Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.

Slides:



Advertisements
Similar presentations
XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
The applications of FA-M3 PLC used in SSRF ZHOU Dayong
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
1 The University of Jordan Mechatronics Engineering Department PLC: Programmable Logical Controller.
PLC DEVELOPMENTS FOR NEW VACUUM DEVICES IN THE LHC AND NA62
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Steve Lewis XTOD October, 2005 UCRL-PRES LCLS Week/FAC October, 2005 Steve Lewis X-ray Transport, Optics,
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES LCLS Week 4-8 April, 2005 Steve Lewis X-ray Transport, Optics, and Diagnostics:
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
NSLS/BNL PLC Choice Elliott Wolin 6-Jan-2010 Following are a few slides from a much longer presentation BNL chose Allen-Bradley – three month evaluation.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
ION PUMP HVFT / Connectors
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
Stephen Schuh Vacuum Controls Final Design 6 April 2006 Injector Vacuum Controls Hardware Final Design Review 6 April 2006.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Hall C’s HMS PLC Controls by Steven Lassiter. What Constituents a PLC System PLC (processors) Programming. I/O modules. Field Device Signals (sometimes.
Steve Lewis XTOD Controls FDR 13 March 2008 XTOD Vacuum Controls Final Design Review Steve Lewis/Keith Kishiyama 13 March 2008.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
PLC introduction1 Discrete Event Control Concept Representation DEC controller design DEC controller implementation.
PLC: Programmable Logical Controller
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Stephen Schuh Vacuum Controls Hardware 27 February 2006 LCLS Vacuum Controls Hardware Meeting 27 February 2006.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
Operational SNS Karen S. White Controls Group Leader 10/11/10.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Timing Outline System Concept Review Requirements.
Laser Heater Controls Overview 21 August 2008 Matt Boyes Laser Heater Controls Design Overview EPICS IOC Team Meeting Matt Boyes.
The recent history and current state of the linac control system Tom Himel Dec 1,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Steve Lewis Controls: Vacuum 5 April, 2005 UCRL-PRES LCLS Week 5 April, 2005 Steve Lewis Vacuum Standards.
Hamid Shoaee Control LCLS ARR Oct 31, LCLS Accelerator Readiness Review Control System for Injector Commissioning.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
April 2005OLAV Workshop Diamond Vacuum Controls Hugo S Shiers.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Danish Ali Nawaz 1CLIC workshop 2016 Danish Ali NAWAZ, BE-ABP LEETCHI: Drive Beam Electron Source Automation Control.
LEDA Vacuum Interlocks Bob Dalesio. Outline Leda vacuum system – displays and interfaces PLC Interlocks as presented to the operator EPICS interlock to.
Areal RF Station A. Vardanyan
LEDA Vacuum Interlocks
Performance of RHIC Vacuum Instrumentation and Control
XFEL Vacuum System Commissioning
LLRF Controls Outline Requirements External Interfaces Schedule Design
WP Coordinaten XFEL RF Operation
BEPCII RF POWER SOURCE AND INPUT COUPLER
SC1R Cold Box PDR Controls
LLRF and Beam-based Longitudinal Feedback Readiness
RF Local Protection System
DOE Review 11 May 2005 Stephen A. Lewis
LCLS Week 4-8 April, 2005 Steve Lewis
Hilko Spoelstra, Vacuum Group Specialized Technical Services / AD
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Vacuum Control System for Monolith Vacuum
DOE Review 11 May 2005 Stephen A. Lewis
Presentation transcript:

Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review Stephen Schuh 16 November 2005

Stephen Schuh Vacuum Controls SCR and 16 November 2005 Outline System Concept Review and Preliminary Design Review Requirements Personnel Engineering Requirements Block Diagram Interfaces Alternatives Test Plan Software Quality Control & Reliability Safety

Stephen Schuh Vacuum Controls SCR and 16 November 2005 Requirements Use existing controls for linac vacuum hardware where possible Fast and slow valves Vacuum gauges Vacuum pumps Waveguide vacuum protection for linac klystrons Remote control and status in EPICS for all new gauges, pumps, and valves. Gauge and pump readings in graphical and numerical form Valve status and control Infrastructure for archiving data and correlating data with other control system data Local control and status for all new gauges, pumps, and valves, when possible COTS gauge and pump controllers SLAC-built valve interface with open/close buttons, interlock status in support buildings SLAC-built valve interface (“J-Box”) in tunnel Key interlocks where possible

