14-Feb-08 HEPAP Global Design Effort 1 Navigating the Bumpy Road to the ILC Barry Barish GDE Workshop - Sendai 3-March-08.

Slides:



Advertisements
Similar presentations
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Advertisements

Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 1 Barry Barish 2 nd Asian ILC R&D Seminar 29-September-08 Progress toward the ILC ATF-2.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
17-April-09 TILC09 Global Design Effort 1 Barry Barish TILC09 – Tsukuba, Japan 17-April-09 ILC / GDE Report Electron Cloud at CesrTA.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
4-June-08 GDE Meeting - Dubna Global Design Effort 1 GDE Status/Update Barry Barish GDE Meeting at Dubna 4-June-08.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1-Feb-08 P5 Global Design Effort 1 GDE - ILC Barry Barish P5 Meeting - Fermilab 1-Feb-08.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
EUROTeV and the ILC Global Context Nick Walker (DESY) EUROTeV Annual Meeting INFN Frascati 24 January 2008.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
FALC Was “Funding agencies for linear collider” Now “funding agencies for large colliders” WHY ??
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Mike Harrison LCFOA meeting July 08 Americas ILC Status - Baseline Design Gev e+ e- Linear Collider Energy 250 Gev x 250 Gev Length km.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Barry Barish LCWS12 Arlington, TX 22-Oct-12 ILC – Status, TDR and Costs Global Design Effort 1 22-Oct-12 LCWS12 - Arlington, TX TDR Part I: R&D TDR Part.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
28-Jan-08 SiD Workshop Global Design Effort 1 ILC Status Impacts of US/UK Budget Actions Replan for GDE Technical Design Phase Barry Barish SiD Workshop.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
April 29, 2009 M. Ross for PM Global Design Effort 1 GDE Global Program Marc Ross for: Akira Yamamoto, Nick Walker GDE Project Managers Risk Reduction.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
Presented by Marc Ross - for the ILC Project Managers: Research and Development Resources PAC Review, Vancouver, Marc Ross, Fermilab - Global.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
17-21 April 09 AAP - Tsukuba Global Design Effort 1 First Results of Geological Investigations of Dubna Siting of Dubna Siting Status of the ILC activity.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Barry Barish ECFA Workshop in Warsaw, Poland 9-June-08
LCWS11 AWG9 PARALLEL SESSION SUMMARY
CLIC/ILC Collaboration Meeting: Objectives & Organization
ILC Global Design Effort
Yasuhiro Okada, Executive Director, KEK
Barry Barish JSPS - Sendai 12-Sept-11
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

14-Feb-08 HEPAP Global Design Effort 1 Navigating the Bumpy Road to the ILC Barry Barish GDE Workshop - Sendai 3-March-08

14-Feb-08 HEPAP Global Design Effort 2 Today Impacts of UK, US funding actions Motivation and strategy for future global ILC R&D and design efforts Elements of a global replan. Now called Technical Design Phase I (2010) and Technical Design Phase II (2012) CLIC / ILC Collaboration Goals of the Sendai Meeting

14-Feb-08 HEPAP Global Design Effort 3 Impacts – US / UK Funding UK ILC R&D Program –About 40 FTEs. Leadership roles in Damping Rings and Positron Source, as well as in the Beam Delivery System and Beam Dumps. –All of this program is generic accelerator R&D, some of which may be continued outside the specific ILC project, retaining some key personnel. US Program –ILC R&D reduced $60M  $15M for FY08. Planning a reduced level program for FY09 and beyond. US President’s FY09 budget proposal is $35M –Generic SCRF also terminated in FY08, but is expected to be revived in FY09 to $25M. and separated from ILC R&D.

14-Feb-08 HEPAP Global Design Effort 4 Replanning -- The starting point Original charge of the GDE (from ILCSC, ICFA and FALC) was to develop a “global” design. We have succeeded! –Established a baseline for the ILC (0.5 years) This required ~40 critical decisions to agree globally on the key features of a linear collider –Developed a reference design, including international reviews of design, R&D program and costs (1.5 years) We reached the original goals !! We are at a crossroads. Best strategy for future efforts toward a linear collider?

