Ken Wyllie, CERN Upgrade infrastructure, 19-20 Feb 2015 1 LHCb Upgrade Electronics Infrastructure K. Wyllie & L. Roy.

Slides:



Advertisements
Similar presentations
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
Walls crates cables gas chambers electronics CERN adb.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
DSS Advisory Board Christoph Schäfer Rack Safety System.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
André Augustinus 16 September 2002 Safety issues.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Niko Neufeld PH/LBC. Detector front-end electronics Eventbuilder network Eventbuilder PCs (software LLT) Eventfilter Farm up to 4000 servers Eventfilter.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Control, monitoring and safety aspects of electrical distribution in the Atlas experiment W.Iwanski PH/ESE-BE.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
V. Bobillier1 Cable installation status.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Ken Wyllie, CERN LHCb power supplies, 19th May Does each sub-detector have enough power supplies for the upgrade???? If not, do they need: More.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
Interventions on electrical distribution and racks’ infrastructure still to be done during LS1 and their impact W.Iwanski.
CALO News Pascal Perret LPC Clermont 22 January 2012.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
YETS & LS2 Works EN-EL / Power distribution
Cabling for LHCb Upgrade
YETS & LS2 Works EN-El on LHC / Power distribution
General aspects: Optical links :
Electrical and electronic systems projects
LHCb & EYETS
YETS & LS2 Works EN-EL / Power distribution
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Business opportunities related to CERN electrical network
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

Ken Wyllie, CERN Upgrade infrastructure, Feb LHCb Upgrade Electronics Infrastructure K. Wyllie & L. Roy

General view FE PP MPO Local racks LVPS ELMB Turbine Low voltage < 8V ‘High’ voltage 50 – 1000V Sense Monitoring for DCS/DSS 230 VAC CANBus Control & Monitoring 380 VDC D2/D3/B1 PFCs RCMs Turbine Electrical network CAN controller Turbine HV power supply Turbine ECS DCS DSS Network ECS/TFC fibres Data fibres Surface container PP MPO Fibre trunks SOL40 PC SOL40 PC SOL40 PC Network & Farm TELL40 PC TELL40 PC TELL40 PC TELL40 PC TELL40 PC LHC interface? Sub-detector responsibility Infra-group responsibility Sub-detector responsibilityInfra-group responsibility Sub-detector responsibility ?

Ken Wyllie, CERN Upgrade infrastructure, Feb Copper cabling & connectors I Existing cable database: re-use very useful features: naming convention, barcodes Re-cycle existing cables Remove cables…..? eg Velo Cu signals All between detector & D2/D3/B1 (none to surface) Common cable types Maraton 380VDC + monitoring/control CANbus for ELMBs Sub-detector specific eg multiwire HV for silicon detector bias coax for PMT signals

Ken Wyllie, CERN Upgrade infrastructure, Feb Copper cabling & connectors II New cables: Choose cables/connectors available through CERN stores Easy purchasing & delivery (careful with delivery times) Unused length can be returned Most meet safety regulations (IS-23) Must be carefully specified & documented in EDMS Long-distance cables: purchasing & installation by infrastructure group (sub-detector budget codes!) Short-distance cables: sub-detector responsibility (help from infra-group)

Ken Wyllie, CERN Upgrade infrastructure, Feb Example of cable+connector specification

Ken Wyllie, CERN Upgrade infrastructure, Feb Power supplies Re-cycle existing units Assume maintenance contract extended after 2018 Buying new units: Stay with the usual suppliers easy to integrate, common software support, organized maintenance, shared experience, database Buy units that are commonly used (eg Wiener 0M ) Delivery times can be long my last order took 5 months

Ken Wyllie, CERN Upgrade infrastructure, Feb Power supply sharing - summary See summary slides for proposal for sharing power supplies IT + TT + OT + PS/SPD => TT + SciFi + Calo Optimum distribution of existing power supplies BUT most sub-detectors have to purchase more units Excellent database for orders, repairs, prices etc etc

Laurent Roy, CERN Upgrade infrastructure, Feb LHCb Upgrade Infrastructure - Electrical powering - Racks - Long distance optical fibres

Laurent Roy, CERN Upgrade infrastructure, Feb Electrical installations -main additional power need (UX or Surface)?  to be foreseen well in advance with EN/EL (previous slides from EL) -Experiment equipment powered by same network of LHC (EXD)  can your systems live with power cuts? - glitches (µs ; often) - micro cut (ms-s ; few/year) rk: with LHC stop - AUG tests (1day/year) - switchboards, transformers maintenance (2-5days/2 years) -Possibility to power systems with ‘secure’ powering (schema next slide)  quantity of power limited : must be justified -Possibility to install ‘repowering’ possibilities  ex: for failure in the distribution, during AUG, maintenance

18kV Diesel 66kV EXPERIMENT GENERAL SERVICES SAFETY UPS 100kVA 10min EXD 400V ESD D1 PC Farm D3 Front End UXA-B1 AC/DC for Maraton UXA-C Cooling UXA-A Gas SX Online Servers Control room EBD 400V UX 85 Lights Local power Cranes Ventilation … LHC Loop Machine network D2 ECS Network Online Servers UXA-SX8 Fire detection Permanent lights Water pumps LIFT VELO cooling DSS SX8 SNIFFER EDF 400kV EOS-SIG 120kV drawing for UX85: LHCEB___8026 EDF Gex 20kV 18kV 400V UPS 100kVA 10min UPS 200kVA 10min UPS 200kVA 10min UPS 10kVA 10min UXA Magnet control Magnet SS DSS UX85 UPS 10kVA 10min EOD SX Lights Local power Crane Workshop Lab Offices … EOD D2 PC Farm extension

11 Electrical installations Racks for electronics underground: in D3 barracks distribution designed for ~11 kW/rack max. distribution box: 7 single phase 16 A circuit breakers Doc. ‘Different electrical networks in LHCb’  Laurent Roy, CERN Electrical distribution + grounding documentation  doc to update (Velo, Rich, Muon, Calo, Herschel) or to produce (UT, Scifi) existing doc in edms/LHCb/Technical coordination/Safety/SMS Inspection Reportsedms/LHCb/Technical coordination/Safety/SMS Inspection Reports  Safety inspections will be re-done for each system

Laurent Roy, CERN Upgrade infrastructure, Feb Racks attribution in D3 MUON CALO No change RICH1 RICH2 No change SciFi VELO No change UT

13 Racks attribution in B1 + UX85B SciFi UT Racks naming will be updated  dBalconyB dBunker dB1 platform Shielding Wall

Laurent Roy, CERN 14 -Cooling: vertical air flow mixed water exchangers - Safety aspect (DSS): Thermo switch: 40 ˚C, Smoke detection, CO2 automatic triggering.  Mechanical adaptation to be done for new equipment (plates for air, rails…) Racks ‘standard’ for electronics

Laurent Roy, CERN Upgrade infrastructure, Feb Racks preparation Rack modification need for your equipment ?  Propose to use an Excel template to modify (not Rackwizard)  Manpower for mechanical work to defined

16 Optical fibres: Responsibilities Order + Installation by Sub detectors Order + Installation by Cern group Order + Installation by Sub detectors

Laurent Roy, CERN Upgrade infrastructure, Feb Optical fibres Long distance status: 3 x 144 fibers cables installed between UX-Bunker and SG8  Learn a lot with installation (blowing+splicing and pre-connectorized solution) document with all details in preparation (EN/EL)  Tests with AMC40 on going (Rainer)  Electronic setup in preparation for long duration tests in UX85 (Ken) Patch cord type, splitting cassette, PCIe40 quantities…  Sub-detectors should converge to final designs now Each group produce schemes for next ‘Electronic meeting’ in April ? Tender for new ‘optical Cern contract’ (EN/EL) on going  New companies (supplier and installation) ? new conditions ~ mid 2015

Calo Muon 18 Optical Patch panel location SciFi dBalconyB Shielding Wall dNew Plaform for optical Patch Panel VELO Rich1 UT optical Patch Panel in Bunker Racks Rich2 Scifi SciFi Laurent Roy, CERNUpgrade infrastructure, Feb 2015 PM85 side

Laurent Roy, CERN Upgrade infrastructure, Feb New platform for opt.PP VELO, RICH1, UT New cable trays between platform and existing cable trays (~ top of the magnet) to installed

Actual opt.Patch Panel A side Upgrade infrastructure, Feb opt.PP for CALO -> new Rack

Upgrade infrastructure, Feb opt.PP for CALO Laurent Roy, CERN -> new CALO PP Rack -> new cable trays to installed

Laurent Roy, CERN Upgrade infrastructure, Feb opt.PP for Muon -> use Muon PP racks A and C side for new Opt PP. A side C side

Laurent Roy, CERN Upgrade infrastructure, Feb Thanks -End-