US Army Corps of Engineers BUILDING STRONG ® PLANNING FUNDAMENTALS Planning Principles & Procedures – FY11.

Slides:



Advertisements
Similar presentations
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Advertisements

Chapter: 3 Agile Development
Integrated Coastal Zone Management Unit 7: Integrated coastal planning.
Chapter Eleven: Effective Communication in Task Groups and Teams.
Managing Projects. Contemplative Questions  What does project management entail?  Do I want to be a project manager? What is the nature of the work?
1 14. Project closure n An information system project must be administratively closed once its product is successfully delivered to the customer. n A failed.
Course Technology Chapter 3: Project Integration Management.
Organizational Influences and Life Cycle
Project Tracking and Scheduling Infsy 570 Dr. R. Ocker.
Introduction to Project Management. What is a Project? “A planned undertaking of related activities to reach an objective that has a beginning and an.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Project Planning with the U.S. Army Corps of Engineers (USACE) Presenter Name Presenter Title.
Sharif University of Technology Session # 4.  Contents  Systems Analysis and Design Sharif University of Technology MIS (Management Information System),
1 Building Strong! THE ECONOMIST’S ROLE Ken Claseman Senior Policy Advisor for Economics Office of Water Project Review HQUSACE
Project Management Fundamentals Project Organization and Integration
I n t e g r a t I n g C S S Practitioner Module 2 1 Module 2: Building the Case for Change.
What is Business Analysis Planning & Monitoring?
Module 12 STEPS 6 & 7 Negotiation of PMP/FCSA and Execution of Feasibility Cost Sharing Agreement Civil Works Orientation Course - FY 11.
Initiating and Planning Systems Development projects
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Unit 2: Engineering Design Process
Project Management Introduction to PM. Project Management A group of multiple interdependent activities that require people and resources Characteristics.
CIS 499 Senior Seminar IT project management. Exercise. Write a testable problem statement in subject verb format. Who? Are the people going to use this.
Best Practices By Gabriel Rodriguez
Systems Development Lifecycle Project Identification & Selection Project Initiation & Planning Analysis Logical Design Physical Design Implementation Maintenance.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
BUILDING STRONG SM Plan Formulation: General Module G-1: What is plan formulation?
BUSINESS PLUG-IN B15 Project Management.
INTRODUCTION TO PROJECT MANAGEMENT. WHAT IS A PROJECT? “A planned undertaking of related activities to reach an objective that has a beginning and an.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Chapter 8 Managing Project Risk Copyright 2012 John Wiley & Sons, Inc. 8-1.
Setting Your Fees Project Cost and Setting Your Fees.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Lecture 3 Managing the Development Project SFDV Principles of Information Systems.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project Life Cycle – Project Initiation © Ed Green Penn State University All Rights Reserved.
Project Charters Module 3
Chapter 14: Using the Scalable Decision Process on Large Projects The process outlined is meant to be scaleable. Individual steps can be removed, changed,
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 2 Project Management Cycle.
M4 - 1 BU ILDING STRONG SM Multi-Purpose Projects Module M4: Telling the Plan Formulation Story.
Develop Project Charter
The E ngineering Design Process Foundations of Technology The E ngineering Design Process © 2013 International Technology and Engineering Educators Association,
Software Architecture Evaluation Methodologies Presented By: Anthony Register.
DESIGNING A PUBLIC PARTICIPATION PROGRAM. By the time you select techniques you should know The target stakeholders What has to be accomplished with them.
Chapter Sixteen Managing Network Design and Implementation.
Project Risk Management Planning Stage
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® U.S. ARMY CORPS OF ENGINEERS CIVIL WORKS TRANSFORMATION: SMART PLANNING AND RESCOPING CHARETTES.
1 Project Management C53PM Session 3 Russell Taylor Staff Work-base – 1 st Floor
Project Management.
ENGINEERING DESIGN PROCESS. OBJECTIVES IDENTIFY THE STEPS OF THE ENGINEERING DESIGN PROCESS. DETERMINE CRITERIA FOR THE DEVELOPMENT OF A NEW TECHNOLOGY.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
1 1 CEQA Scoping Naomi Feger Planning TMDL Section Leader Region 2.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
US Army Corps of Engineers BUILDING STRONG ® STEP 3 - FORMULATION BRAINSTORMING MANAGEMENT MEASURES Planning Principles & Procedures – FY11.
US Army Corps of Engineers BUILDING STRONG ® Step 6: Selection Of The Recommended Plan Planning Principles & Procedures – FY11.
Class 6 Highlights Project Management: Control, Auditing & Closure, Ethics & Social Responsibility.
1 Design and evaluation methods: Objectives n Design life cycle: HF input and neglect n Levels of system design: Going beyond the interface n Sources of.
Project Management Finals Lesson 1 - Principles - Techniques - Tools.
Chapter 8 Managing Project Risk.
BUSINESS PLUG-IN B15 Project Management.
Project Management Processes
Who Wants to be a PMP? Pre-Course Game 3
Nick Bonvoisin Secretary to the Convention on the
Lecturette 2: Planning Change
Project Management and the Organization
Project Management II The Project Value Creation Process
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® PLANNING FUNDAMENTALS Planning Principles & Procedures – FY11