14-Feb-08 HEPAP Global Design Effort 5 RDR Reports Reference Design Report (4 volumes) Executive Summary Physics at the ILC Accelerator Detectors

14-Feb-08 HEPAP Global Design Effort 6 The Broader Context THE SCIENCE !!! –Nothing has changed. A linear collider remains the consensus choice as the highest priority long term investment for particle physics The Technology –Key technical, design & cost issues must be resolved before a serious project can be proposed Strong Global encouragement –Strong response urging us to forge ahead and find ways to help or replace US and UK efforts. –Global commitment to the Common Fund (Spain & India) –Offers - visiting appointments, equipment help, travel, etc

14-Feb-08 HEPAP Global Design Effort 7 Next Phase: Goals and Strategy The next phase of the ILC Global Design Effort should produce a technical design of the ILC in sufficient detail that project approval from all involved governments can be sought. –Critical R&D demonstrations complete –Document the design having reliable costing –Develop a project plan Timescale: Be prepared when LHC results justify the project Central coordination of the GDE is even more essential, if we want to prepare to propose an ILC project Recovery plan from UK and US actions developed with reduced goals, strict prioritization & stretched out timescale A two stage Technical Design Phase (TDP I 2010 and TDP II 2012 is proposed

14-Feb-08 HEPAP Global Design Effort 8 Specific Context for our Replan Building close collaboration with XFEL. It will provide all SCRF development, except high gradient and ILC scale mass production, including a full systems test in 2013, industrialization, etc. We plan to take advantage of alignments and synergies where they will exist with US generic SCRF program, Project X development, etc. Undertaking steps to integrate linear collider (ILC and CLIC) R&D efforts, where beneficial to both efforts (meeting on 8-Feb). Examples – sources, damping rings, beam delivery, conventional facilities, detectors

14-Feb-08 HEPAP Global Design Effort 9 New plan - Technical Design Phase The TDP R & D Plan represents a practical balance between: –the R & D priorities as identified during the Reference Design phase; –the available funding and supporting infrastructure; and –the interest and skills of a given institution. These three considerations are facilitated through: –the Reference Design Report and the associated value estimate; –input from the Regional Directors, funding program and institutional managers; and –responses to a broadly distributed solicitation of ‘Expressions of Interest’.

14-Feb-08 HEPAP Global Design Effort 10 TDP I Technical risk reduction: –Gradient Results based on re-processed cavities Reduced number 540  351 (reduced US program) –Electron Cloud (CesrTA) Cost risks (reductions) – Main Cost Drivers –Conventional Facilities (water, hall sizes, etc) –Main Linac Technology Technical progress (global design) –Cryomodule baseline design is a being developed (e.g. plug compatible parts)

14-Feb-08 HEPAP Global Design Effort 11 R&D Test Facilities and Program Test FacilityDeliverableDate ATFGeneration of 1 pm-rad low emittance beam2009 STFRF Unit demonstration2011 FLASHFull 10mA, 1 GeV, high-repetition rate operation2008 ATF-2 Final Focus Optics and Stabilisation Demonstration: Demonstration of compact Final Focus optics (design demagnification, resulting in a nominal 35 nm beam size at focal point) Stabilisation of 35 nm beam over various time scales.2012 STFRF Unit demonstration2012 FLASHFull 9 mA, 1 GeV, high-repetition rate operation2009 ILC-SLACESAEnergy spectrometer, energy spread and collimator tests2008 CESR-TA Electron cloud mitigation studies: Re-configuration (re-build) of CESR as low-emittance e-cloud test facility. First measurements of e-cloud build-up using instrumented sections in dipoles and drifts sections (large emittance) Achieve lower emittance beams. Measurements of e-cloud build up in wiggler chambers Characterisation of e-cloud build-up and instability thresholds as a function of low vertical emittance (<20 pm) 2010

14-Feb-08 HEPAP Global Design Effort 12 Cavity Gradient TD Phase goals for gradient R & D are: Achieve 35 MV/m in 9-cell cavity in vertical dewar tests with a sufficient yield Preparation process and vertical test yield for 35 MV/m at Q0 = should be greater than 50% for a sufficiently large number (greater than 100) of preparation and test cycles by the beginning of CY 2010 (TDP1) and 90 % by CY 2012 (TDP2). (includes 20% re-processing fraction) Perform a series of inter-laboratory cavity exchanges and re-test sequences in order to cross-check and compare infrastructure performance Deliver a gradient recommendation to the TD Project in time to allow the development of a consistent linac design. This should be before the beginning of CY 2012.

14-Feb-08 HEPAP Global Design Effort 13 DESY Cryomodule Performance

14-Feb-08 HEPAP Global Design Effort 14

14-Feb-08 HEPAP Global Design Effort 15 Conventional Facilties Program Program of ‘Value Engineering’, whereby an attempt is made to assure the highest value by delivering all required functions at the lowest overall cost. The TD Phase CFS activities are therefore focused on this activity and are broadly subdivided into three stages: –a preparatory stage, during which the design criteria used to develop the Reference Design are revisited and analyzed; –a Value Engineering review stage, where the functional requirements are compared one at a time with their respective cost and a small set of prospective improvements are proposed; –an evaluation and design update stage during which the design is improved through adoption and analysis of the suggestions. Based on expected CFS engineering resources for the TD Phase, stages (1) and (2) above are expected to last about two and a half years.