Stephen Schuh Vacuum Controls SCR and 16 November 2005 More Requirements Automatically close gate valves to isolate beam line regions where vacuum pressure exceeds the allowed upper limit Measure pressure with vacuum gauges and/or vacuum pumps Interlocks: associate each valve with gauges and/or pumps Configure interlock logic with software Ability to bypass a faulty gauge or pump from EPICS Notify MPS when a gate valve is closing or closed Shut off injector klystron modulators (the gun, L0-A, and L0-B) when waveguide vacuum pressure exceeds the allowed upper limit 3 beam pulse delay at 120 Hz acceptable (25 msec) Existing controls protect remaining linac klystrons Close all valves in a PPS region if that region is set to controlled or permitted access

Stephen Schuh Vacuum Controls SCR and 16 November 2005 Personnel Customers: SLAC Vacuum Group (MFD) SLAC Controls Department (CPE) Physicists and Operators First Need: Injector Commissioning – Nov 2, 2006 Team: Stephen Schuh – Software Tom Porter – Hardware

Stephen Schuh Vacuum Controls SCR and 16 November 2005 Engineering Requirements Response time of gauges: 15 msec is acceptable Interlock logic: ~3 msec is acceptable Communication with MPS: Notify MPS that valve is closing or closed Goal: shut off beam before it strikes a vacuum valve MPS responds within 8 msec Valve takes hundreds of msec to close

Stephen Schuh Vacuum Controls SCR and 16 November 2005 Block Diagram

Stephen Schuh Vacuum Controls SCR and 16 November 2005 Interfaces Control System: IOC needs Ethernet and serial (RS-232) PLC needs Ethernet; might also need private Ethernet to talk to other PLC crates Other Subsystems: Valve status to MPS: Shut off beam when valve is closed or closing. Waveguide vacuum status to modulator: Shut off modulator when WG vacuum is bad Access state from PPS: Close valves when in controlled or permitted access. T-Cav waveguide valve status to PPS: Keep people out of injector vault if valve is open Vacuum Components: Valve: VAT Series 48 Direct signals: air solenoid, open and closed limit switches, air pressure switch Gauge Controller: MKS 317, Helix 370 Direct signals: gauge HV permissive, pressure, set point relays Communication: RS-232 Pump Controller: Gamma Digitel MPC Direct signals: pump HV permissive, pressure, set point relays Communication: RS-232

Stephen Schuh Vacuum Controls SCR and 16 November 2005 Alternatives Valve control Use SLAC Programmable Multi Valve Controller instead of Allen-Bradley PLC Omit valve control interface Omit J-Box Ion Pump Power Supply Use Kaiser instead of Gamma Ion pump cable: Gamma SafeConn vs SLAC coax Gauges 15 msec gauge response vs ~100 msec gauge response

Stephen Schuh Vacuum Controls SCR and 16 November 2005 Test Plan Build prototype Hardware: IOC, PLC, valve, valve control chassis, J-Box, pump, four gauges Software: PLC code, EPICS software Location: MFD shop (they’re already testing gauges) Schedule: Most parts for prototype should arrive by Jan 1 Just starting work on IOC Test each component either before installation or in place

Stephen Schuh Vacuum Controls SCR and 16 November 2005 Software PLC code for valve logic (help from LLNL) EPICS database and screens EPICS device support Allen-Bradley ControlLogix PLC MKS 937a Gauge Controller Helix/Granville-Philips 370 Gauge Controller Gamma Digitel MPC Ion Pump Power Supply

Stephen Schuh Vacuum Controls SCR and 16 November 2005 Quality Control and Reliability System design similar to SNS PLC’s are widely used: vacuum, MPS, RF control, PPS Most components are already in use at SLAC Gauges and gauge controllers Allen-Bradley PLC J-Box for valve control Hardware new to SLAC Gamma ion pump power supply - Tom Porter’s tests

Stephen Schuh Vacuum Controls SCR and 16 November 2005 Safety Vacuum Safety Review – September 2005 Slides and report: Ion Pump HV Cable – 6 kV, 100 mA Gamma SafeConn vs SLAC coax SafeConn has an extra interlock wire – turn off HV when cable is unplugged This interlock gets no credit from SLAC electrical safety Mixed high voltage and low voltage cable Plan: Use SLAC cable instead of SafeConn cable