IceCube Data Acquisition :: Status Presentation before the IceCube Science Advisory Committee W. R. Edwards / K. Hanson for DAQ Mar 29, 2006 – Madison,

Slides:



Advertisements
Similar presentations
Internet for multimedia content Yogendra Pal Chief Engineer, All India Radio.
Advertisements

Instrumentation - Results from first season and plan for 2005 A. Karle Iceube Collabration meeting Berkeley March 19, 2005.
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Receiver-driven Layered Multicast S. McCanne, V. Jacobsen and M. Vetterli SIGCOMM 1996.
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
Teaching material based on Distributed Systems: Concepts and Design, Edition 3, Addison-Wesley Copyright © George Coulouris, Jean Dollimore, Tim.
6/16/20151 On Designing Improved Controllers for AQM Routers Supporting TCP flows By C.V Hollot, Vishal Mishra, Don Towsley and Wei-Bo Gong Presented by.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
IceCube 1400 m 2400 m AMANDA South Pole IceTop Skiway 80 Strings 4800 PMT Instrumented volume: 1 km3 (1 Gt) IceCube is designed to detect neutrinos of.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Operating Systems.
Sebastian Böser Acoustic test setup at south pole IceCube Collaboration Meeting, Berkeley, March 2005.
Communication Networks
IceCube System Testing
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
IceTop Tank Calibration Abstract This report outlines the preliminary method developed to calibrate IceTop tanks using through going single muon signals.
Sean Grullon with Gary Hill Maximum likelihood reconstruction of events using waveforms.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
The GANDALF Multi-Channel Time-to-Digital Converter (TDC)  GANDALF module  TDC concepts  TDC implementation in the FPGA  measurements.
Diana Parno – July 22, 2008 January PREx Test Run: Compton Photon Analysis Diana Parno Carnegie Mellon University HAPPEX Collaboration Meeting.
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: “DOM MB to Event Builder”
IceCube: String 21 reconstruction Dmitry Chirkin, LBNL Presented by Spencer Klein LLH reconstruction algorithm Reconstruction of digital waveforms Muon.
Greg Sullivan University of Maryland Data Filtering and Software IceCube Collaboration Meeting Monday, March 21, 2005.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
AMANDA and IceCube neutrino telescopes at the South Pole Per Olof Hulth Stockholm University.
ECS 152A 4. Communications Techniques. Asynchronous and Synchronous Transmission Timing problems require a mechanism to synchronize the transmitter and.
String-18 New-DAQ Commissioning Azriel Goldschmidt AMANDA Collaboration Meeting Berkeley, March 2002.
Computer Networks with Internet Technology William Stallings
PMT Output, ATWD input, and Trigger Comparator Input Issues IceCube Note _105 Gerald Przybylski Lawerence Berkeley National Laboratory August 22, 2002.
Standard Candle, Flasher, and Cascade Simulations in IceCube Michelangelo D’Agostino UC Berkeley PSU Analysis Meeting June 21-24, 2006.
DAQ: Status and Plans David Nygren Berkeley Collaboration Meeting March 21, 2005.
Azriel Goldschmidt AMANDA/IceCube Collaboration Meeting Laguna Beach, CA March 2003 String-18 Progress and Plans.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
IceTop DAQ: 1 David Seckel – 8/27/2003, College Park, MD IceTop DAQ David Seckel University of Delaware.
IC59 Cascade Filter Comparison between the recos for (HLC+SLC) and (HLC only) pulses Part I Mariola Lesiak-Bzdak LBNL 1 Cascade Phone Call, Nov. 8, 2010.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
String-18 Development Workshop, Overview Azriel Goldschmidt AMANDA/ICECUBE Collaboration Meeting Berkeley March 2002.
Online Monitoring for the CDF Run II Experiment T.Arisawa, D.Hirschbuehl, K.Ikado, K.Maeshima, H.Stadie, G.Veramendi, W.Wagner, H.Wenzel, M.Worcester MAR.
IceCube Calibration Overview Kurt Woschnagg University of California, Berkeley MANTS 2009 Berlin, 25 September identical sensors in ultraclean,
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Software Engineering Requirements Review June 5, 2002 LBNL Chuck McParland.
5 June 2002DAQ System Engineering Requirements 1 DAQ System Requirements DOM Main Board Engineering Requirements Review David Nygren.
Feature Extractor Dima Chirkin, LBNL The future is here.
DOM MB Test Results at LBNL Main Board Readiness Status Review LBNL, July 2003 Azriel Goldschmidt.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Hardware Engineering Requirements Review June 5, 2002 LBNL David Nygren.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
Status of E14 G.Y.Lim IPNS, KEK. E14 Experiment Step-by-step approach to precise measurement of Br( K L    ) KEK-PS E391a J-PARC E14 (Step-1) J-PARC.
Testing DAQ PY04 Mark Krasberg University of Wisconsin Berkeley Collaboration Meeting 20 March, 2005.
Event Management. EMU Graham Heyes April Overview Background Requirements Solution Status.
DAQ Speed and Run2 Estimates April 3, Summary of FADC Development for Faster Performance NameReadoutTrigger ScalersScaler S1 (helicity gated), S2.
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: Implementation Plan.
IceTop Design: 1 David Seckel – 3/11/2002 Berkeley, CA IceTop Overview David Seckel IceTop Group University of Delaware.
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
Status of Detector Characterization a.k.a. Calibration & Monitoring Project Year 2 objectives ( → Mar ‘04) 1. Calibration plan (first draft in March.
1 Cosmic Ray Physics with IceTop and IceCube Serap Tilav University of Delaware for The IceCube Collaboration ISVHECRI2010 June 28 - July 2, 2010 Fermilab.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Future high energy extensions of IceCube with new technologies: Radio and/or acoustical detectors Karle.
DAQ (i.e electronics) R&D status in Canada
IceCube System Testing
A First Look J. Pilcher 12-Mar-2004
String 21 Flashers and AMANDA
String-21 Flasher Analysis
The CMS Tracking Readout and Front End Driver Testing
August 19th 2013 Alexandre Camsonne
Presentation transcript:

IceCube Data Acquisition :: Status Presentation before the IceCube Science Advisory Committee W. R. Edwards / K. Hanson for DAQ Mar 29, 2006 – Madison, WI

2 IceCube PAP Review Mar DAQ Capabilities Ideally, DAQ should be a transparent layer between signal and analysis; don’t want to worry about things like deadtime, saturation, charge/time resolution, other detector effects. We must live with physical detector elements: ice, PMT, … DAQ hardware (and downstream, software) designed to faithfully pass on photon arrival time information –Waveform digitization at ~300 MHz to 600 MHz, –Dynamic range of 1 – 10,000 p.e. –Low noise background: in event window of 10 us, 0.5 noise hits per string –Time-stamping of detector ‘hits’ to global precision of ~ 3 ns –Low deadtime: dominated by readout of ATWD: 30 us per ch, two ATWDs can be operated in “ping-pong” mode. One potential problem is depth of ATWD digitizer – only 128 samples per channel. For longer pulses one needs to fall back to FADC which is slower and has less dynamic range. Sample ATWD from DOM showing high, medium, and low gain channels for very large pulse. Inset shows typical SPE pulse

3 IceCube PAP Review Mar DAQ - Overview DOMs asynchronously collect hits at approx 500 Hz rate (optional LC trigger requirement limits rate to 5-30 Hz) –Hard LC mode – only send up hits with neighbor DOM coincidence hits – up to 4 distant. This results in some loss of hits. –Soft LC mode – hit compression dictated by presence of neighbor hit but some information propagated for all hits. No loss of hit information (maybe in SP) but carries higher overhead on DAQ to support additional data rate. Periodic readout into Hub – hub sends data packets out on TCP sockets to SP. Time transformation done in SP using RAPCal information (0.2 – 1 Hz rate of TCAL). Local oscillator / cable delays accounted for in real time! SP merges hits on global timestamp – sends trigger packets to trigger processors* Trigger processors merge hits from various SPs – form trigger based on requirement. Then send readout request to EB. EB readouts data from SP* and builds event.

