Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,

Slides:



Advertisements
Similar presentations
1 Solicitations/Advertisements Solicitations/Advertisements
Advertisements

Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Request for Proposal - Best Value Generally RFP’s are created for large dollar technical purchases, services and consultants.  Consideration in addition.
Writing Proposals for Oak Ridge National Laboratory Women-Owned Small Business Day Sonny Rogers Contract Services Group Manager Oak Ridge, TN August 24,
Selection Scoring Methodology Presented by August 23, 2007.
Welcome! Statement of Qualifications Webinar
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Department of Public Works Robinson Park Recreation Center Renovation – Revised Selection Process for Design Services November 4, 2013.
Provider Training Request for Proposal Spring 2000 Bureau of Contract Management Department of Human Services.
PRE-PROPOSAL CONFERENCE Bond Program Monitor Procurement (RFP 13-08) Moderator: Stephen J. Densmore, Special Counsel June 10,
CSN Project # RFQ 180 and RFQ 181 Fire Station/College Instructional Center Scope of Work 14,000 SF structure on West Charleston Campus to house.
Marcy Mealy Procurement Specialist CDBG Program
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
IDOA Office Supply and Toner Products Pre-Proposal Conference May 14, 2012 Adam Thiemann IDOA Strategic Sourcing Analyst.
Purchasing Overview. Fundamentals of Purchasing Procedures.
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
United Nations Procurement Division
State of Connecticut Consultant Selection Office 2015 Consultant Prequalification Process Presented by the Connecticut Department of Transportation (CT.
PRE-PROPOSAL CONFERENCE ARBITRAGE CALCULATION SERVICES FOR THE OFFICE OF THE CITY CONTROLLER July 7, :00 P.M.
Pre-Proposal Conference January 17 th, :00AM Jennifer Michael, IDOA Strategic Sourcing Analyst Assessment Classes Pertaining to Level III Assessor/Appraiser.
Consultant Selection Missouri Local Programs How to Evaluate Consultant Proposals, Complete the Rating Sheets & Make a Selection.
PRE-PROPOSAL CONFERENCE CUSTOMER SERVICE EDUCATION PROGRAM FOR DEPARTMENT OF PUBLIC WORKS AND ENGINEERING May 7, :00 AM.
Louisville District BUILDING STRONG Selection Success “How to Put Your Best Foot Forward” Chris Karem, P.E. January 2009.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Purchasing Overview Related to Request for Proposals (RFP’s) and Request for Qualification (RFQ’s)
Carrie Murphy, Contracts Specialist Advanced DTSD/Bureau of Project Development Consultant Services Section September 30, 2015.
Insert Project Title Presentation of SSEB Findings to the Source Selection Authority {Insert Date} Presented by: Insert Name & Title Insert Name, Contracting.
1 Evaluation of the quality By committee of 3 or more specialists  Specific experience of firms ( points) Relevant assignment, similar size, complexity,
Request for Proposals Notification When to use?. When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
Pre-Proposal Conference Welcome! New York State Department of Transportation Conference Room A/B 50 Wolf Road May 30, :00 PM to 3:30 PM JOB ORDER.
Understanding Caltrans Request For Qualifications Process 1.
PRE-PROPOSAL CONFERENCE Welcome! Conference Room A/B NYSDOT 50 Wolf Rd, Albany NY Monday July 15, :00 to 12:00 Noon NEW YORK STATE DEPARTMENT.
1 WELCOME This is for RFP 7227 ONLY Restrooms Cell Phones Turn on vibrate Take calls outside Sign in sheets – please sign in Conference will focus on.
PRE-PROPOSAL CONFERENCE Welcome! American Air Power Museum 1230 New Highway, East Farmingdale, New York November 14, 2012 Management, Business Development.
1 Office of Procurement Presents Request for Proposal (RFP) Process.
Disadvantaged Business Enterprise (DBE) Each Submitter’s Responsibility for Outreach Efforts.
Consultancy Services K.N. Venkata Raman Procurement Consultant, World Bank.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009
The Office of Procurement Personal Services Contracting
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
Light Rail Transit Project
State Lobbyist Services
Award Management Services
TRAVEL SERVICES Request for Proposal
PRE-PROPOSAL MEETING, September 19, 2017 Contract No.:
Management of Placement Area at Bayport Container Terminal (RFQ-147)
Request for Proposal - Best Value
Consultant Selection Training
Request for Proposal and Specifications for
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Moderator: Stephen J. Densmore, Special Counsel
PRE-PROPOSAL MEETING, January 25, 2018 Contract No.:
City of Phoenix Request for Qualifications and Scoring Process Update
Request for Proposal - Best Value
Architectural Services RFQ
Oral statements or discussion during the Pre-Bid Meeting will not be binding, nor will they change or affect the IFB or the terms or conditions within.
Supporting SEACs across the Province:
OCPS CCNA SELECTION COMMITTEE TRAINING
DOTD Form September 4, 2014.
Jaeliza Morales CUR/516 Dr. Mary Poe
Pre-Submittal Meeting As Needed Environmental Services RFQ
Oral Statements Oral statements or discussions during this Pre-Submittal Conference will not be binding, nor will they change or affect the RFQ or the.
Presentation transcript:

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director, Port Development Port of New Orleans The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services September 22, 2015

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Consultant Selection Process - Regulations

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Standard Form: DOTD as modified for the Port of New Orleans Form required for the RFQ process. Fill out all sections 1 - Make sure to check which projects submitting for 4 & 5 – Do not need names, but type and numbers 8 – Answer both parts 9 – Complete all parts – especially the percentage and certification 10 – An organizational chart will work 11 – Under “g” – list work RELEVANT to the proposed work 12 – Again - list work RELEVANT to the proposed work (Note – only 5 max) 14 – NEW - Value of Contracts with the Port of New Orleans within the past 24 months. This includes work as prime and as a sub (there is a box for each). 16 – FAILURE TO SIGN ITEM 16 WILL RENDER THE RFQ NON- RESPONSIVE

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans CRITERIA FOR RFQ EVALUATIONS (Note that criteria may change for specific RFQs and criteria to be used are identified in the RFQ) Each Evaluation Committee Member assigns a score of 1 to 5, which is multiplied by the weighted factor. Ranking is based on sum of scores. Example, highest total score is ranked #1 by that evaluator. Evaluation Committee Member rankings are combined. Example, lowest total of the rankings by each evaluator is ranked #1 by the Committee. For Statements of Qualifications: Experience in the type of work, weighted factor of 5 1.Staffing and support personnel, weighted factor of 5 2.Professional reputation and business stability, weighted factor of 5 3.Local representation, weighted factor of 2 4.DBE participation, weighted factor of 2 5.Prior contract history, weighted factor of 2 6.New Opportunities, weighted factor of 3 7.Knowledge of local conditions, weighted factor of 3

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Factors in Evaluating Qualifications Criteria Experience in Type of Work Staffing & Support Personnel Professional Reputation & Business Stability Local Representation MBE/DBE/WBE /SBE Participation Prior Contract History New Opportunity Knowledge of Local Conditions Ratings: 5Excellent >75%Excellent No work as prime or sub in last 2 years Excellent 4Very Good Between 51% and 75% Very Good Work as sub in last 2 years under $50k Very Good 3Good Between 31% and 50% Good Work as sub in last 2 years over $50k Good 2Fair Between11% and 30% Fair Work as Prime in last two years under $50K Fair 1Poor Between 1% and 10% Poor Work as Prime in last two years under $200K Poor 0None 0%None Work as prime in last two years over $200k None

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans BOARD OF COMMISSSIONERS PORT OF NEW ORLEANS REQUEST FOR QUALIFICATIONS SUMMARY FORM PRELIMINARY SCORING PROJECT:Port NOLA Projet Name of Firm Reviewer #1Reviewer #2Reviewer #3Reviewer #4Reviewer #5Total Score Final Ranking A B C D 0 E F G H I J K 0 L 0 Evaluation Committee Member rankings are combined. Example, lowest total of the rankings by each evaluator is ranked #1 by the Committee.

