Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Requirements Specification and Management
Link Board Upscope Frascati group Napoli group Warsaw group.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Workshop 24 Jun 11 AB Workshop on GEMs for CMS high  Last September’s workshop showed that MPGD technology is now mature. Stable operation of large area.
RPC Endcap Maintenance and RE4 Upscope Anton Dimitrov on behalf of RPC TC CMS Week Dec 2012 CERN, Geneva.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
CMS Status Report 8 th CERN-Korea Committee Meeting CERN October Guido Tonelli University of Pisa/INFN/CERN Our physics goals. The CMS Experiment.
1 RPC project Upgrade Anna Colaleo (INFN-Bari) on behalf of Bari (Resp.D.Creanza), LNF (Resp.S. Bianco), Naples (Resp.L. Lista), Pavia (Resp.P. Vitulo)
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
India CERN Meeting, BARC, 28/02/11
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 HPL for the Up-Scope of the RE in CMS Contents Specification Contingency Supply Chain Purchasing QA & QC Packing.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 HPL for the Up-Scope of the CMS RE Low Eta as per the 1997 TDR in CMS Contents Specification Contingency.
U.S. ATLAS Project Manager’s Review with the Project Advisory Panel March 21-22, BNL Introduction Howard Gordon.
For 2016 RPCWorkshop 1 Charge Distribution dependency on gap thickness of CMS endcap RPC Sung Park, KODEL, Korea Univ On behalf of the CMS RPC group 1.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
Trigger & Tracking detector for CMS
Supported by Italian Ministry for Foreigner Affaires Sponsored by Academy of Scientific Research and Technology of the Arab Republic of Egypt (ASRT) CM.
Resistive Plate Chambers for CMS and INO
Sample Fit-Gap Kick-off
Roberto Calabrese Ferrara University and INFN
CMS GEM services: Cooling
Integration and Services RE3/1 and RE4/1
Micromegas Vertex Tracker Status Report
Integration and Services RE3/1 and RE4/1
Concluding remarks E. Migneco
Production ad Quality control of RPCs for the CMS muon barrel system
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
CMS November Upgrade Week
Third Workshop on GEMs for CMS
HPL DG d=1.4mm/e= mm.
To do list production organization and commitments
CMS RPC Endcap RE1 Status Report
Pierluigi Paolucci - I.N.F.N. Naples
RPC Detector Control System
A Cold SCU Phase-Shifter
RPC SYSTEM LAYOUT and DIMENSIONS
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
RPC Detector Control System
Presentation transcript:

Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 However, due to technical and financial reasons, only three layers up to  = 1.6 are present in the endcap region. up scope

Low  up-scope Increasing the number of stations the algorithm has a better efficiency and is less affected by noise Two options: Restore the TDR scheme by adding a fourth layer in YE4 Move the actual layer in YE2 to YE4 and add a double-chamber layers in YE2 Two options: Restore the TDR scheme by adding a fourth layer in YE4 Move the actual layer in YE2 to YE4 and add a double-chamber layers in YE2 Also a double station with OR/AND capability could reduce the noise  

TDR vs Double Station TDR: 150 new chambers no noise redaction capability in layer YE2 TDR: 150 new chambers no noise redaction capability in layer YE2 Double Station: 300 new chambers Integration issues are demanding Double Station: 300 new chambers Integration issues are demanding Full Endcap ( Towers 8 – 16 == 1.04 < η <2.10 )

Ghost rate is dominated by RE1 and RE3. Switching off RE2 does not affect the ghost rate TDR Geometry ε = 95 % Rate = 0.05 Hz cm -2 What if the second station (RE2) fails?

The RPC up scope basics Although simulation studies are continuing, at the moment seem reasonable to go with the “single layer” approach. The project should be in the context of the present RPC project, which would then have an “operation” branch and an “up scope” branch. This would ensure the proper expertise in all phases (production, test, installation/integration, commissioning, operation). Strong “European “ involvement and funding should be ensured. Production should be concentrated in very few sites (maximum two). An important CERN/CMS facility for production /quality assurance should be foreseen.

A draft scheme to be discussed

Project partners Main partners should be: Korea, Pakistan, China, India, Belgium, CERN_ CMS*, Italy*. Colombia, Brazil, Egypt, Iran, have expressed interest. Their involvement should be maximized. Korea (KODEL) just ended gap production for PHOENIX. Willing to continue. A more comprehensive involvement in CMS RPC is under way by all the Korean groups. Pakistan was very active in the RPC forward production. Large involvement in operation. At the moment funds are not secured for the up scope * Discussion under way

Project partners China is ready to produce part of the mechanic. India already produced few spare chambers. Willing to continue. Belgium is largely involved in the operation. Strong interest for the up scope. CERN_CMS was coordinating some procurement, final test at ISR, integration, logistic. Its involvement is absolutely needed. Could substantial production fraction take place at CERN? Italy_INFN participation should be secured. Possible contribution could be the off detector electronics.

Gap production HPL procurement in Italy. Some effort needed to reestablish production. Expertise available. A different factory (w.r.t. to the past) has to be involved. Gap should be built in Korea. There we have a team of physicists to follow the validation procedure. GT could as well produce gaps, but we need a team for the production validation. In this case it has to be from CERN (backup solution).

Procurement/Production matrix HPLCoordinated by CERN Gap KODEL Front end India/Belgium Honeycomb panel/stripChina Other mechanic componentsAssembly sites Off detector electronicsItaly HV/LV system India/Belgium Cables Coordinated by CERN Chamber assembly candidates: CERN (904), Belgium (Ghent), India (BARC). Try to further concentrate. Investigate local agencies constraints about “in kind /cash” contribution ratio. Concentrate expertise from other labs in the production host labs

A possible scenario for production Allow minimal production/certification (order 20 chambers) to take place in India and Belgium for students and physicists training Concentrate the core production (order 130 chambers) at CERN under the responsibility of Indian/Belgium groups. Preassembly components at the home labs, but make the final assembly/certification at CERN Built a strong CERN facility under the CMS group financial and operational responsibility Strongly motivate Indian/Chinese/Pakistan/Belgium/Egyptian physicist to joint both chamber production and detector operation at CERN

Cost/Funds ( kCHF) Double stationTDR Detector Front end Off detector electronics HV/LV system Service/infrastructure Cable Logistic CERN Assembly/installation Korea400 Pakistan ? China500 Belgium800 India800 Egypt 200 CERN700 (tentatively estimated, to be discussed) Italy600 (tentatively estimated, to be discussed) 4000 One year old quotations

Concluding remarks A minimal achievement of one end cap installation in the shut-down seems realistic. Also synchronization with CSC installation should be considered. Important integration issues to be studied: chamber installation, cooling up scope, design of gas/HV/LV/signal services. Some re-design of services also at chamber level needed. Objectives of the workshop -Boost local interest in the project -Call for funds availability -Draft project organization -Draft responsibility matrix

Milestones Confirm feasibility of HPL production. Pre-produce 10% of the need and check specifications (Ian) Update the cost estimate with market enquires (Pino, Walter) Review the Integration/Service needs. Steering group with CSC (Salvatore, Walter) Review chamber design for cooling and gas circuit improvement (Luc) Discuss migration of LB system responsibly to INFN (Guido, Austin, Pino) TDR addendum by June?