Ned Arnold 13 July, 2009 Convenience Tools … July 13, 2009.

Slides:



Advertisements
Similar presentations
Module 17 Tracing Access to SQL Server 2008 R2. Module Overview Capturing Activity using SQL Server Profiler Improving Performance with the Database Engine.
Advertisements

1 Minnesota State Lottery NASPL World Meet Conference Optimizing Retailer Visits.
TTF1/TTF2/XFEL/LC stability/reliability Stability: FEL requests beyond specs. What was measured? What needs to be measured What needs to be compared to.
Target Monitoring and Control Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
DAQ Considerations For Increased Rep. Rate J. Leaver 01/12/2009.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
LIGO-G0200XX-00-M DMT Monitors: Beyond the FOM John Zweizig LIGO/Caltech LLO August 18, 2006.
Hall D Solenoid Controls. Rockwell Software Overview RSLogix5000 (PLC Programming) RSLinx Classic (Rockwell software/hardware interface) FactoryTalk (GUI.
1 MUST HAVE SHOULD HAVE COULD HAVE Module # Configuring the Qi Cluster Objectives: Know the sequence of configuring the Qi Cluster Know how to.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Beam diagnostics control for J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
An Environment for Matlab Analysis of DAQ Data from the 9ma Experiments Ned Arnold October 2009.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
1 PoGO spring-8 BeamTest preparation Tsunefumi Mizuno and others June 2, 2003 at teleconference.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
JANA and Raw Data David Lawrence, JLab Oct. 5, 2012.
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
Nick Walker (DESY) John Carwardine (ANL) GDE ILC10 Beijing March 2010 Cryomodule String Test: TTF/FLASH 9mA Experiment.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
John Carwardine 21 st October 2010 TTF/FLASH 9mA studies: Main studies objectives for January 2011.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
John Carwardine 29 October, mA meeting 1. Agenda 9mA workshop Data analysis DAQ refresher / online database 2.
John Carwardine 13 th April, 2011 Report on the 9mA program.
FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Machine Protection: Status + Outlook Status of the fast protection system Beam.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
John Carwardine 20 April 09 Preliminary planning for Aug/Sept studies.
John Carwardine (Argonne) First Baseline Allocation Workshop at KEK September 2010 Experience from FLASH ‘9mA’ experiments Gradient and RF Power Overhead.
LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 LLRF for the FLASH 9mA Program S. Simrock DESY, Hamburg, Germany.
Monday, August 04, 2003Boeing - Joe Hoffert Instrumentation Overview Motivation/Vision Initial Implementation Current Functionality Usage Future Direction.
Monitoring for the EMEC/HEC Combined Run in August HEC/FCAL/Combined Testbeam Meeting 16 April 2002 Rob McPherson for the UVic group (Fincke, Kanaya, Keeler,
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
#16 Application Measurement Presentation by Bobin John.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
John Carwardine January 16, 2009 Some results and data from January studies.
GDE meeting Beijing (Mar.27, 2010) 1 DRFS LLRF system configuration Shin MICHIZONO KEK LLRF lack layout for DRFS DRFS cavity grouping HLRF requirements.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
[A Refresher On …] Tools for Matlab Analysis of DAQ Data [ from the 9ma Experiments] Ned Arnold October 2009.
ORNL is managed by UT-Battelle for the US Department of Energy Status Report: Data Acquisition and Instrument Controls for the Spallation Neutron Source.
Franz-Josef Decker 14-Dec-2011 CSR is a big deal limiting performance Tolerance studies beforehand helped a lot Tor’s List Software adaptability helped.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
Overview Step by step procedure to validate the model (slide 1 and 2) Procedure for the Ql / beam loading study (slide 3 and 4)
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
David Lawrence JLab May 11, /11/101Reconstruction Framework -- GlueX Collab. meeting -- D. Lawrence.
John Carwardine TDR Writing: FLASH 9mA Experiment.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2.
2 Introduction ● Goals/deliverables: – Developed applications that will support LLRF controller work, operation and commissioning efforts as well as other.
LCLS Commissioning & Operations High Level Software
Monitoring Windows Server 2012
TTF/FLASH 9mA Experiment Recent Machine Studies Overview
ILC LLRF Status Ruben Carcagno, Brian Chase
Planning the Experiment
Automation and Feedbacks
LLRF Controls Outline Requirements External Interfaces Schedule Design
LLRF Functionality Stefan Simrock How to edit the title slide
LCLS Commissioning & Operations High Level Software
A Portion of the SCP RF Control System LCLS Related
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Low Level RF Status Outline LLRF controls system overview
LLRF Control System Outline Scope Requirements Design Considerations
DAT381 Team Development with SQL Server 2005
Low Level RF Status Outline LLRF controls system overview
A Virtual Implementation of VELA (CLARA)
VELA – CLARA AP (Draft) Goals Software Goals
Presentation transcript:

Ned Arnold 13 July, 2009 Convenience Tools … July 13, 2009

Possible Convenience Tools Possible areas where some “convenience” could be provided to ensure maximum efficiency during the 9mA run Directory of Property Names of Interest and their associated DAQ name (especially new properties) “Data of Interest” preprocessor Thorough analysis of Dump temperatures to confirm beam position Convenient “Correlation Tool” which provides the most useful correlations “9mA Run Goal Monitor” July 13, 2009

Directory of Property Names Goal Table of property names of interest, description, associated DAQ name Preferably “query-able” Sources List from Mariusz to John C (Aug 08) Additions from Olaf Numerous Matlab scripts DAQ GUI Viewer, DDD screens linac_main_run*_chan_dscr.xml,, Developers of new servers for August Where else? July 13, 2009

“Data-of-Interest” Pre-processor Planned 2 week run will generate a lot of data How can we make accessing “data of interest” more convenient? For short periods of “data of interest” … Record time frame of interest (e.g. 2009/09/11;15:15:00 – 2009/09/11;15:30:00) Record short description of event Fetch data from DAQ and slow history for designated “Channel Groups” Store relevant data in a.mat file along with some preprocessed results (plus a description) Provide a report/list of stored events July 13, 2009

9ma-Run Goal Monitor Primary Goals (from GDE AAP Review of April ‘09) Demonstration of beam energy stability Over extended period Characterization of energy stability limitations Operations close to gradient limits Quantification of control overhead Minimum required klystron overhead for LLRF control HOM absorber studies (cryo-load) Is there a semi-real-time monitor for beam energy stability? July 13, 2009

Tools/Scripts for Operations Script for on-the-fly analysis of cavity jitter Correlation Tool designed for most popular correlations Convert dump temperatures into beam position Script to analyze dump line BLM data Script to do cursory performance analysis of overnight run Hardware and software set-up for fast shutting down RF in case of BIS alarms Optimization of cavities filling procedure by phase modulation to reach possible high gradient Write Matlab script for quench and different kind of exception analyzes from DAQ data July 13, 2009

Possible Convenience Tools Possible areas where some “convenience” could be provided to ensure maximum efficiency during the 9mA run Directory of Property Names of Interest and their associated DAQ name (especially new properties) “Data of Interest” preprocessor Thorough analysis of Dump temperatures to confirm beam position Convenient “Correlation Tool” which provides the most useful correlations “9mA Run Goal Monitor” July 13, 2009 ?? Which one(s) yield the biggest payback ???