MyFloridaMarketPlace CRB Meeting November 28, 2006
Page 2 Agenda Review CR 27 - Negative receiving (editing receipts > 24 hrs) Negative receiving has been voted into the upgrade CR 28 - Regeneration of Workflow Clarify the intent and design Review of CR Design Team Roles/responsibilities Review of Groups/Roles & discussion General upgrade status System Test Pass (STP) 1 results to-date Upcoming significant events (STP 2, UAT prep, Training prep) Closing comments & What’s next
Page 3 CR 27 – Negative Receiving in the Upgrade! Subsequent to discussions with MFMP and DMS Management, opportunity identified to postpone data scoping in exchange for including Negative receiving as presented 11/9/06 to CRB to CRB Distributed 11/17/2006 to vote 6 agencies responded in favor of negative receiving 2 agencies responded in favor of data scoping 4 agencies did not respond Design review summary Assignment of Design Approval Team Data Scoping will be re-addressed with full CRB involvement 1 st quarter of next FY
Page 4 Regeneration of Workflow during Approvals CR 28 - Regeneration of Workflow Subsequent to 11/9 CRB, some discussion or confusion on the intent of the CR What is the intent? The intent is to minimize the number of times an approver sees a requisition During the approval process (either initial or change order), if a requisition is edited and a change is made to the PR meeting any of the 4 conditions (business rules below), the PR will not be sent back through the approval flow 4 business rules to bypass regeneration Adding a line item not requiring specific approver or less than 10% total PR dollar value Deleting a line item Changing the total dollar value by less than 10% Changing commodity code not requiring special approver This design does not remove the approval flow for a Change Order on a Purchase Order unless: Person making the change has the role of “CO No Workflow” Changes to the PO are limited to the 53 prescribed changes
Page 5 CR Design Approval Team Roles/Responsibilities For each CR, Design Approval Team selected Generally, Design Approval Team selected from CRB members Design Approval Team involved in design review, testing and post implementation survey. Specifically, the team will: Review, provide input to, and approve designs Conduct user acceptance testing after development is complete Complete a system enhancement survey after the acceptance of the CR
Page Group and Role Structure Groups Group is a collection of permissions Assign one group v. many roles Designed groups: Analysis, Contract Manager, Purchasing, Requester, Approver, Reporting, Receiving and Invoicing Roles Roles allow additional functionality Reduce the number of roles For example: Requester-No eQuote, Requester eQuote, Requester-No eQuote-No Accounting Edit and Requester-eQuote-No Accounting Edit
Page Group and Role Structure Requester Group Change Create eQuote Role Edit Search Accounting Edit Role Central Receiver Role
Page 8 Ariba Buyer Upgrade – Plan Stage Status Plan Train Deploy Design AccomplishmentsIn progressUpcoming Development of 7.1 customized components Review of 8.2 test conditions System Test Pass 1 Finalization of workflow analysis Change Request evaluation Review final upgrade scope System Testing – 3 passes beginning (11/3 – 2/9/07) Design of new key groups/roles/permissions Data center relocation negotiations Enterprise reporting assessment CR Designs Go/No go decision for April 07 (1/19) Implementation planning Ariba Sourcing upgrade planning UAT Script preparation Training preparation * Bold indicates CRB participation may be requested Test Build Technical Infrastructure
Page 9 What’s Next? December 19, 2006, Kirkman Building (HSMV); 2900 Apalachee Parkway, Room A427 Any closing discussion Thank you!