1 The Combined Margin Approach: Issues and Options Michael Lazarus, SEI/Tellus World Bank Power Sector Workshop Caesar Park Hotel, Buenos Aires December.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
Tel MW Wind Farm 100X850kW Wind Turbine 9 m/s Average Wind Speed 45% capacity factor 335 GWh/year Egypt / Spain Cooperation.
Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
Will CO2 Change What We Do?
EPA’s Clean Power Plan Proposed Rules for Reducing GHG Emissions from Power Plants Presentation to ACPAC June 16,
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Reliability Risks and Lessons Learned In The Wake Of The Polar Vortex OPSI Annual Meeting October 14, 2014.
World Bank Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities December 3, 2005 Montreal.
Eng Rafik G. M. of Economic and Environment Studies NREA Baseline For Japanese Wind Power Plant Project in Zafarana (Arab Republic of Egypt)
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
22 April 2010 EWEC 2010 Warsaw2 Jesper Munksgaard Ph.D., Senior Consultant Merit Order Effect of Wind Power – Impact on EU 2020 Electricity Prices.
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
Methodologies for Quantifying Energy Security in the Power Sector William Blyth 24 th April 2005.
Clear Thinking on Nuclear: New Plant Construction Nuclear energy is dependable, affordable, and environmentally sound. Nuclear energy is needed to meet.
Turning the wind into hydrogen: Long run impact on prices and capacity
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Greenhouse Gas Emissions Reductions from Wind Energy : Location, Location, Location? Duncan Callaway SNRE & Department of Mechanical Engineering
UNEP rise centre - Demark Fourth regional workshop and training on “Capacity development for the clean development mechanism” 4-6 April - AIT Thailand.
Baseline methodologies for grid- connected electricity – Context and Introduction to the Combined Margin Baseline Calculation Martina Bosi, World Bank.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Biomass Carbon Neutrality in the Context of Forest-based Fuels and Products Al Lucier, NCASI Reid Miner, NCASI
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Federal Policies for Renewable Electricity: Impacts and Interactions Anthony Paul Resources for the Future (RFF) December 3, 2010 Fourth Asian Energy Conference.
The Economics of Marine Renewable Energy Peter McGregor Fraser of Allander Institute, Department of Economics, University of Strathclyde Second Forum on.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
THE CHALLENGES OF EUROPEAN ENERGY SECURITY Jiří Feist, CEZ Group.
August 17, 2006 ICF Consulting RGGI Preliminary Electricity Sector Modeling Results Phase III RGGI Reference and Package Scenario.
1 Electricity Baselines for Grid- Connected Renewables: ACM 0002 Issues and Options Michael Lazarus, SEI Workshop on CDM Methodologies and Technical Issues.
Challenges for district heating methodologies Worldbank Workshop on CDM Methodologies 5 December 2005 Lambert Schneider.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
CD4CDMCD4CDM Estimating CO 2 Emissions Reduction by example.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Northwest Power and Conservation Council Slide 1 Direct Use of Natural Gas Economic Fuel Choices from the Regional Power System and Consumer’s Perspective.
Bishkek, 7th of December 2009 Training Workshop: Baseline Study of the Kyrgyz Power Sector for Clean Development Mechanism Presentation III: Case Study.
Financing climate-friendly projects in the Balkan region DAC PROJECT CAPACITY BUILDING IN BALKAN COUNTRIES IN ORDER TO DEAL WITH CLIMATE CHANGE Prepared.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Context, Principles, and Key Questions for Allowance Allocation in the Electricity Sector Joint Workshop of the Public Utilities Commission and Energy.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
Power System Economics Daniel Kirschen. Money © 2012 D. Kirschen & University of Washington1.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
Revis James Director Energy Technology Assessment Center 2010 AABE Conference May 20, 2010 Creating a Low-Carbon Future EPRI’s 2009 Prism- MERGE Study.
American Public Power Association Pre-Rally Workshop February 28, 2006 Washington, D.C. Climate Change: Making Community-Based Decisions in a Carbon Constrained.
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities.
Update on methodological work within UNFCCC and future outlook Workshop on CDM Methodologies and Technical Issues 3 rd December, 2005 Montreal, Canada.
Does project reduce, prevent or mitigate the release of 1 or more of the Kyoto gases [See appendix 3]? Does the project remove CO2 or other GHGs from the.
Case Study 1: Comments on Transparency and Conservativeness Alan Silayan klima-Climate Change Center.
Allocation of CO 2 Emission Allowances in RGGI Dallas Burtraw, Karen Palmer, Danny Kahn Resources for the Future Presentation to RGGI Stakeholder Meeting.
El Gallo Hydroelectricity Project PDD Analysis
PJM©2008 Potential Effects of Proposed Climate Change Policies on PJM’s Energy Market Paul M. Sotkiewicz, Ph.D. Senior Economist PJM Interconnection Organization.
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
1 Proposed Input Assumptions to RTF Cost-Effectiveness Determinations February 2, 2010.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
Some open questions in power sector methodology Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event Dehli,
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
October 26, 2005 ICF Consulting RGGI Electricity Sector Modeling Results RPS Sensitivity & Very High Emissions Reference and Package Cases.
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
Updated Energy Year 2011 Electricity Finnish Energy Industries
Diversification of Energy Power Plants in the North of Chile Matías Raby.
Forecasting Power System Hourly Load and Emissions for Air Quality Modeling ERTAC-EGU Model Development Group – Webinar & Outreach slides Robert.
Presentation title Methodological tool and data for the development of a SB for the emission factor of an electricity system CDM Standardized Baselines:
Joshua Linn (MIT and Resources for the Future)
Presentation transcript:

1 The Combined Margin Approach: Issues and Options Michael Lazarus, SEI/Tellus World Bank Power Sector Workshop Caesar Park Hotel, Buenos Aires December 8, 2004

2 Overview of Presentation  The problem  The options  The combined margin approach –Underlying rationale and practical considerations –Strengths and weaknesses  Next steps and new directions

3 What’s the problem?  Power sector projects and CERs depend on an unknowable counterfactual baseline  CERs = MWh project x (tCO2/MWh baseline - tCO2/MWh project )  Baseline methodologies should balance –Accuracy –Feasibility (cost and data availability) –Transparency –Consistency (over time and space) –Credibility  Standardize or proliferate?  Rely on simple or complex models?

