__________________________ SITES 2005.1.4 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.

Slides:



Advertisements
Similar presentations
Hydrology Rainfall - Runoff Modeling (I)
Advertisements

Flood Profile Modeling with Split Flows and Weirs
WinTR-20 Course February Muskingum-Cunge Flood Routing Procedure in NRCS Hydrologic Models Prepared by William Merkel USDA-NRCS National Water Quality.
Hydrologic Analysis Dr. Bedient CEVE 101 Fall 2013.
WinTR-20 Calibration ProceduresFebruary WinTR-20 Calibration Procedures.
Streamflow and Runoff The character, amount, and timing of discharge from a basin tells a lot about flow paths within the basin Therefore, important to.
Detention / Infiltration Structure. Figure 21–1 Point Discharge and Downstream Stability Analysis Procedure.
CHARACTERISTICS OF RUNOFF
CE 515 Railroad Engineering
Runoff Processes Reading: Applied Hydrology Sections 5.6 to 5.8 and Chapter 6 for Tuesday of next week.
Kinematic Routing Model and its Parameters Definition.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
Design of Open Channels and Culverts
Ch  Know how to determine peak flow using the rational method 2.
Lecture ERS 482/682 (Fall 2002) Rainfall-runoff modeling ERS 482/682 Small Watershed Hydrology.
By Jennifer VerWest. Differences between Flat and Average/Steep Terrain Flat Terrain Steep/Average Terrain.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
HEC-RAS.
1 River Processes and Morphology A Case Study of the Souteyran valley.
WinTR-20 Project Formulation Hydrology Computer Program
CE 3372 – Lecture 10. Outline  Hydrology Review  Rational Method  Regression Equations  Hydrographs.
Hydrologic Routing Reading: Applied Hydrology Sections 8.1, 8.2, 8.4.
Reading: Applied Hydrology Sections 8.1, 8.2, 8.4
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
WinTR-20 Advanced Features June WinTR-20 Project Formulation Hydrology Computer Program Advanced Features Presented by: WinTR-20 Development Team.
TR-55 Urban Hydrology for Small Watersheds
Watershed Management Water Budget, Hydrograph Analysis
WinTR-20 SensitivityMarch WinTR-20 Sensitivity to Input Parameters.
Feb 2003HEC-RAS Version 3.11 Slides adapted from HEC Unsteady Flow Course Unsteady Flow Course.
DES 606 : Watershed Modeling with HEC-HMS Module 5 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Module 6: Routing Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI October 2013 Module 6 1.
HEC-HMS Runoff Computation.
WinTR-20 Advanced Features March WinTR-20 Project Formulation Hydrology Computer Program Advanced Features Presented by: WinTR-20 Development Team.
WinTR-20 Project Formulation Hydrology Computer Program Overview Presented by: WinTR-20 Development Team.
March 2009WinTR-20 Course1 Muskingum-Cunge Flood Routing Procedure in NRCS Hydrologic Models Prepared by William Merkel USDA-NRCS National Water Quality.
What is a Drainage Basin? Drainage basin Drainage basin  A drainage system which consists of a surface stream or a body of surface water together with.
WinTR-20 Project Formulation Hydrology Computer Program Overview Presented by: WinTR-20 Development Team.
PART 1 - INTRODUCTION TO SITES B. History and Focus of the SITES Software and its Application SPECIALTY WORKSHOP: SITES TRAINING AND INTRODUCTION TO WINDAM.
Channel Flow Routing Reading: Applied Hydrology Sections 8.4, , 9.7.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
Stream flow estimation. Why try to estimate it? Gauges don’t exist on every stream Important for water quality modeling Permitting discharge sites Biological.
Finding the S vs. Q relationship By: Cody Hudson.
1 VIRGINIAWORKSHOP Feb. 28 – Mar. 3, 2006 INTRODUCTION to SITES for WATER RESOURCE SITE ANALYSIS.
WinTR-20 SensitivityFebruary WinTR-20 Sensitivity to Input Parameters.
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
Basic Hydraulics: Channels Analysis and design – I
CE 3354 Engineering Hydrology
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Hydrologic Objects for Modeling: One Viewpoint Thomas A. Evans US Army Corps of Engineers Hydrologic Engineering Center.
1 TR-55 Urban Hydrology for Small Watersheds. 2 Simplified methods for estimating runoff and peak discharge for small urban/urbanizing watersheds Ch 1.
DIRECT RUNOFF HYDROGRAPH FOR UNGAUGED BASINS USING A CELL BASED MODEL P. B. Hunukumbura & S. B. Weerakoon Department of Civil Engineering, University of.
Rainfall and Runoff Reading: Haested Section 2.4 Computing Hydrographs.
Sanitary Engineering Lecture 4
UNIT – III FLOODS Types of floods Following are the various types of floods: 1.Probable Maximum Flood (PMF):This is the flood resulting from the most sever.
Basic Hydrology: Rainfall-runoff based methods – III
Basic Hydrology & Hydraulics: DES 601
Detention Basics
Routing-Hydrologic and Hydraulic
WinTR-55 Small Watershed Hydrology
Kristina Schneider February 27, 2001
Routing surface runoff to a basin outlet
Water supply Flood prediction and forecasting. Water quality
TR-55 Urban Hydrology for Small Watersheds
03/02/2006 Flow Routing Reading: 8.1, 8.4, 9.1, 9.2.
CEVE 412/512 Dr. Phil Bedient Jan 2016
Floods and Flood Routing
Preciptation.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
Presentation transcript:

__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES

OBJECTIVES Understand concepts related to dam design with complex watersheds Discuss stream reach routing options

UPPER LOWER

UPPER LOWER

Dams in Series Policy - Dams in series are to be given special consideration (NEM ) NEM (b)(2)(i) breach considerations.

Upper Dam Hydrologic criteria and procedures (TR-60) – same as or more conservative than those for downstream dams - if failure of the upper dam could contribute to the failure of the lower dam –If routing through an upper dam and it is overtopped it is to be considered breached. –Dam breach criteria TR -60 p 1-1

Complex Watersheds Hydrologically homogeneous W/S Soil and Cover Size

Complex Watersheds Drainage areas above 25 square miles should be subdivided. Goal - Hydrologically Homogeneous Areas Drainage areas more than 10 square miles should be considered for subdivision.

Upstream Site Homogeneous or Subdivided -- assumed to be in place for the design of the lower site. Site is routed only Spillway materials data not required. Minimum data can be included in structure table.

Downstream Site Site to be designed. If Integrity analysis is required - then all data is required.

Sites in Series Upper Dam Reach Lower Dam The upper dam is considered a feature of the watershed for the design of the lower dam.

Lower Dam Hydrographs from upper controlled areas are based on same criteria as for lower dam. Flows are routed through spillways of all upper dams and channel reaches to the lower dam where they are combined with the hydrographs from any uncontrolled drainage area. The combined hydrographs are used to flood route the lower dam.

W/S DATA The hydrologic characteristics of the uncontrolled area or subarea are to be used to develop all of the required input data for the area or subarea. This data includes - DA, Tc, CN, stage- storage, sediment, hazard class, rainfall, Ci, Baseflow, etc.

Stream Reach Routing Options

Reach Length The length of channel through which a hydrograph will be routed. In most cases the distance downstream from the outlet of the upstream site to the most upstream normal pool elevation of the dam downstream.

Reach 1 Reach 2 Upper Dam Lower Dam This is an example of a reach routing where the characteristics of the channel were not the same for the whole reach. So two reaches have been used to represent the channel.

Cross Section Rating Curve The shape of the cross section with possible multiple roughness values gives stage, area, and discharge that is used to define how the hydrograph will be routed downstream.

Example of a subdivided cross section - note areas of multiple roughness shown in the sections. 7 8

Muskingum-Cunge Reach Routing In SITES

Reach Cross Section Rating Table Data derived from HECRAS, Manning’s, etc. Reach Length = 5400 feet, Bankfull Elevation =

Rating Table

Fig Convex routing coefficient versus velocity

Taken from App. H in TR-20