4 IceCube PAP Review Mar DOM Mainboard In final leg of production – MB for strings produced by early next year. No significant changes from 5.0 (first production article). DOM firmware ‘complete’ with some TODOs: –DOM mainboard compression – this will reduce hit size by approx factor of 3. This is lossless compression – no information thrown away, bits packed more efficiently. –IceTop – specific enhancements; requirements not yet well understood. Some worrisome failures observed at Pole this year (1%) – under investigation – not necessarily MB per se: –2 DOMs drawing higher-than-normal current – appear to be operating normally however one also, perhaps not coincindentally, has LC problems –4 DOMs do not power up –Broken LC – with Hard LC requirement these DOMs are lost channels – will change with Soft LC DAQ –Bad flash sector on one DOM – this DOM is out of operation for DAQ currently but can be brought back.

5 IceCube PAP Review Mar Surface Software DAQ S/W not delivered in time for last year deployment. Data taken on String-21 with TestDAQ which was the primary DAQ tool for the DOM testing arena. Shortcomings of TestDAQ were that  FPGA image not optimized for rapid data taking – several kludges to take data meant that deadtime was large (0.5 ms)  Surface component did not trigger in real time: hits written to disk in 15- min chunks and analyzed by background process (monolith) However, TestDAQ still viable lightweight testing tool which is flexible and easy to deploy – so will continue to be used for ‘odd jobs’ such as commissioning and debugging. For this pole season, de-scoped DAQ delivery (called Plan A- )  Original design called for ‘lookback’ mode from EB  SP to gather full hit information. SP only passed downstream the trigger primitives to triggers to reduce the bandwidth,  In ‘Hard’ LC mode network / processors able to handle transmission of full hit info; EB collects all hit information internally and self-references during event building process. DAQ code delivered just-in-time (final cut of first release right before station close). Has been primary data-taking application since 2/13.

6 IceCube PAP Review Mar PY05 DAQ Software activities Improve stability of current software base (see later slide) Implement new features through series of major releases:  Supernova scalers  AMANDA Integration  Hit compression / SLC support  Plan A+  IceTop specific features Migration to 64-bit computing platforms and certification of DAQ support for 25 strings next season Continue to work on components to improve efficiency, reliability, and maintainability for future operations mode Primary focus in near term is on improving stability of DAQ

7 IceCube PAP Review Mar IceCube Events

8 IceCube PAP Review Mar Simple Majority Trigger – IceCube 9 strings SMT currently set to 8 hits in time window of 2 us (with hits in 10 us window built into event) Don’t have plot but this agrees reasonably well with MC data: 30% normalization error but shape

9 IceCube PAP Review Mar DOM Noise Rates Deployed Jan 2005

10 IceCube PAP Review Mar DAQ Livetime – Last 2 Weeks Since 2/13 DAQ has collected 200 million events (cf. 80 million for entire 2005). DAQ livetime averaged over period of 3/10 to 3/23 was 42% - some small portion of this was due to sharing of detector with verification activities. DAQ run scripts modified 3/24 to detect run crash sooner and restart runs more quickly DAQ livetime averaged over period since then has improved considerably (77% average livetime immediately following upgrade). Still short of target 90% livetime. This estimate is calculated from counting events in 24-hour period. At the current trigger setting we should have a steady rate of 138 events per second (83 physics events per sec) == 11.8 million events per day. Since 3/24, 30% of runs terminate abnormally before completion. Major contributors to crashes are (1) JVM crash; (2) stalled splicer queues

11 IceCube PAP Review Mar Conclusions DAQ H/W in very good shape – no indications that DOM design will not absolutely meet science goals for IceCube Production of DAQ H/W (DOM-MB, DOR, DSB, Hubs, Master Clock) well underway – nothing to indicate sign of serious problems here: DOM- DOR communication could be more well understood but currently meets our in-ice requirement of 1 Mb / s data rate. DAQ S/W had problems with delivery and is still struggling to catch up but currently functions for data taking. It’s a large animal, however, we need to proceed with measured progress. Some concern about maintainability of this software long term.