph ( MMIRS ) P.I. Brian McLeod Warren R. Brown SAO/CfA.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Magellan f/5 Planning and Status Andrew Szentgyorgyi Magellan SAC Meeting Pasadena/17 Mar 2012.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Committees.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Telescope Integration and Tests Tuesday Afternoon.
Quarterly Review January 24, QUARTERLY REVIEW January 24, 2002.
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
Cormac Neeson Space Engineering and Technology GERB Project Status 22/03/2004.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Existing instruments Future Instruments.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
Binospec - Next Generation Optical Spectrograph for the MMT
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.
Magellan Telescopes Observatory Report Personnel Network/Systems Administration Observing Statistics.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
Pasadena Updates March February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
MMIRS Status A.Szentgyorgyi/SAO 30 April Imaging 7 x 7 arcmin FOV 0.2 arcsec pixels Y,J,H & K wavelength coverage Spectroscopy Multislit (4’ x 7’)
Incoming instruments. New instruments IMACS MOEMultiobject echellette LDSS upgradeMultiobject optical spectroscopy CorMASSLow-res visiting NIR spectrograph.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/04 MMIRS Status Report Brian McLeod.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
Planning of the EUSO-BALLOON project Sylvie Dagoret-Campagne on behalf of the JEM-EUSO collaboration, EUSO-BALLOON project manager LAL/France EUSO BALLOON.
F/5 telescope work Secondary mirror polishing (SOML) Secondary mount support controls Active optics controls Flat field screen & lamps Telescope baffles.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Jim Fast Pacific Northwest National Laboratory
The Importance of Solar Car Project Management
Bill Raynor Naval Research Lab
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Blanco F/8 Status AURA Observatory Council, Tucson, 3/2013.
P07307: Controls for Dynamic Suspension
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Mechanical Integration
Prime Focus Imaging Spectrograph Status
ETS For ACTR 9the April 2015 R.Tighe april 2011 april /04/2015
COSMOS Status David Sprayberry, Sean Points & Jay Elias
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
The Importance of Solar Car Project Management
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005

F/5 Wide field corrector optics done & coated Lens cells 95% done Lift fixture done & on LCO Topbox (shutter, filter changer & wavefront sensor ~85% done) Engineering trip planned for mid-October SAO on hiatus 15 Nov ? to move Central Engineering (and all Magellan WFC hardware not at LCO) to new site Dialogue Megacam/MMIRS/Minicam on software interfaces proceeding News Summary

Wide Field Corrector Lenses & Prisms AR Coating Sol Gel coatings accepted at Cleveland Crystal late June 2005, shipped to SAO. In shipping containers until start bonding lenses into cells late Spring 2006 (after move). All coating meet specifications and are cosmetically excellent.

Wide Field Corrector Optic Cells Lens cell fabrication ~90% done. During October 2005 engineering visit will fit check lens cell assembly and verify procedures and ancillary equipment without lenses installed. Final machining operations at Bechdon not complete in time to ship for October operations, so will return cells to Bechdon to finish cells – expect all cell fabrication complete around 1 Jan 2006 Bonding lenses and prisms into cell must be done at new site - Cambridge Discovery Park (CDP) – which is still under construction. Taking pessimistic view that moving operations will take 5 months – so planning to do bonding in March – May 2006 interval.

Lift Cart Lift cart is used to install all SAO instrumentation on Clay Delivered to LCO 2 Sept 2005 Two bearings leaked in transit, but fixed by Frank et al., otherwise in good working order.

Lift Cart

Instrument Adapter Instrument Adapter (IA) is interface between MMT instrument interface and Clay telescope Weighs 1200 lb, significant contribute to mass on Cass rotator Was delivered to LCO 23 April 2005, but have not had opportunity to fit check on Clay yet Will fit check during October 2005 engineering

Filters SAGEM has been contracted to make a complete set of Sloan filters for MegaCam. Filters will be single-substrate. Delivery is expected Feb 2006.

TopBox Contains shutter, filter changer and wave front sensor At present, only needed for Megacam – MMIRS has integral guide, wavefront sensing & filter wheel Mechanical assembly nearly complete Critical path is electronics and electronic enclosure Wave front sensor only “new” subsystem – testing in progess Current plan is to complete before move, ship to LCO in late Nov.

Continuing dialogue between Skip and SAO software engineers – Dylan Curley, Maureen Conroy and John Roll Expect all electronic subsystems complete by 15 Nov 2005 Start testing Mar Software/Electronics

Oct 2005 – Engineering visit will demonstrate corrector fits and we can install it safely Nov/Dec 2005 – Topbox complete, ship to LCO 15 Nov 2005 – Hiatus at SAO Jan Receive finished lens cell Mar 2006 – Start bonding lenses into cells - Resume subsystem testing May 2006 – Bonding complete May – Fall 2006 – System integration/test Fall 2006 – Ship remaining elements to LCO Fall 2006 – Trip to install computers, lay cables, test software interface between wavefront sensor and Clay. Bench test Minicam. January 2007 – First light of F/5 with Minicam Roadmap to Finish

Team involves including MMTO instrument and software scientists (T. Pickering & G. Williams) Fit/ops check of wide field corrector installation ” blind clearance between wide field corrector & mirror shrouds Refinement of elec./mech./software interfaces and ops planning Tune lift cart parameters October Engineering Trip

To verify stiffness of rotator bearings, pull test has been performed on Baade rotator Results indicate bearings approximately 1/3 as stiff as Rotek specifications Even with this reduced stiffness, bearings marginally meet requirements for F/5 instrumentation Imprtant to verify that Clay bearing is the same as Baade – perform test this October Pull Test on Clay Bearing

Project Status Expect on-schedule delivery in early Jan 2007.