TECHNOLOGY TRANSFER, CAPACITY BUILDING, TRAINING AND DEVELOPMENT OF RICs. Dr. John Gorman Australian Bureau of Meteorology.

Slides:



Advertisements
Similar presentations
Chapter 8: Capacity Building Presented by Co Chair Mr. John Briceño CCAD Central American Countries 11/29/2003.
Advertisements

World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Climate & Water Department Side Event I: The Role.
WMO WIGOS Implementation & (WIP) RA I Sub-Regional Workshops for WIGOS and WIS for West / North Africa Nov 2013 Dr I. Zahumensky, WIGOS-PO.
19/5/2011 Cg-XVI, Doc. 3.1(4) World Meteorological Organization Working together in weather, climate and water WWW Programme Instruments and Methods of.
1 Professionalising Programme & Project Management Developing programme & project management capacities for UNDP and national counterparts External Briefing.
United Nations Statistics Division Revision policy and dissemination practices Training Workshop on the Compilation of Quarterly National Accounts for.
Project Proposal.
Current issues and trends in bibliographic control Overview of the Division’s interests and activities Bibliography Section Bohdana Stoklasova, Chair Talbott.
Graham Eele Development Data Group World Bank
1 Module PLANNING AND ORGANIZING EXTERNAL QUALITY ASSESSMENT.
Quality Assurance/Quality Control Policy
Generic Employability Skills Centre for Developing and Evaluating Lifelong Learning (CDELL)
Assessing and Improving Local Health Departments’ e- Health Capability and Capacity Bethany Bradshaw, MPH Applied Public Health Informatics Fellow, Wisconsin.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #22.
L&C Catalog Content on Certificates of Completion within Management.
2010 CEOS Field Reflectance Intercomparisons Lessons Learned K. Thome 1, N. Fox 2 1 NASA/GSFC, 2 National Physical Laboratory.
REGIONAL INSTRUMENT CENTRE: REVIEW AND STRENGTHENING Dr Jérôme DUVERNOY
KINGDOM OF MOROCCO National Meteorological Service of Morocco MOROCCAN WIGOS DEMONSTRATION PROJECT 1 STANDARDIZATION AND TRACEABILITY OF THE MOROCCAN METEOROLOGICAL.
AASHTO Subcommittee on Rail Transportation Sept. 18, 2012 Kevin Chesnik.
A FIRST REVIEW OF CALIBRATION DEVICES ACCEPTABLE FOR METROLOGY LABORATORY Mr Drago GROSELJ Dr Jérôme DUVERNOY Dr John GORMAN
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Survey on Institutional Arrangements for NMHSs.
Critical Role of ICT in Parliament Fulfill legislative, oversight, and representative responsibilities Achieve the goals of transparency, openness, accessibility,
Improving Test Ratios Using Reference Multimeters.
Monitoring and Evaluation of RA II Strategic Operating Plan (SOP) L.S. Lee, Hong Kong, China Chairman of the Task Team on RA II Strategic Planning.
WMO CIMO in 2014: Continuing to show joint leadership on WIGOS Bertrand Calpini ICG WIGOS co-chair ICG-WIGOS-4, Feb 2015.
INTERNATIONAL LABOUR ORGANIZATION Conditions of Work and Employment Programme (TRAVAIL) 2012 Module 15: Capacity development and training on Maternity.
STRUCTURAL FUNDS MANAGEMENT IN GREECE: The experience of the Management Organisation Unit of the CSF Presented by: Dex. Agourides Director General M.O.U.
Implementation Overview SHRP 2 Oversight Committee June 18, 2012.
Interstate Statistical Committee of the Commonwealth of Independent States (CIS-Stat) Implementing the Global Strategy to Improve Agricultural and Rural.
1 Operations Academy Senior Management Program Next Offering September 16-26, 2008.
1 Saxony-Anhalt EU Twinning RO 04/IB/EN/09 State Environmental Protection Agency Wolfgang GarcheBukarest National Reference Laboratory for Air.
Workshop on the Strategy and Action Plan of the WMO Flood Forecasting Initiative WMO Headquarters Geneva, 08 – 10 December 2009 INTRODUCTION TO THE WORKSHOP.
Bridging the Gap: The Role of the Private Sector in Climate Change Adaptation Richard Welford Chairman, CSR Asia Adaptation Knowledge Platform Learning.
Katherine Wilson EMRP Project Officer The European Metrology Research Programme (EMRP) E2C Conference_EMRP_Budapest 13.
ICT in primary education. Introduction The evolution towards an information society marks a new step in the history of civilization and it always brings.
1 The GCC Metrology Group GULFMET Mohammad Al Mulla GSO - Building for Integration
Quality management, calibration, testing and comparison of instruments and observing systems M. Leroy, CIMO ET on SBII&CM.
INTERCOMPARISON BETWEEN RA VI ( France, ) AND RA II (Australia) REGIONAL INSTRUMENT CENTRES ENVIRONMENTAL AGENGY OF THE REPUBLIC OF SLOVENIA Slovakia,
New Building of University Central Library. New Building Old Building.
Metrology for Chemical Analysis
Hessian Ministry of Economics, Transport, Urban and Regional Development Different approaches of the State of Hessen to adapt labour and qualification.
Andre Joyeux, Meteorologist I, Saint Lucia Meteorological Services RA-IV WIGOS Implementation Workshop (English), December,
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Metrology within Meteorology. METROLOGY PYRAMID METROLOGY LABORATORIES MANUFACTURERS / PUBLIC NATIONAL LABORATORY BIPM.
Redefining the Role of the Overall Responsible Operator May 18, rd Annual Northeastern Ontario Water Works Conference Alex Salewski Ministry of.
European Agency for Development in Special Needs Education Project updates Marcella Turner-Cmuchal.
Review of Social Marketing South East Region Presentation to Department of Health South East 5 August 2009 Hannah Corbett (South East.
Traceability in Chemical Measurement Comparable results are needed in order to avoid duplicating measurements which cost time and money. Comparable results.
METROLOGY LABORATORIES NETWORK UNDER MIRA-EMIS MIRA-WBC Joint Workshop on Innovation Sarajevo Ayşe SAYIN ÜKE Scientific Programs Expert International.
Stage 3. Consultation and Review Standard Setting Training Course 2016.
Senior Advisor, Environment and Development Foundation
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
Agenda – Morning Session
Management and Career Development
MIM Group 2013: Assignment – Knowledge Management
APEC 21st Century Renewable Energy Development Initiative
Training requirements of developing Countries
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
GIRO usage and GSICS Lunar Observation Dataset Policy S. Wagner
Some work experiences and needs in order to provide better services by Mr. Somxay KHAMPAHAVONG Deputy-Director of UCL.
Senior Management Leadership Programme Review and next steps
Overview of the RHIS Rapid Assessment Tool
Experiences with On-Board Mass Monitoring in Australia Gavin Hill General Manager, Strategic Development Transport Certification Australia.
Introduction to the PRISM Framework
State of World’s Cash Report:
Building Organizational Capacity: An evaluation of
Nuclear Cooperation in Asia and the role of RCARO
AWS Network Requirements Analysis and Network Planning
The status and Plan in 2019 for the WIGOS centers in RA II
Commission on Instruments and Methods of Observation
Presentation transcript:

TECHNOLOGY TRANSFER, CAPACITY BUILDING, TRAINING AND DEVELOPMENT OF RICs. Dr. John Gorman Australian Bureau of Meteorology

Contents Current State of Traceability Current State of the RICs Capacity building Technology transfer Training and development Suggestions by Workshop and Survey Respondents Discussions and Suggestions by Workshop Staff One approach - ARIC Interaction with RA-V

Current State of Traceability There was a significant issue with respect to the calibration of reference instruments within most of the NMHS surveyed. Several of the RA-I members reported that their reference instrumentation had not been calibrated since the 1960s. Many of the NMHS linked their traceability to the manufacturers of instruments rather than an RIC. Few inter-comparisons are being performed between the RICs. Many NMHs do not have a metrology laboratory.

Why? The majority NMHS have mercury based reference instruments that can not be shipped to an RIC. Inter-comparison using transfer standards is the only viable strategy for verifying the NHMS instruments. Inter-comparisons are time consuming. Typically, an inter-comparison for pressure will take approximately 6 to 8 weeks. An RIC would be able to complete a cycle of inter-comparisons with the whole region once every 5 years. There is a need to identify suitable transfer standard instruments for inter change within the region – especially in humidity.

Current State of the RICs There is a significant gap between what the participants believed the role of the RIC was, and what CIMO/WMO intended their role should be. Participants believe that the WMO should fund RICs to provide traceable calibrations for the regional associations free of charge. The WMO view that laboratories should volunteer to be RICs and provide staff and infrastructure for regional support was not widely understood. Few of the RICs are capable of carrying out calibrations to the level of uncertainty recommended by the CIMO Guide.

