TB 20.7.06 Peter Glässel, Heidelberg1 TPC Progress.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
DAQ for the TPC Sector Test at Test Beam T10 ALICE DAQ Group ALICE TPC Collaboration Meeting Cagliari, Sardinia 16 – 17 May 2004.
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
1P. Vande Vyvre - CERN/PH ALICE DAQ Technical Design Report DAQ TDR Task Force Tome ANTICICFranco CARENA Wisla CARENA Ozgur COBANOGLU Ervin DENESRoberto.
11/12 December 20061Borge S. Nielsen, NBI FMD contribution Second Installation and Commissioning Workshop DAQ and ECS FMD contribution Børge S. Nielsen,
HLT & Calibration.
Dariusz Miskowiec, TRD status meeting Oct alignment... i.e. how to figure out where the detectors are, and how to use this knowledge in the reconstruction.
Update on DAQ Klaus Schossmaier CERN PH-AID ALICE TPC Meeting 21 April 2006.
> IRTG – Heidelberg 2007 < Jochen Thäder – University of Heidelberg 1/18 ALICE HLT in the TPC Commissioning IRTG Seminar Heidelberg – January 2008 Jochen.
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
TB Peter Glässel, Heidelberg1 TPC Status.
LP TPC DAQ Ulf Mjörnmark Lund University Present understanding and plan.
Jochen Thäder – Kirchhoff Institute of Physics - University of Heidelberg 1 HLT for TPC commissioning - Setup - - Status - - Experience -
1 TPC online  offline calibration November 2002.
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
ALICE DAQ Plans for 2006 Procurement, Installation, Commissioning P. VANDE VYVRE – CERN/PH for LHC DAQ Club - CERN - May 2006.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
1 Alice DAQ Configuration DB
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita.
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
FEE + ROC cooling S. Popescu CERN, U. Frankenfeld, H.R. Schmidt GSI.
DT1 Gas Section Debrief of 2005 activities.. The Purpose of the Debrief  Compare plan and achievements.  Analyze how the work is done ? Do we meet the.
Roberto Divià, CERN/ALICE 1 CHEP 2009, Prague, March 2009 The ALICE Online Data Storage System Roberto Divià (CERN), Ulrich Fuchs (CERN), Irina Makhlyueva.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Muon Stations M2-M5 Hardware status Outline: Gas System status UF/PNPI HV-system status Remaining M2-M5 installation tasks – Air cooling system status.
ALICE TPC Status, Meeting with LHCC referees ALICE TPC – Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader:
Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage…………………
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Panel production status Panels needed according to official plan Oct-05 A rate of 250/month is mandatory to match the chamber production schedule.
Taku Gunji Center for Nuclear Study The University of Tokyo
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
DCDB A. Sandoval TPC meeting, Tanka Village 16 May 2004.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Marian Ivanov TPC status report.
Pre-installation and Functional Tests
TPC Commissioning: DAQ, ECS aspects
Commissioning of the ALICE HLT, TPC and PHOS systems
SPD – ALICE DAQ/ECS/Trigger Integration Status Report
TPC Status Outline Completion of installation 14 September 2006
TPC Detector Control System
Presentation transcript:

TB Peter Glässel, Heidelberg1 TPC Progress

TB Peter Glässel, Heidelberg2 Outline / Summary Gas system: 2 ppm O 2 Exact CO 2 -fraction still unknown to ~0.5%, under investigation with new gas chromatograph cell that separates the three components

TB Peter Glässel, Heidelberg3 Summary continued ROC commissioning: ¼ done Leak problem with leakless cooling system of FEE, fixed 4 to 3 days per 2 sectors No chamber with serious defects found Damaged cables, bad capacitor Some small issues yet to be understood Gathered data are archived Zero-suppression operational Offline Commissioning with test data Calibration issues under study

TB Peter Glässel, Heidelberg4 Summary continued Laser system Autotracker mode operational Central electrode signals seen with laser DAQ: closer to final configuration Signal splitting for HLT works in principle, still in debugging phase of HLT branch Preparations for moving to pit ongoing, detailed report in Sept TB

TB Peter Glässel, Heidelberg5 Improvements on water cooling of FEE Easier, safer connections at manifold in/out Proven procedure for changing sectors Clean water Pressure gauges at FEE in/out Flow meters in both branches Flow can be controlled by bypass Optimized alarm settings and timing Test: no leakage if a silicon hose is disconnected

TB Peter Glässel, Heidelberg6 A-side done 1/2 RCU’s are produced ‘just in time’

TB Peter Glässel, Heidelberg7 Gain uniformity, OROC 50% change of pad size

TB Peter Glässel, Heidelberg8 Gain IROC Target value: ch 30 Requires gas gain ~10000 (in IROC)

TB Peter Glässel, Heidelberg9 Gain spikes in OROC 4 Seem to diminish with time Anodes with poor contact, leading to neighbors with higher gain? Under further investigation (today) 4 weeks later

TB Peter Glässel, Heidelberg10 Gate closure Tested with high amplitude laser tracks (laser intensity x4) and higher gas gain At extreme values, gate leakage barely visible (gate 90 V) Quantitative interpretation difficult (laser non-linear), but order In OROC 13, gate has a leak Probably one floating wire (of ~900) still under study

TB Peter Glässel, Heidelberg11 DAQ Setup for TPC Commissioning ( ) TDS LDC GbE Switch (HP) LDC 6x DRORC PX24/CR2 PC TPC monitoring HLT-LDC 1x DRORC PX24/CR1 RCU SIU SXL2 GDC Server: DAQ, ECS, MySQL, MOOD Gateway aldaqtds03 2x 1.4 TB RAID5+spare, XFS RCU SIU 6x DDG 1x DRORC Server: SLC3,DHCP, DNS,… pcald25 /local (134GB) aldaqds00 1 aldaqds00 2 /mdlocal aldaqpc00 1 aldaqpc01 3 aldaqpc01 0 aldaqpc01 2 aldaqpc01 1 SLC Castor DATE 5.19 MySQL MOOD ECS MB/s (to be upgraded) /tds GDC mStream aldaqpc00 2 aldaqcon0 3 /tds1 alicedaq / LikeOps LTU TTCvi, TTCex lnxpool1 3 TTC GbE Switch GPN HLT Farm — Sector1 —— Sector2 — 502 rcu / rcu123

TB Peter Glässel, Heidelberg12 TPC further schedule Commissioning of ROCs scheduled till Move to UX2 scheduled mid Oct

TB Peter Glässel, Heidelberg13 -- Spares --

TB Peter Glässel, Heidelberg14 3D view of single track

TB Peter Glässel, Heidelberg15 First tracks in the TPC, projection view isolated trackcosmic shower