TS, Length of YETS EYETS LIU & CONS Project

Slides:



Advertisements
Similar presentations
Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
Advertisements

Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
STTC 20/08/2002 Eva Sánchez-Corral 1 ST Division W2000 Migration status report Organisation and Management Strategy and Planning Review of experience Status.
Chapter 5 Initiating and Planning Systems Development Projects
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Chapter 5 : Initiating and Planning Systems Development Projects.
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
© 2005 by Prentice Hall Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
Linac2 Review  L2 operated with 99 % uptime in 2010 and 98% in the last 10 years  Systems review: all under control even for L2 till LS2 if ‘nightmare’
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
Accelerator and Technology sector organization from January, 1st, 2014 Frédérick Bordry 18 th November 2013.
Resources, Schedule and Risk Management Pierre Bonnal CERN DG-DI Projects Support Office 1 st HiLumi LHC Collaboration Meeting 16 th to 18 th November.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
Dr. José Miguel JIMENEZ LS2 Coordinator, CERN 1 LS1 Debriefing day 31 st March, CERN.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
TE-CRG Activities D. Delikaris, TE-CRG.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Linac4 Project Meeting 1/ /01/ st priority 2  First priority: from the Linac4 project, the best wishes to you and your families for a 2010.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
Orsay, 03/Feb/05EURISOL - Beta Beam TaskM. Benedikt 1 The Beta-Beam Task Status and Planning 02/2005 to 01/2006 Michael Benedikt AB-Department, CERN.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
LHC intervention scheduling with the Work Acceptance Tool
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Chapter 5 Initiating and Planning Systems Development Projects
Framework Schedule from EYETS 2016 to LS2
CONS and HL-LHC day Analysis of needs from BE-CO
Update on the Critical Path of the PS Booster Schedule for the EYETS
YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse
LIU Wire Scanner Milestones June 2017
Injector De-cabling Project
Safety in Construction and Upgrade Phases
Document Plan & Milestones WP7
YETS & LS2 Reminder G. Girardot 20 juin 2017.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
CRG activities for EYETS 2016
Business System Development
Overview & baseline of LS2 and roadmap for CRG
LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017
Chapter 5 Initiating and Planning Systems Development Projects
Chapter 5 Initiating and Planning Systems Development Projects
Access Control for CERN Experimental Areas
Presentation transcript:

TS, Length of YETS 2015-2016 EYETS 2016-2017 + LIU & CONS Project

David Hay & Simon Mataguez EDMS1509577 Outline TS 2015 www.cern.ch/LS1toLS2 Length of YETS 2015-2016 / EYETS 2016-2017 YETS 2015-2016 EYETS 2016-2017 LIU project - Malika Meddahi ACC-CONS project - Michael Benedikt Long Shutdown 2 (LS2) Project EN/MEF-OSS section Training David Hay & Simon Mataguez EDMS1509577

David Hay & Simon Mataguez EDMS1509577 TS 2015 David Hay & Simon Mataguez EDMS1509577 https://espace.cern.ch/be-dep/BEDepartmentalDocuments/BE/Injector_Schedule_2015.pdf

David Hay & Simon Mataguez EDMS1509577 www.cern.ch/LS1toLS2 David Hay & Simon Mataguez EDMS1509577

David Hay & Simon Mataguez EDMS1509577 Length of YETS 2015-2016 Status UNDER APPROVAL ATS-PM-MS-0001 EDMS 1470895 David Hay & Simon Mataguez EDMS1509577

David Hay & Simon Mataguez EDMS1509577 Length of EYETS 2016-2017 David Hay & Simon Mataguez EDMS1509577

LIU project - Malika Meddahi https://indico.cern.ch/event/344461 David Hay & Simon Mataguez EDMS1509577

David Hay & Simon Mataguez EDMS1509577 The goal of this year, if the ECR of a certain activity cannot be prepared in 2015, then the relative SRR should be submitted before the end of 2015. David Hay & Simon Mataguez EDMS1509577

ACC-CONS project - Michael Benedikt STATUS Project was launched in 2003/2004 (AB consolidation) to guarantee long-term accelerator complex operation in view of the LHC program. CERN’s Activity Planning Tool ((APT) application https://apt.cern.ch/apt/gui/) used as central tool for handling and tracking all accelerator consolidation requests Two consolidation “reviews” each year, April (to update MTP) and October (carry-over & last minute actions) First review was completed end 2014: No changes to already approved and ongoing WUs Considered only requests STARTING in year 2015 David Hay & Simon Mataguez EDMS1509577

ACC-CONS project - Michael Benedikt PROCEDURE All consolidation centralized in APT Soon Standardized EDMS (Consolidation Program WU Description) documentation accompanying each consolidation request: Context and scope of the consolidation activity Risk analysis description Proposed technical solution Description, alternatives, replacement vs. renewal, etc. Impact of consolidation Effect on future operation, maintenance needs & cost, lifetime, homogenization of equipment, safety … Impact of implementation on other technical systems, projects and technical groups Resource estimate Budget estimate, personnel estimate, Timeline with project planning and milestones David Hay & Simon Mataguez EDMS1509577

Long Shutdown 2 (LS2) Project LS2 coordinator Jose Miguel Jimenez The preparation, coordination and follow-up till completion of all LS2 activities in the frame of the LIU, HL-LHC Projects and other CERN approved projects. LS2 activities: Tool Plan (https://plan.cern.ch/plan/) Main milestones: LS1 Post Mortem: 1st trimester’15 Start date: 1st July 2018; Duration: 18 months (end’19) Yearly “LS2 day” as of 2015 Activities declared in Plan by end’15 both for injectors and LHC; Mid’16, definition of activities for EYETS 2016 and for LS2; Preliminary “final” validation: mid 2017. LS1 Post Mortem PLAN is made available LS2 Day Consolidated List of tasks to Director A&T LS2 Day 1st step final validation LS2 Day Final validation LHC Performance Workshop (Chamonix 2014) https://indico.cern.ch/event/315665/ David Hay & Simon Mataguez EDMS1509577

LIU-PLI, LIU-Ions, LIU-Booster, LIU-PS, Linac4 coord. EN/MEF-OSS section Organization, Technical Coordination and Scheduling Organization, Technical Coordination and Scheduling LIU-PLI, LIU-Ions, LIU-Booster, LIU-PS, Linac4 coord. Consolidation Project Maintenance (Systems) David Hay & Simon Mataguez EDMS1509577

David Hay & Simon Mataguez EDMS1509577 Training The first IMPACT training is now available to all people with a CERN login on the SIR platform. “Intervention Management Planning and Coordination Tool (IMPACT) - Fundamentals” New safety courses and New conditions for access rights in Beam Facilities (Mostly to be enforced on May 11 !) (Please have a look on the presentation from Marc Tavlet, at the IEFC on 24th April, about the new courses for access conditions. https://indico.cern.ch/event/389721/contribution/12/1/material/slides/1.pdf ) CERN Beam Facilities Machine-specific courses Introduction of “ranks” in ADaMS David Hay & Simon Mataguez EDMS1509577