4 A CDM electricity project might affect:  The choice and/or timing of new power plants (or life extension of existing ones), i.e. the build margin, and/or  The operation of existing power plants, i.e. the operating margin,  Depending on –Context: excess capacity, suppressed demand, fixed investments –Project characteristics: peak vs. baseload, load-following vs. resource-driven (firm vs. non-firm) –Market behavior: plans, intuition, and time-scale of interest (short- term vs. long-term) –Project size: Cumulative effects of small projects, delay vs. displace new capacity additions

5 Simplified representation

6 Potential impact of a small CDM project The maroon area shown above may represent delayed (i.e. avoided) new generation capacity.

7 What are the methodological options… …assuming that a CDM project has a mix of build and operating margin effects?  Use a model capable of reflecting all effects –full simulation or optimization models (not just dispatch)  Use models or algorithms to estimate each effect separately, and then combine them: –E.g. consolidated/small-scale CDM methodology, “CERUPT” methodology, consolidated CDM (ACM0002)  Decide which effect predominates and ignore the other

8 ACM0002 combined margin approach Calculate a baseline emission factor EFy as the weighted average of the Operating Margin emission factor (EF_OMy ) and the Build Margin emission factor (EF_BMy,): EFy = (wOM * EF_OMy) + (wBM * EF_BMy) where the weights wOM and wBM, by default, are 50% (i.e., wOM = wBM = 0.5)

9 OM and BM methods CDM Consolidated methodology (ACM002) currently contains:  4 options for calculating the operating margin: –Simple OM: Weighted-average emission rate excluding low-operating cost and must-run power plants –Simple Adjusted OM: Including some must-run/low-cost resources (e.g. hydro) where they dominate a grid –Dispatch data analysis OM –Average OM

10 And 1 option for calculating the build margin: …the generation-weighted average emission factor of a sample of power plants m, as follows, EF_BMy =  FUEL USE * EMISSION COEFF/GENERATION where the sample group m consists of either the 5 most recent or the most recent 20% of power plants built or under construction, whichever group’s average annual generation is greater (in MWh);  Option of ex ante or ex post analysis for either OM or BM

11 Combined margin results: CERUPT example Note CERUPT (2002) methodology shown here differs from ACM0002

12 Potential applications of the combined margin method  Zero or near-zero emission sources –renewable energy –energy efficiency? –several AMs and ACM0002  Lower-emission sources –Combined heat-and-power –New natural gas plants? –Added production from plant upgrade or repowering?  Uncertainties or errors have a much larger relative impact on lower-emission sources –Difference between project and baseline emission rates (tCO2/MWh) may be quite small

13 What are its strengths and weaknesses?  Strengths –Relative simplicity and feasibility: low-cost, manageable data and skill requirements –Incorporation of both OM and BM effects –Consistent and comparable across regions and projects –Relatively transparent and credible: data verifiable  Weaknesses/challenges –Applicability to larger investments, lower-emission (e.g. natural gas) projects –Justification of OM/BM weights (50/50 or other) –Dependence on lumpy, historical data for build margin –Application of dispatch analysis –Reflection of local market and operational conditions

14 Next steps and new directions  Enhancing the consolidated CDM methodology –More forward-looking, less volatile build margin methods –Weighting the operating and build margins based on project, context, and other factors –Standardized methods to fill “data gaps” –Applying/extending dispatch analysis and hydro-based system methods  Developing other methods –Model-based methodologies that are transparent and credible  Cross-country, cross-context comparisons  Complementary mechanisms to support low-GHG power sector investments and strategies?

15 SummarySummary  Combined margin is an umbrella term for any method that accounts for a project’s effects on both what is built and what operates in the future.  Simplified CM approaches can balance many competing objectives (accuracy, feasibility, consistency, transparency, credibility)  Considerable scope for improvement and new approaches

16 EXTRA SLIDES FOLLOW

17 Electricity Imports in ACM0002 For the purpose of determining the Operating Margin (OM) emission factor, as described below, use one of the following options to determine the CO2 emission factor(s) for net electricity imports (COEFi,j,imports) from a connected electricity system within the same host country(ies): (a) 0 tCO2/MWh, or (b) the emission factor(s) of the specific power plant(s) from which electricity is imported, if and only if the specific plants are clearly known, or (c) the average emission rate of the exporting grid, if and only if net imports do not exceed 20% of total generation in the project electricity system, or (d) the emission factor of the exporting grid, determined as described in steps 1,2 and 3 below, if net imports exceed 20% of the total generation in the project electricity system. For imports from connected electricity system located in another country, the emission factor is 0 tons CO2 per MWh.

18

19

20 Simple, adjusted OM (hydro-dominated)

21 Historical build margin (US) Capacity additions, recent and projected,–United States

22 GWh/h 0 5,000 10,000 15,000 20,000 25,000 30,000 Nuclear Geotérmica Eólica Carbón Ciclo Combinado Dual Vapor Hidráulica Turbogás DomingoLunesMartesMiércolesJuevesViernesSábado Example of weekly dispatch 5 al 12 de diciembre de 1999