14-Feb-08 HEPAP Global Design Effort 16 Value Engineering Milestones

14-Feb-08 HEPAP Global Design Effort 17 SCRF Global Cavity Program Americas FY06FY07FY08FY09FY10TOTALFY11FY12 (actual) TDP1 Cavity orders Total 'process and test' cycles Asia FY06FY07FY08FY09FY10 FY11FY12 (actual) Cavity orders Total 'process and test' cycles Europe (actual) Cavity orders60* Total 'process and test' cycles Global totals Global totals - cavity fabrication Global totals - cavity tests

14-Feb-08 HEPAP Global Design Effort 18 TDP II RF unit test – 3 CM + beam (KEK) Complete the technical design and R&D needed for project proposal (exceptions*) –Documented design –Complete and reliable cost roll up Project plan developed by consensus –Cryomodule Global Manufacturing Scenario –Siting Plan or Process

14-Feb-08 HEPAP Global Design Effort 19 Cryomodule Design: Plug Compatible

14-Feb-08 HEPAP Global Design Effort 20 Cryomodule Testing Plan

14-Feb-08 HEPAP Global Design Effort 21 Goal of S1

14-Feb-08 HEPAP Global Design Effort 22

14-Feb-08 HEPAP Global Design Effort 23 TDP II 2012 what won’t be done? Detailed Engineering Design (final engineering, drawings, industry, etc) will follow before construction. Global CM industrial plant construction Some other unresolved issues –Positron Source ??? –Damping Ring Design work?

14-Feb-08 HEPAP Global Design Effort 24 CLIC/ILC Collaboration

14-Feb-08 HEPAP Global Design Effort 25 CLIC/ILC Collaboration

14-Feb-08 HEPAP Global Design Effort 26 CLIC/ILC Collaboration

14-Feb-08 HEPAP Global Design Effort 27 TILC – Working Groups WG-1Cost Reduction Studies APPROACH –Review and evaluate RDR design –Re-visit (Caltech) cost reduction lists –Brainstorming SPECIFIC TARGETS (Cost Drivers) –Staging? / Scope? –Main Linac Technology –CDF -- Scope of halls, caverns, shafts, etc. Two vs One tunnel. Shallow vs Deep sites GOALS –Sendai – establish cost reduction goals NOTE –NO CHANGES OF PHYSICS SCOPE WITHOUT ENGAGING EXPERIMENTAL COMMUNITY

14-Feb-08 HEPAP Global Design Effort 28 TILC – Working Groups WG-2Superconducting RF APPROACH –Establish credible SCRF design, ready for production SPECIFIC TARGETS –Demonstrate gradient and yield –Cryomodule design issues –RF System test GOALS –Complete S0 goals (35MV/meter and 90% yield by 2012 with intermediate goal of validating gradient with 50% yield by –Plug compatible cryomodule plan –RF Unit Test at STF (also Fermilab?)

14-Feb-08 HEPAP Global Design Effort 29 TILC – Working Groups WG-3Beam Delivery System APPROACH –Design and value engineering for BDS –ILC-CLIC joint issues SPECIFIC TARGETS for Sendai –ATF-2 status and planning –MDI issues –joint sessions with detector people GOALS –IR integration planning and discussion on cost-reduction.

14-Feb-08 HEPAP Global Design Effort 30 TILC – Working Groups WG-4Damping Rings APPROACH –Demonstrate electron cloud mitigation and evolve the design SPECIFIC TARGETS for Sendai –Acceptance of baseline lattice (workshop deliverable) –ATF, e-cloud status –Planning CESR-TA two year program GOALS –Sendai – review status and define the program and goals for TDP- I –Define strategy for implementation

14-Feb-08 HEPAP Global Design Effort 31 Other Issues Publication of TD (phase I & II) R&D plan –Update and release present document (following Sendai) –WP and global resource consolidation –(Confirm/Modify plan at Sendai) EDMS and related –Implementing ILC-EDMS –RDR documentation (descoping consolidation) –Establishing the baseline –(Re-)establishing VALUE traceability VALUE estimate –Tools for maintaining VALUE estimate –Plans for implementation –(links up with previous bullet point)

14-Feb-08 HEPAP Global Design Effort 32 Conclusions A plan to recover from UK and US actions is proposed with reduced goals, strict prioritization and stretched out timescale A two stage ILC Technical Design Phase (TDP I 2010 and TDP II 2012 is proposed) Cost reduction and producing a robust design and implementation plan on the time scale of LHC results must remain our primary goals.