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Request for Proposals - RFP Request for Proposals sent to three – five of the highest ranking SOQs Only submit the SF for firms added to the team since submittal of the SOQ Employees must have or be able to obtain Transportation Identification Worker Credentials (TWIC) Written Proposal – One original bound proposal and five bound copies (and one flash drive with all documents) Fee Proposal – Opened after scoring is completed Presentation – if requested

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Written Proposal – One original bound proposal and five bound copies Forms: Commitment to Assign Identified Resources Form (Form CAIR) Key Personnel Information Form (Form KPI) Named Sub-consultants Form, if any will be used (Form NS) Letter of Sub-Consultants Intent Form, if any will be used (Form LSI) Following section consisting of brief written descriptions: Summary of directly related experience – both consultant and sub-consultants Any client reference letters – limit of three An indication of ability of PM and key personnel providing presence in the NO area during contract Conceptual plan of action Additional PONO SF forms if necessary Description of skills, knowledge and experience directly related to the Scope of Work that indicated knowledge of local conditions Summary description indicating understanding of the Scope of Work and ability to meet Board’s schedule

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Fee Proposal – One original due with the Written Proposal – no copies needed Completed Fee Rate Schedule Form Sealed Envelope marked “Fee Proposal” Name of Prime Consultant indicated on outside Separate from the Written Proposal

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Presentation and Interview with the Consultant Evaluation Committee Encouraged to use Powerpoint presentation. Projector, screen and laptop are available Interview intended to be an opportunity for the Consultant/Team to present how they best meet the criteria that is the basis for final evaluations. Maximum of 45 minutes with additional 15 minutes for questions 15 minute period prior to presentation for setup Six printed color copies of presentation submitted at time of presentation. Key individuals: Lead Project Manager Lead engineer or engineers Lead specialists

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans CRITERIA FOR RFP EVALUATIONS (Note that criteria may change for specific RFPs and criteria to be used are identified in the RFP) Each Evaluation Committee Member assigns a score of 1 to 5, which is multiplied by the weighted factor. Ranking is based on sum of scores. Example, highest total score is ranked #1 by that evaluator. Evaluation Committee Member rankings are combined. Example, lowest total of the rankings by each evaluator is ranked #1 by the Committee. For Written Proposals: 1.Experience, both of the Prime Consultant and key individuals, weighted factor of 5 2.Past performance of Prime Consultant and key individuals, weighted factor of 5 3.Local representation, weighted factor of 3 4.Conceptual plan of action, weighted factor of 3 5.Staffing and support personnel, weighted factor of 3 6.Knowledge of local conditions, weighted factor of 3 7.Ability to meet schedule, weighted factor of New Opportunities, weighted factor of 3 9.DBE participation, weighted factor of 2.5

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Experience in Type of Work Past Performance Local Representation Conceptual Plan of Action Staffing & Support Personnel Knowledge of Local Conditions Ability to Meet Schedule New Opportunity MBE/DBE/ WBE Participation Ratings: 5Excellent Key personnel within 60 miles Excellent No work as prime or sub in last 2 years >75% 4Very Good Key personnel within 120 miles Very Good Work as sub in last 2 years under $50k Between 51% and 75% 3Good Key personnel within 240 miles Good Work as sub in last 2 years over $50k Between 31% and 50% 2Fair Key personnel within 360 miles Fair Work as Prime in last two years under $50K Between11% and 30% 1Poor Key personnel within 500 miles Poor Work as Prime in last two years under $200K Between 1% and 10% 0None Key personnel beyond 500 miles None Work as prime in last two years over $200k 0% Factors in Evaluating Proposal Criteria

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans BOARD OF COMMISSSIONERS PORT OF NEW ORLEANS REQUEST FOR PROPOSALS SUMMARY FORM PROJECT:Port NOLA Project Name of Firm Reviwer #1 Reviwer #2 Reviwer #3 Reviwer #4 Reviwer #5 Total Score Final Ranking F I J Evaluation Committee Member rankings are combined. Example, lowest total of the rankings by each evaluator is ranked #1 by the Committee.

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans After the RFP The Board awards contracts at its monthly public meeting, generally at 11:00 a.m. in the auditorium of the Port Administration Building. Written notification of the award will be issued by Ms. Dunn after the Board meeting. No information regarding the award will be given prior to the Board’s action, however the Board’s agenda for the meeting at which an award will take place will be sent to the firms submitting proposals prior to the Board meeting. After award: Staff negotiates contract terms, conditions, rates, time schedule Legal and Risk Management departments review contract and approve for CEO to execute contract.

Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Don’t forget to: /NewOrleansPort Follow us on #PortNOLA Watch us on YouTube PortofNOLA Thank You Catherine C. Dunn, P.E., D.NE, D.PE Port of New Orleans