Pre-Lehman Review Briefing Reiersen December 18, 2006.

Slides:



Advertisements
Similar presentations
NCSX Mod Coil C1 features requiring rework at PPPL.
Advertisements

© Grant Thornton UK LLP. All rights reserved. Review of Sickness Absence Vale of Glamorgan Council Final Report- November 2009.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Summary of Low Cost Fabrication of Integrated Coil Structure L. M. Waganer With Support from Kevin Slattery.
ARIES Meeting, UCSD L. M. Waganer, June 2006 An Approach for Low Cost Fabrication of the Coil Structure L. M. Waganer With Support from Kevin Slattery.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
NCSX Metrology 1/7/04. Short term purchase recommendation Buy the Spatial Analyzer Software package –This software will be the user interface for operating.
From Research Prototype to Production
High-Accuracy, Repeatable Wrist Interface
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
1 NCSX Modular coil winding pack To shim or not to shim? NCSX WBS 1 Engineering Meeting July 7, 2004 What is requirement? What is baseline winding pack.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) – Stage 3 1.Make sure the requirements for the tooling is well defined.
Trip Report from CERN and Wendelstein W7-X October 6 – 13, 2007 Michael Viola; Steve Raftopoulos; Bill Sands October 6-10 CERN Geneva, Switzerland October.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
NCSX Metrology. Goals –Need to accurately make measure measurements for several NCSX systems Modular coil –As-built measurements of coil form –Conductor,
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
NSTX Response to the Lessons Learned Report NSTX TF Coil Repair Review September 3-4, 2003 Al von Halle.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
NCSX Field Period Assembly (FPA) Operations, Cost and schedule, staffing, and metrology utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
NCSX NCSX Trim Coil Peer Review 11/6/07 1 Tom Brown Art Brooks Raki Ramakrishnan Mike Kalish NCSX Trim Coil Peer Review.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Field Period Assembly Mike Viola NCSX Field Period Assembly Manager NCSX Project Review April 8-10, 2008.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
June 10, 2004Modular Coil Winding & Cooling WorkshopJ.H. Chrzanowski 1 Modular Coil Cooling Issues With Baseline & Status of Cooling R&D James H. Chrzanowski.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
Bushing Material The bushings are made of G11CR. However, it has been shown that deflections (and bolt stresses) due to shear loads not reacted by friction.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
NCSX Friction Coating Peer Review March 16, 2007 NCSX.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
A View of NCSX Structural System and Load Path for the Base Support Structure.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
DRAFT Cost and schedule, staffing, metrology utilization 10 AM October 12, 2006 Mike Viola Field Period Assembly Manager.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
NCSX Strykowsky 1Cost and Schedule Rebaseline April 25, 2005 NCSX Project Re-baseline Review April 25, 2005 Cost and Schedule Ron Strykowsky.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
8/15/2007Mike Viola1 NCSX Field Period Assembly + + = August 15, 2007 Mike Viola Field Period Assembly Manager.
12/19/2006Mike Viola1 December Lehman Review December 19, 2006 Mike Viola Field Period Assembly Manager NCSX Field Period Assembly + + =
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
1 VV Support Fixture FPA Stage 1 PDR Review August 10, 2005 T. Brown.
NCSX Modular Coil Joint Load/Stress Calculation By Leonard Myatt Myatt Consulting, Inc.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
1 NCSX Construction Overview NCSX Team (presented by L. Dudek) March, 2008.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Presentation transcript:

Pre-Lehman Review Briefing Reiersen December 18, 2006

Purpose of briefing We need to have and present a common understanding of our risks and mitigation plans We need to work together to update our near term plans ASAP –DOE has given us the nod on ECP53, an accounting windfall where we will assign budget to near term risks –We do not yet have a resource loaded schedule that hangs together. This needs to be priority one following the review. –A possible outcome of the Lehman Review is that they recommend re-baselining. That is months away and will not impact what we do with our hands and feet right now.

Current assessment of significant risks Risks previously identified at the May review have been retired or capped (MC winding costs) Emerging risks include… –Modular coil assembly cost and schedule –Field period and final assembly risks –Future procurement (Structures, PF coils) cost risks –150C bakeout system

Modular coil assembly cost and schedule The time and resources required to assemble the modular coils into 3-packs on FPA Station 2 was re-estimated –Design did not change but ETC did –Large amount of time devoted to Metrology Installing shear plates Custom fitting (grinding) shims –Number of shifts and labor costs more than doubled relative to the previous estimate for Station 2 Holding the schedule would require a second Station 2 plus some second shift work Assembly working group formed to bring fabrication and assembly input into design development

Assembly of modular coils

Assembly time on Station 2 more than doubled since September estimate [f] based on two stations, one 8hr shifts per day, and 21 days per month [g] based on 8 hours days at $85/hr

Options for reducing costs are being aggressively pursued Eliminate or reduce shear plates –Add bolts to the inboard legs Reduces required COF from 0.75 to 0.45 –Use high friction (diamond coated) shims on inner leg (not outboard) COF of 0.6 achieved on NSTX Prototype the shear plates, shims, and bushings to refine the installation procedure and the estimate for the time and resources Stock shims in multiple thicknesses so custom grinding is not required Issues to be resolved in January