BUILDING STRONG ® PLANNING FUNDAMENTALS OUTLINE  Step-by-step process  Iteration  Criteria and other tools  Analyses  Public involvement and interdisciplinary team

BUILDING STRONG ® ITERATION  Repeat  What? Steps.  Why? Different emphasis to reflect stages of process.  How many times? Depends.  When do you stop? When there’s a recommendation.  What about Adaptive Management?

BUILDING STRONG ® ITERATION  It would be nice if the planning process were always sequential, but…  Start at any step.  Conduct and repeat steps, but not necessarily always in order -- don’t panic!   Conduct each step at least once.  Always end at the last step – a recommendation.

BUILDING STRONG ® PLANNERS’ TOOLBOX  Criteria  Planning area  Period of analysis  Problem  Opportunity  Goal  Objective  Constraint  “Without” condition  “With” conditions  Management measure  Alternative plan  Effect (impact)

BUILDING STRONG ®  Criterion… n. pl. -teria… A standard rule or test on which a judgment or decision can be based. [Greek kriterion, a means for judging, standard, from krites, a judge, umpire, from krinein, to separate, choose.]” CRITERIA

BUILDING STRONG ® CRITERIA  What Decisions? ► pass/fail, retain/delete, yes/no, go/no go ► priority, rank, order, more/less  When? ► early - “screening” decisions ► late - “selection” decision  Where do criteria come from? ► given - “four criteria”, “scoping” (i.e., significant issues related to proposed action) ► unique to each study  Identify criteria BEFORE you make a decision.

BUILDING STRONG ® WHAT DO WE “SCREEN” WITH CRITERIA?  Stakeholders to be involved  Problems and opportunities to be addressed  Information to be collected  Future without project assumptions to be used  Management measures to be evaluated  Effects to be considered  Plan to be recommended - SELECTION

BUILDING STRONG ® PLANNING AREA  Geographic space that includes: ► Study authority area ► Stakeholders’ jurisdictions ► Problem and opportunity areas ► Project areas (aka, project “footprint”) ► Affected areas (direct, indirect, cumulative)

BUILDING STRONG ® PERIOD OF ANALYSIS  Period of analysis ► Begins at the base year ► Principles and Guidelines = 100 years ► Corps’ Planning Guidance = 50 years ► Used for discounting $ value of benefits & costs over time  Not the same as: Design / Project life  In perpetuity ► e.g., authorization, budgeting, obligations & responsibilities

BUILDING STRONG ® ANALYSES  With and Without Analysis  Benefit-Cost Analysis  Cost Effectiveness Analysis  Incremental Cost Analysis  Optimization Analysis  Trade-Off Analysis  Sensitivity Analysis  Risk Analysis

BUILDING STRONG ® PUBLIC INVOLVEMENT: WHO’S THE PUBLIC?  Sponsor, partner, customer, client  Stakeholder ► Any party affecting failure or success of project  “The public”  Internal public  Elected official

BUILDING STRONG ® WHAT’S AN IDEAL TEAM?  Name the 5 most important people to have on the team.  How many hours per month should team members be together in one place as a team? (160 work hours per month)  What are the 3 most important characteristics for team success?

