INDIAN RAILWAYS INSTITUTE OF CIVIL ENGINEERING. COORDINATION WITH ENGG DEPT Engineering Department responsible for construction and maintenance of following.

Slides:



Advertisements
Similar presentations
Parts of a Steam Engine. Tender Container holding water for the boiler and coal for the fire box.
Advertisements

Unauthorized Commitments
CONTRACTORS’ ALL RISKS INSURANCE Rohana Alagiyage
St. Croix River Crossing Project Public Information Meeting
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
Make the most of your energy Head Office – Case Study.
737 PNEUMATICS MENU PRINCIPAL.
SERVICE TAX 1. As per Explanation to Section 65 (105) (zzzza) of the Finance Act, 1994, the term works contract” means a contract wherein,— (i) transfer.
Terminal Safety. Objectives Identify main causes Outline terminal safety organization State the safe working practices.
Transport Railways Incident Procedures. Aim To give students information about the emergency procedures to be adopted at incidents involving railways.
LADDER SAFETY.
1 THAI TOKO ENGINEERING CO.,LTD. Safety management procedure.
ELECTRIC TRACTION SYSTEM
University of Zilina Slovakia. Brief history The University of Zilina was established on October 1, 1953 as the University of Railway Transport in Prague.
Initiatives on Solar Energy on Northern Railway By A. K. Singhal CEGE/NR 10th January’2015.
Parts of a Steam Engine. Tender Container holding water for the boiler and coal for the fire box.
How to use the DEEP LeCCATo Life Cycle Costing Tool DEEP Life Cycle Cost Analysis Tool How to use the tool The DEEP Toolkit. TOOL 2.b.Life Cycle Cost Analysis.
MECHANICAL ASPECTS OF MICHIGAN UNIFORM ENERGY CODE MIAM DOHERTY INN CLAIRE, MICHIGAN MARK RILEY.
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Standard Organization and Regulations of the U. S. Navy SORN
Bridges Vocabulary. Bridge  A structure used to help people cross valleys, rivers and bodies of water.
Presentation on Financial and Procurement Procedure to be followed by the Institute Management Committees.
TSI-SRT Safety in Railway Tunnels LLOYD’S REGISTER RAIL EUROPE TSI-SRT Safety in Railway Tunnels Benefit or Burden?
Transportation & Traction Power Programs
The Birmingham Gateway Project: Feasibility and implementation of CHP Azhar Quaiyoom.
INDIAN RAILWAY VISION CAPACITY CREATION BY More than 30,000 kms of route would be double / multiple lines (compare to around 18,000 kms today).
CE Estimation & Quantity Surveying Prepared by Prof. S.L. DAVID ANANDARAJ.
Procedures for Dealing with Safety or Health Concerns.
Highway Operations Section Technical Standards Branch Section overview.
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
Ch 91 IT-390Cost Analysis. 2 Project Estimating (Design) l A Project Estimate is one of a kind n Custom design, only one will be manufactured n Capital.
Introduction to a pit-less lever scale “concrete deck” The scale to be shown is a B-Tek Side/rail Side/lever electromechanical Platform is 60’x11’ on.
ELECTRICAL SAFETY OUTLINE  The basic effect of electricity on human body  Ventricular Fibrillation  Electric shock  Electric Shock – Treatment  Important.
EFRTC General Meeting Welcome Jo Urlings, President EFRTC Zoetermeer, November 18 th, 2011.
The Federal Bureaucracy Mr. Stroman US Government.
Levy of Service Tax on Services Provided by Indian Railways Presentation by Sushil Solanki Principal Commissioner, Ahmedabad S.T. for Indian Railway.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
1. 1.History Of Indian Railway 2.Types of Traction System 3.Non Electric traction system coaches 4.System Of Track Electrification 5.Power Supply For.
Presentation for National Workshop/ Review Meeting of State Project Engineers/ Civil Works Coordinators Puri, Orissa Date : 16 & 17 November, 2011.
Road Information System / Road Data Bank 10 April 2013 Lars Bergman M. Sc. In Civil Engineering Long Term Planning Swedish Transport Administration.
Scientific Production Company Dneprspetsmash Ukraine, Dnipropetrovsk Heavy-duty multifunctional track motor vehicle AD-01.
CRS SANCTIONS Chetan Bakshi, CRS/Central. WHY CRS SANCTION IS REQUIRED ? Section 21 & 22 of Railway Act 1989 stipulates that “ No Railway should be opened.
CE2303 Railway Engineering
Track Drainage CE2303 Railway Engineering. Drainage-General Drainage is the natural or artificial removal of surface and sub-surface water from an area.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
ELECTRICAL INSTRUMENTS ( service and utilization )
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
MENU PRINCIPAL. THIS PRESENTATION INCLUDES THE SOURCES OF AIR, THE MAJOR SYSTEM COMPONENTS AND THE WAY THE CONTROLS AND INDICATORS ARE USED TO OPERATE.
SMART-Safety Management and Reporting Tool
Minimum Set of Requirements for Suppliers
Minimum Set of Requirements for Suppliers
GCC CODE “THE SAFETY REGULATIONS FOR SHIPS THAT ARE NOT COVERED BY THE INTERNATIONAL CONVENTIONS” THE CABINET RESOLUTION NO.(29) OF 2013.
Shop Orientation and Procedures
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
MISSOURI TRADE & TECHNICAL ASSOCIATION POLICIES AND PROCEDURES MANUAL
ELECTRIC TRACTION SYSTEM
Flammable and Combustible Liquids
Managing Property What Principal Investigators and Business Officers need to know Business Services - Rates and Review Team Established February 25, 2015.
RAILWAYS, BRIDGES & TUNNELS
Transmission Engineering
WELCOME TO HIRA TRAINING.
Safety Meeting Topics Standby Generator Safety
The Low-Down on Ladder Safety:
Managing Property What Principal Investigators and Business Officers need to know Business Services - Rates and Review Team Established February 25, 2015.
Information related to Chapter 7 in the textbook
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
Life Cycle Costing.
Presentation transcript:

INDIAN RAILWAYS INSTITUTE OF CIVIL ENGINEERING

COORDINATION WITH ENGG DEPT Engineering Department responsible for construction and maintenance of following assets - TRACK - BRIDGES - BUILDINGS & STRUCTURES Close coordination is required with the sister departments for construction & upkeep of assets Sonepur model for synergy between departments

TRACK - Cable laying & crossings below or overhead track - Working in electrified sections. Indian Railway Permanent Way Manual (IRPWM) Chapter II – The maintenance of Permanent Way Part J – Maintenance in Electrified Areas Para 282 : General Instructions to Staff Defects or breakdown in OHE noticed to be reported to TPC.

Para 283 : Special Instructions to Staff working in Traction Areas No work within 2 m. of live parts of OHE without PTW Para 284 : Maintaining continuity of track During maintenance or renewal of track, continuity of rails serving electrified tracts shall be maintained. Para 285 : Catch Sidings. Normally all catch sidings except those sanded shall be kept alive.

Para 286 : Additional Precautions in AC traction areas - Induction in metallic bodies situated close to OHE, unloading of rails Para 287 : Fire in Electrified Areas Para 288 : Permanent Way Tools – Insulated Para 289 : Treatment of persons suffering from Electrical Shocks Para 290 : Accident to Power Lines of outside bodies

BRIDGES Electrified Section Care has to be taken while doing maintenance activities especially in through spans where OHE is suspended from the top of girder.

BUILDINGS & STRUCTURES SERVICE BUILDINGS & STAFF QUARTERS - Lighting - Fan - Power Supply - Air conditioning, -Solar heating Proper planning and estimating for above items needs to be done whenever proposing,sanctioning and executing the main works.

WATER SUPPLY While planning and executing works for water supply,electrical/diesel pumps required to be provided should be catered for in the estimates Indian Railways Works Manual Ch. V - Pumps Para 524 – Type & selection of pumps Para 525 – Pump Installation Para 526 – Driving units Para 527 – Capacity of pumps Allahabad division case study

PASSENGER AMENITY WORKS - Platform Shelter - Foot over bridges - Booking/Reservation/enquiry office While planning passenger amenity works, electrical portion sub estimate should invariably be included in the main estimate. While executing these works, proper planning and coordination is required to be done by the engineering department with the electrical dept.

Tenders & contracts Inviting composite tenders for building works providing for items pertaining to electrical sub estimate Association in the Tender Committee as third member Dissemination of policy circulars in the area of tenders and contracts