Friction required to prevent IL slippage

Key activities to resolve MC interface design Friction testing (Gettelfinger) –Diamond coatings Grit size Binder Shim surface condition (mill, machined, ground, blasted) –Shim testing Shim surface condition (mill, machined, ground, blasted) G11CR on steel (flange) Steel (shim) on steel (flange) –Eventually do static and cyclic testing at 80K Bolted joint analysis (Myatt) –Determine capacity of pin joint –Determine max preload with through-bolts and with threaded holes Finalize design criteria for hybrid joints (friction joints with tight fitting bolts) Identify best locations for the minimum set of bolts to get us down below mu=0.45 in Brooks’ analysis Resolve bladder issues –Steel v. Teflon v. fabric –At wing tip only or under whole wing

Field period assembly risks Input at the FPA Peer Review gave us a keener appreciation of assembly risks Concerns raised included… –measurement accuracy and approach –metrology equipment type and number –alignment mechanisms –bolted joints and reaming operations –use of prototypes and mockups –schedule allowances Assembly risks extend to final assembly as well Do not appear to have a coherent plan for addressing these risks – need to get on this ASAP

FPA risks have been identified and mitigation plans are being developed Dimensional control objectives are at risk if the measurement campaigns are not well planned –The accuracy of the Leica laser tracker and Romer arm under real world conditions will be determined –Line-of-sight studies will be performed to determine the optimum number and placement of fiducials –Stability of the tooling will be factored into the tooling design Schedule and technical objectives are at risk if suitable trial assemblies are not performed on prototypes –The use of prototypes and mockups is being expanded Alignment options Shear plate prototype Coil assembly prototype using two Type C coils (including interface hardware)

FPA risks have been identified and mitigation plans are being developed Schedule and technical objectives are at risk if a sufficient complement of metrology equipment and support staff is not available –A metrology utilization study will be performed to determine the optimum metrology equipment type and number. Support staff requirements will also be assessed. –The budget for systems engineering support of metrology activities was recognized to be inadequate and is being increased in ECP53 to cover near term needs. –A metrology group has been organized within the Engineering Department in response to the support needs on projects like NCSX and NSTX –NCSX is pursuing options for involving experts outside NCSX in the project. Joe Error (ORNL/SNS) has said he would be glad to help. Need to get the elements of this plan into the resource loaded schedule ASAP

Future procurement cost risks Unconventional components always carry the risk of cost surprises before bids are received –MCWF/VVSA are good examples Significant spread among bids submitted Significant difference between prior budgetary cost estimates and bids from the same supplier –Raw material prices, e.g. nickel and stainless steel, are volatile and recently have been increasing much faster than inflation with a big impact on procurement costs Budgetary cost estimates are solicited and potential suppliers engaged in discussions to identify cost risks and focus value engineering efforts to mitigate cost impacts

PF Coils and Structures are the largest remaining procurements PF Coils (PF4, PF5, and PF6) –The diameter of the large ring coils (up to 18’) drives facility space requirements and raises transportation issues –Raw material costs (Cu) for conductor also a concern PPPL is investigating using internally cooled cable (QPS) conductor in the PF coil design –Fabrication costs are expected to be lower than with solid copper conductor –Transportation issue could be avoided by winding in the NCSX Mfg Facility with existing turntable –Could also be advantageous for PF1-3 (future upgrades) Estimates for outside procurement and in-house fab will be developed in the next two months –Possibly an $500K+ problem –Update on make-or-buy decision to follow

PF Coils and Structures are the largest remaining procurements Structures ($1013K budgeted) –Baseline design features large SS castings to support TF and PF coils –Dramatic increases in raw materials costs (stainless steel) introduce significant cost risks –Another $500K+ problem

Simplified structural support concept A radically simplified structural support concept is being considered which could reduce assembly time and cost as well as procurement costs –TF supported directly off the modular coil shell – no separate structure –Pre-load provided through ring above/below CS –PF5 supported off MC shell –PF6 supported off TF coils –CS and PF4 supported off floor –Modular coils supported directly by the base support structures Eliminates Stage 4 Allows access for C-C fit-up at final assembly if end TF coils are left out Need to evaluate performance, configuration, and C&S impacts ASAP and make a determination on whether to go ahead

150C bakeout system Current design for 150C vacuum vessel bakeout system relies on induction heating via the coils Non-uniform heating of the vessel and unwanted heating of the modular coils and other cold structures pose potential technical risks that have not been addressed An alternative being investigated is to blow heated air through the vessel heating / cooling tubes –If adopted, would cost an estimated $314K –Most of the cost is in SS piping which could also be used for 350C bakeout system –Inexpensive upgrade path to a 350C once-through air system is an attractive feature

Risks and mitigation options Emerging risks have been identified Options for reducing costs are being aggressively pursued Some cost risks appear unavoidable

Near term priorities Come to closure on modular coil interface design –Reasonably addressed in update on 1421 Develop a coherent development plan for FPA –Develop a well constructed plan for metrology and prototype/mockup tasks –Activities to date seem ad hoc rather than steps in a well constructed plan Decide on whether to pursue simplified structure option Document the path forward in an updated resource loaded schedule – all pieces have to fit together