BUILDING STRONG ® NAME THE FIVE MOST IMPORTANT PEOPLE TO HAVE ON YOUR TEAM

BUILDING STRONG ® 5 MOST IMPORTANT PEOPLE TO HAVE ON YOUR TEAM:

BUILDING STRONG ® 5 MOST IMPORTANT PEOPLE TO HAVE ON YOUR TEAM:  Leader

BUILDING STRONG ® 5 MOST IMPORTANT PEOPLE TO HAVE ON YOUR TEAM:  Leader  Thinker

BUILDING STRONG ® 5 MOST IMPORTANT PEOPLE TO HAVE ON YOUR TEAM:  Leader  Thinker  Doer

BUILDING STRONG ® 5 MOST IMPORTANT PEOPLE TO HAVE ON YOUR TEAM:  Leader  Thinker  Doer  Writer

BUILDING STRONG ® 5 MOST IMPORTANT PEOPLE TO HAVE ON YOUR TEAM:  Leader  Thinker  Doer  Writer  Presenter

BUILDING STRONG ® TEAM MEMBERS BRING TO THE TABLE:  Expertise  Affiliation  Talent  Personality  Values

BUILDING STRONG ® NUMBER OF HOURS PER MONTH THAT TEAM MEMBERS SHOULD BE TOGETHER IN ONE PLACE AS A TEAM:

BUILDING STRONG ® NUMBER OF HOURS PER MONTH THAT TEAM MEMBERS SHOULD BE TOGETHER IN ONE PLACE AS A TEAM: 8-40

BUILDING STRONG ® 3 MOST IMPORTANT CHARACTERISTICS FOR TEAM SUCCESS:

BUILDING STRONG ® 3 MOST IMPORTANT CHARACTERISTICS FOR TEAM SUCCESS:  Communication

BUILDING STRONG ® 3 MOST IMPORTANT CHARACTERISTICS FOR TEAM SUCCESS:  Communication

BUILDING STRONG ® 3 MOST IMPORTANT CHARACTERISTICS FOR TEAM SUCCESS:  Communication

BUILDING STRONG ® Teams and the PMP  Recall, the PMP defines the scope, schedule, and cost of a Corps investigation.  Who develops the PMP? The team.  PMP development can be a team building/partnering exercise  No standard format/length – PMPs, much like teams, are all inherently different  Standard content of PMP: tasks, costs, schedules.  Standard content of a team: individuals.  Effective team communication is a prerequisite of a good PMP and team success.

BUILDING STRONG ® PUBLIC INVOLVEMENT AND INTERDISCIPLINARY TEAM SIMILARITIES  Why do them? ► Required! ► Talent Pool  “Facts” vs. Informed Judgments vs. Personal Values  Position vs. Interest  Techniques PEOPLE

BUILDING STRONG ® PUBLIC INVOLVEMENT AND INTERDISCIPLINARY TEAM SIMILARITIES  Why do them?  “Facts” vs. Informed Judgments vs. Personal Values  Position vs. Interest  Techniques PEOPLE

BUILDING STRONG ® TECHNIQUES  Flip chart technology  Individual assessment instruments  Public and team meetings  Brainstorming  Nominal group exercise  Large group response exercise  Questionnaires  Advisory committees  Partnering  Alternative dispute resolution  Samoan Circle

BUILDING STRONG ® PUBLIC INVOLVEMENT AND INTERDISCIPLINARY TEAM SIMILARITIES  Why do them?  “Facts” vs. Informed Judgments vs. Personal Values  Position vs. Interest  Techniques PEOPLE

BUILDING STRONG ® PUBLIC INVOLVEMENT AND INTERDISCIPLINARY TEAM THREE GOOD QUESTIONS:  What are the problems and opportunities?  What are the solutions?  What are the solutions’ pros and cons?

BUILDING STRONG ® PLANNING FUNDAMENTALS LESSON REVIEW  Step-by-step process  Iteration  Criteria and other tools  Analyses  Public involvement and interdisciplinary team

BUILDING STRONG ® PLANNING FUNDAMENTALS LEARNING OBJECTIVES  Q- What do mean mean by “iteration”?  A – Repeat the planning steps.  Q – What do we do with criteria?  A – Use them as a standard rule or test on which a judgment or decision can be based.

BUILDING STRONG ® PLANNING FUNDAMENTALS LEARNING OBJECTIVES  Q – What are the similarities between public involvement and the interdisciplinary team?  A – Both involve people, and ► Have similar reasons for doing them ► Involve facts, judgments and values ► Involve positions and interests ► May use the same techniques

BUILDING STRONG ®