CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN-03 12 DAYS FREQ COMPARISION JAN-02 & JAN-03 12 DAYS FREQ JAN-03 12 DAYS FREQ JAN-02 TYPICAL.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
FREQUENCY SPECTRUM FROM AUGUST 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Aug
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
1 ABT Based Boundary Metering. 2 ABTBoundary Metering+
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
FREQUENCY PATTERN DURING JAN 2007 Freq Profile 1-11 Freq Profile Freq Profile
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
W E L C O M E Power Grid Corporation of India Limited.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority.
WELCOME TO CIGRE MEMBERS
Low Peak Frequency High Off-Peak Frequency Wide Frequency Fluctuation Damage to Generating Plants and Consumers’ Equipment Merit Order not followed - Optimizat.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
NLDC 1 Ancillary Services in Indian Context. NLDC 2 Outline Definition Drivers for Ancillary Services Ancillary Services in Indian Context.
UI IN SR (FROM 01/01/03 TO 13/05/07) TOTAL UI TURNOVER :- 13,831 MU TOTAL UI AMOUNT DISBURSED:- 3,177 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
AVAILABILTY BASED TARIFF. AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
1 KADAMPARAI PUMP OPERATION GENERATOR MODE PUMP. 2 KADAMPARAI ENERGY GENERATED/PUMPED DURING LAST 5 YEARS (MU) MONTHS *
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
Issues for discussion ON INTERTRIP SCHEME AT TALCHER II Present Scheme has worked satisfactorily as per the Logic designed On number of occasions unit(s)
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
1 PRESENTATION ON FREQUENCY CONTROL AND FREE GOVERNOR OPERATION TO THE OFFICERS OF CENTRAL ELECTRICITY AUTHORITY On 4 th April, 2005 by V.K. Agrawal SRLDC,
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
UI IN SR (FROM 01/01/03 TO 12/08/07) TOTAL UI TURNOVER :- 14,596 MU TOTAL UI AMOUNT DISBURSED:- 3,434 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Hon’ble Commission has issued Interim order dated 19/ directing :
KADAMPARAI PUMP OPERATION
FREE GOVERNOR MODE OF OPERATION
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
Economics for Constituents
ABT & Frequency.
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
THE RPUF SCHEME KHAMMAM VIJAYAWADA NAGARJUNASAGAR HYDERABAD RAICHUR
An operational analysis of Kadamparai Pumped Storage Hydro Plant located in Tamil Nadu Sanyasi Naidu.
Presentation transcript:

CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL FREQ CURVE TALCHER-KOLAR ENERGY ABT EXPERIENCE 15 DAYS FREQ COMPARISION DEC-02 & JAN DAYS FREQ JAN DAYS FREQ DEC-02

FREQUENCY COMPARISION ( SOUTHERN REGION ) 01-JAN-03 FVI = JAN-02 FVI = 24.28

FREQUENCY COMPARISION ( SOUTHERN REGION ) 02-JAN-03 FVI = JAN-02 FVI = 26.12

FREQUENCY COMPARISION ( SOUTHERN REGION) 03-JAN-02 FVI = JAN-03 FVI = 2.39

FREQUENCY COMPARISION ( SOUTHERN REGION) 04-JAN-03 FVI = JAN-02 FVI = 27.86

FREQUENCY COMPARISION ( SOUTHERN REGION) 05-JAN-03 FVI = JAN-02 FVI = 24.13

FREQUENCY COMPARISION ( SOUTHERN REGION) HOUR--  HZ ----> 06-JAN-02 FVI = JAN-03 FVI = 1.51

FREQUENCY COMPARISION ( SOUTHERN REGION) 07-JAN-03 FVI = JAN-02 FVI = 27.09

FREQUENCY COMPARISION ( SOUTHERN REGION) 08-JAN-03 FVI = JAN-02 FVI = 27.55

09-JAN JAN-02 FREQUENCY COMPARISION ( SOUTHERN REGION )

10-JAN JAN-02 FREQUENCY COMPARISION ( SOUTHERN REGION )

11-JAN JAN-02 FREQUENCY COMPARISION ( SOUTHERN REGION )

12-JAN JAN-02 FREQUENCY COMPARISION ( SOUTHERN REGION )

13-JAN JAN-02 FREQUENCY COMPARISION ( SOUTHERN REGION )

FREQUENCY COMPARISION (Southern Region)

2003 FREQUENCY PROFILE FROM 1 st JAN to 12 th JAN (Southern Region)

2002 FREQUENCY PROFILE FROM 1 st JAN to 12 th JAN (Southern Region)

FREQUENCY CURVE FOR 10 TH JANUARY 2003 FVI = 0.45 Avg Freq = 49.96Hz

ABT IMPLEMENTATION IN SR SINCE EXPERIENCE – REG. 1.FREQUENCY PROFILE IEGC ALLOWABLE RANGE ( HZ) – 100% ( HZ) – 68 % 2. SELF CORRECTION BY ALL CONSTITUENTS TO ADHERE TO SCHEDULE DURING LOW FREQUENCY AVOIDING OVER DRAWAL – NO MESSAGE FROM SRLDC. 3.FVI : BETWEEN 0.45 TO 3.14 ( 0.45 ALL INDIA RECORD ) 4.QUICK RESPONSE FROM CONSTITUENTS IN CORRECTING FREQUENCY IN THE EVENT OF CONTINGENCY. 5.INCREASED BILATERAL EXCHANGES. - PONDICHERRY AVAILING POWER FROM NEYVELI. - BILATERAL CONTRACT BETWEEN KSEB & TNEB IN PIPE LINE. 6.ALL ISGS IN SR GETTING FULL REQUISITION/DESPATCH SCHEDULE. IN CASE OF LESS REQUISITION BY ANY CONSTITUENT (FOR SOME TIME BLOCK), OTHER CONSTITUENT(TN) AVAILING SAME ON BILATERAL BASIS. 7.SR CONSTITUENTS EARNED 45LAKHS ON ACCOUNT OF EXPORT FROM SR TO WR UNDER UI MECHANISM DRING 1ST JAN TO 5TH JAN 03.

8.300MW POWER BEING WHEELED FROM ER TO WR THROUGH SR. 9.BEST UTILISATION OF PUMPED STORAGE SCHEME (TNEB). 10.HYDRO BEING UTILISED IN MOST OPTIMAL FASHION (20MU LESS GENERATION AS COMPARED TO LAST YEAR). 11.CONSTITUENTS FOLLOWING MERIT ORDER WHILE DEPATCHING THEIR INTERNAL GENERATION/IPPs. 12.VOLTAGE PROFILE MOSTLY REMAINING BETWEEN 97 – 103%. 13.CONSTITUENTS EXPRESSED THEIR WILLINGNESS TO PUT GENERATORS ON FREE GOVERNOR MODE. 14.IMPLEMENTED SCHEDULES FOR COMPLETED DAY ARE BEING UPLINKED AT THE SRLDC WEB SITE ( ABT IMPLEMENTATION IN SR SINCE EXPERIENCE – REG.

TALCHER-KOLAR SR AVAILED 382MUs FROM ER THROUGH TALCHER-KOLAR UPTO DEC-02 TOTAL (IN MU)MAX FLOW (IN MW) SEP – OCT – NOV – DEC –

JAN-2003 DEC-2002 FREQUENCY COMPARISION (Southern Region)

DEC-2002 FREQUENCY PROFILE FROM 1 st DEC to 15 th DEC (Southern Region)

JAN-2003 FREQUENCY PROFILE FROM 1 st JAN to 15 th JAN (Southern Region)