Capacity building Most of the NMHS surveyed claimed that instrumentation and traceability were given a low priority by their organizations. This has led to a lack of staff and resources for instrument calibrations and their traceability. There was a clear divide between the less developed laboratories which have people and time, and the more developed laboratories which have state-of-the-art instruments, but few staff. Developed RICs have expended considerable resources on automating calibration processes using electronic instruments and standards. Lower staffing levels imply that the manual calibration of instruments is avoided in developed RICs.

Solutions? One, the donation of obsolete or retired instruments from developed RICs to less developed RICs. However, the devices are by definition old and may require continuing maintenance; and parts or consumables may no longer be available. Model two, that RICs would become the source of excellence for one measured parameter – share the load model. However, this is not workable, in order to produce a calibration in one parameter to a low level of uncertainty the others must be measured to high accuracy which was what the strategy sought to avoid. Secondly, the system proposed would require a high level of co- operation between disparate RICs and involve significant delays and freight costs.

Technology transfer The developed laboratories of RA V and VI have largely replaced manual and mechanical instruments with electronic devices. This severely limits the amount and type of support they can offer less developed services. Developed laboratories have difficulty calibrating manual instruments. This is exacerbated by the procurement of ad hoc instrumentation by NMHS through foreign aid programs. These two processes above have led to a situation where developed laboratories can only provide limited training, maintenance or advice to the less developed laboratories.

Training and development Several metrology workshops have been held by CIMO. The disparity in capabilities between the developed laboratories and most of the NMHS limits the types and levels of training available. The Australian Bureau of Meteorology often takes RA-V members for training on radar maintenance – however most RA-V members do not have radars. The Bureau does not offer training in maintaining barographs and precision aneroid barometers – however most of the RA-V members use these devices. Metrology training offered by the developed labs is not well aligned with the needs of the developing labs.

Contd. The training in future may need to be more prescriptive – rather than descriptive. The training of the CIMO metrology workshops have provided a method for rapidly disseminating metrology knowledge to the members of the regional associations. The preparation of course materials has led to the creation of a set of unique resources that can be used in the future. Future courses will further refine this material.

Suggestions by Workshop and Survey Respondents WMO should scrutinize workshop applications with more rigor as some workshop attendees were not involved in the calibration or maintenance of instruments. The workshop training should be more practical in nature with more demonstrations and ‘hands-on’ experience. The WMO should support a central calibration laboratory within each Regional Association which would calibrate working standards for the regional members at no charge. More training in calibration techniques should be given to member countries.

Discussions and Suggestions by Workshop Staff There was a wide range of capabilities within the RA-I, V and VI with little co-operation between laboratories. Most reference instruments in less developed NMHs are mercury based and transportation for Inter-comparisons is not possible. There is a critical need to estimate the uncertainties of measured parameters in the NMHS to enable rational decision making and planning by the WMO in the future. Many NMHS are not capable of calibrating or maintaining modern meteorological measurement systems and therefore thought should be given to second tier systems. Travelling standards should be developed for circulation between the less developed NMHS. Calibration of the standards must be routinely performed by one of the more advanced RICs.

Models for Knowledge and Capacity Transfer Rising Tide model – put effort into all RICs and NMHS. Trickle Down model - put effort into the RICs and allow them to raise the level in the Region. Direct Intervention – identify the most critical or vulnerable RICs and NMHS and put effort in there.

Barriers Language – Metrology is a difficult and complex field and the type and depth of knowledge implies that high level language skills are needed. Backgrounds – the laboratory staff come from a variety of backgrounds, meteorologists, engineers, physicists, technicians. These groups do not share a common view

One approach - ARIC Interaction with RA-V The ARIC has adopted Direct Intervention within RA-V. For the more developed laboratories inter-comparisons are made using transfer standard instruments. This is a time consuming process taking approximately 8 weeks per inter-comparison, but it maintains a low overall uncertainty. For less developed laboratories, or NMHS that do not have an instrument laboratory the ARIC has developed a calibration kit. The kit is comprised of stable and transportable instruments that are 'stand alone'.

ARIC Traveling Standards Kit Kit allows inter- comparisons to be made for a basic set of surface parameters. Inter-comparison can be either automated via PC or manual. Inter-comparison does not require mains power.

Uncertainties Associated with the RA-V Calibration Kit

Acknowledgements Miroslav Ondras – CIMO Secretary Jerome Duvernoy – METEO FRANCE Drago Groselj – ENVIRONMENTAL AGENCY OF THE REPUBLIC OF SLOVENIA

Fin Questions? Contacts in ARIC Dr John Gorman Ph: Fax: Ian Dollery Ph: Fax: