LBT Q1 2008 Eng/SW Review TEL – TELEMETRY Tony Edgin.

Slides:



Advertisements
Similar presentations
SAP Memory Management (an Overview)
Advertisements

Starfish: A Self-tuning System for Big Data Analytics.
Operating System.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
A tour of the integration between Macola ES / Progression and Preactor V11 Preactor.
Hard Disk Assemblies. Inside a Hard Disk How a Hard Disk Works.
RMax – Report Maximizer. Report Designer to design your own reports in Excel / HTML Define user specific interfaces to extract data from your ERP Define.
The Role of DBMS in Computing
Module 1: Server Roles and Initial Configuration Tasks
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
ALCME: OAI at OCLC Jeffrey A. Young OCLC Online Computer Library Center, Inc.
f ACT s  Data intensive applications with Petabytes of data  Web pages billion web pages x 20KB = 400+ terabytes  One computer can read
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
Yokogawa Electric Corporation Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
Unit 8b Troubleshooting; Maintenance and Upgrades; Interaction with Vendors, Developers, and Users Component 8 Installation and Maintenance of Health IT.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 Introduction to Microsoft Windows 2000 Windows 2000 Overview Windows 2000 Architecture Overview Windows 2000 Directory Services Overview Logging On to.
A tour of the integration between Macola ES / Progression and Preactor V11 Preactor.
Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
Middleware for FIs Apeego House 4B, Tardeo Rd. Mumbai Tel: Fax:
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Software Review GCS – Guiding and Active Optics.
20 October 2008LBT Q Eng/SW Review0 PCS – Pointing Control Subsystem Michele De La Peña.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
Martin Hewitson Data access for GEO600. GEO DC workshop June Overview A variety of tools exist for on-line and off-line analyses Aux info.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review MCSC – Mount Control System.
Control & Data Handling, Operator Control, Aircraft Interface to C&DH Steve Musko Space Physics Research Laboratory University of Michigan Ann Arbor, MI.
May 10, 2001An Overview of the Princeton University Web - Library Princeton University Library  History of Web Presence –Started 1994/5 when Mosaic browser.
Chapter 06: System Software. Definition  Master program  Controls all hardwares connected to computer  Collection of programs Users Application software.
Virtualization and Databases Ashraf Aboulnaga University of Waterloo.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
1 Chapter 6 Computer Software. 2 Manager’s View u Manager’s need to understand various kinds of computer software - makes the hardware work for you. u.
LBT Q Eng/SW Review MCSC – Mount Control System.
Computer Science 340 Software Design & Testing Software Architecture.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
1 LBT Q Eng/SW Review PWR: Site electrical power.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
Distributed Pattern Recognition System, Web-based by Nadeem Ahmed.
21 July 2008 LBT Q Eng/SW Review 1 SIN – Software Infrastructure Titus Purdin.
Chapter 5: MULTIMEDIA DATABASE MANAGEMENT SYSTEM ARCHITECTURE BIT 3193 MULTIMEDIA DATABASE.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
1 LBT Q Eng/SW Review PWR: Site electrical power.
Enterprise Resource Planning (ERP) The need for integrated information in business.
CEG 2400 FALL 2012 Windows Servers Network Operating Systems.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
ITMT 1371 – Window 7 Configuration 1 ITMT Windows 7 Configuration Chapter 8 – Managing and Monitoring Windows 7 Performance.
Operation team at Ccin2p3 Suzanne Poulat –
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
Copyright © 2012, SAS Institute Inc. All rights reserved. SAS ENVIRONMENT MANAGER CARMINE VERRELLI - TECHNICAL TRAINING SPECIALIST.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Planning for Testing In a DevOps World.
Acutelearn Technologies Tivoli Storage Manager(TSM) Training Tivoli Storage Manager Basics: Tivoli Storage Manager Overview Tivoli Storage Manager concepts.
A pattern classifier based approach to Campaign planning
Project Title This is a sample slide layout
WHO Technical Reference Group Paediatric HIV/ART CARE
Overview of Computer system
Presentation transcript:

LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin

April 4th, 2008LBT Q Eng/SW Review1 Progress Telemetry collection Telemetry collection Implemented database interface √ Implemented database interface √ Trained developers on how to interface with Telemetry √ Trained developers on how to interface with Telemetry √ Telemetry storage Telemetry storage Purchased database server computers √ Purchased database server computers √

April 4th, 2008LBT Q Eng/SW Review2 Open Issues Technical Technical Will telemetry collection overburden TCS subsystems? Will telemetry collection overburden TCS subsystems? How much memory may be used for buffering diagnostic samples? How much memory may be used for buffering diagnostic samples? Can telemetry be buffered to disk fast enough to record a 2 kB sample every 250 µs for 1 hour in the operational environment? Can telemetry be buffered to disk fast enough to record a 2 kB sample every 250 µs for 1 hour in the operational environment? Schedule Schedule What is the next most urgent task for Telemetry (monitoring or data exportation)? What is the next most urgent task for Telemetry (monitoring or data exportation)? Financial Financial None None Resource Resource None None

April 4th, 2008LBT Q Eng/SW Review321-Dec-2007 LBT Q Engineering Review Planning Release Telemetry Collection internally (Apr) Release Telemetry Collection internally (Apr) Deploy telemetry database server computers (May) Deploy telemetry database server computers (May) Deploy Telemetry Collection, including basic data extraction scripts (May) Deploy Telemetry Collection, including basic data extraction scripts (May) Revise project plan (May) Revise project plan (May)