PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.

Slides:



Advertisements
Similar presentations
PHENIX WEEKLY PLANNING 9/13/2007 Don Lynch. 9/13/2007 Weekly Planning Meeting 2007 PHENIX Shutdown April-June 2007: Complete run, De-mount HBD West, Begin.
Advertisements

PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 6/7/2007 Don Lynch. 6/7/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day No More Planned Remove.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 5/31/2007 Don Lynch. 5/31/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6 or 6/13/07?
1 2/12/2009 PHENIX WEEKLY PLANNING 2/12/2009 Don Lynch.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
PHENIX WEEKLY PLANNING 5/24/2007 Don Lynch. 5/24/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6/07 Remove HBD.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
4/10/ PHENIX WEEKLY PLANNING April 10, 2014 Don Lynch.
1 2/26/2009 PHENIX WEEKLY PLANNING 2/26/2009 Don Lynch.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 8/9/2007 Don Lynch. 9/9/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
Technical Support /8/08 PHENIX WEEKLY PLANNING 5/8/2008 Don Lynch.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/18/2007 Don Lynch. 10/18/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
5/12/11 1 PHENIX WEEKLY PLANNING 5/12/2011 Don Lynch.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
Technical Support /19/08 PHENIX WEEKLY PLANNING 6/19/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX WEEKLY PLANNING 3/20/2008 Don Lynch. 3/20/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
PHENIX WEEKLY PLANNING 12/20/2007 Don Lynch. 12/20/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 7/26/2007 Don Lynch. 7/26/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
Technical Support /22/08 PHENIX WEEKLY PLANNING 5/22/2008 Don Lynch.
PHENIX WEEKLY PLANNING 11/8/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PHENIX WEEKLY PLANNING 2/16/06 Don Lynch. Prep for Run 6 Completed.
Presentation transcript:

PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch

2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane design review2/12/28 Next scheduled Maint. Day?2/272/27 Mu Trigger FEE Prototype II install2/27 2/27 Complete new beampipe design2/292/29 End PP run3/123/12 Low energy Run3/133/14 End of Run 83/155/27 Install new UPS~3/15~3/31 End of Run Party4/44/4 Install Gas house UPS’s4/156/13 Install HBD 7/159/15

2/21/2008 Weekly Planning Meeting3 Next Maintenance Access: Feb 27th Install and Test Mu Trigger prototype FEE Field fit CM access stair hardware Evaluate cable paths for MuTrigger FEE’s Other Tasks ?

2/21/2008 Weekly Planning Meeting4 CM Ladder/Stair Shutdown Access Ladders done Railing to be ready for next access

2/21/2008 Weekly Planning Meeting5 Design Reviews Mu Trigger FEE Prototype (Done) CM Crane (analyses complete) MMN Scaffolding 2/22 New Beampipe Review 3/3-3/14 Station 1 Scaffolding 3/3 – 3/7 RPC Prototype 3/25 (Prototype design, installation, gas system, electronics, safety) Mu Trigger FEE N & S 3/19 MuTrigger N & S rack platform 4/21-5/2 RPC Stations 1, 2 and 3 6/22-6/20 VTX/FVTX review8/1-8/31 NCC Review 8/1-8/31 MMS scaffolding 2/2/09-2/6/09

2/21/2008 Weekly Planning Meeting6 March 2008: RPC prototypes and MuTrigger FEE upgrades RPC Group: Detailed Layouts for RPC2 & RPC3 Mechanical assembly including detailed weights, materials, dimensions of components and subassemblies. Detailed layout for the Cu absorber Prototype Gas system requirements including gas mixture, flow rates, pressures, pressure drops, piping requirements (quantity/lengths, materials, OD, wall thickness. Prototype gas delivery/distribution/control/safety schematic including requirements for relief valves, gauges, valves, etc. Be prepared to address all gas safety issues. Prototype rack requirements including power, cooling water, etc. and rack component layout. Detailed installation scheme for prototypes including list of fixtures and special tools required for installation, transportation requirements (i.e. evaluation of level of care to take in moving transporting and orienting the prototypes from the factory through installation. Also include a list of infrastructure modifications required to install the prototypes. Detailed scheme for installing the Cu absorber for prototype including list of fixtures and special tools required for installation. Detailed description of all electronics requirements internal to the prototype detectors, in the prototype rack, and in the rack room. Include all safety issues for all items (fusing, grounding, Recognized lab ratings, e.g. UL, etc.) Other integration requirements, e.g. DAQ requirements Outlines for gas system and electrical system operating procedures. Items Needed for Design Review

2/21/2008 Weekly Planning Meeting7 March 2008: RPC prototypes and MuTrigger FEE upgrades Mu Trigger FEE Group: Detailed Layouts for FEE enclosure assembly including detailed weights, materials, dimensions of components and subassemblies. Cooling water and air requirements for FEE’s including flow rates, pressures, pressure drops and temperature control requirements. Provide schematics for water and air distribution including valves, gauges, etc. Rack requirements including power, cooling water, etc. and rack component layout. Detailed installation scheme for FEE’s including list of fixtures and special tools required for installation.. Detailed description of all electronics requirements internal to the FEE’s, in the racks, and in the rack room. Include all safety issues for all items (fusing, grounding, Recognized lab ratings, e.g. UL, etc.) Other integration requirements, e.g. DAQ requirements Items Needed for Design Review

2/21/2008 Weekly Planning Meeting8 New Beampipe Design & Review HBD BBC CM NCC/ RXNP MPC MMN MMS` NCC/ RXNP CM BBC Be ss

2/21/2008 Weekly Planning Meeting9 New Beampipe Design & Review Anamorphic view Normal (run) position 1. MPC&BBC max shadow 2. MPC no shadow 3. BBC no shadow Issues to be resolved

2/21/2008 Weekly Planning Meeting10

2/21/2008 Weekly Planning Meeting11 New Beampipe Design & Review Anamorphic view CM moved south position 1.Flange in NCC 2. Flange does not shadow MPC partial shadow of BBC. Only accessible in mid-move position 3. Flange does not shadow BBC or MPC Accessible in this position 3 21

2/21/2008 Weekly Planning Meeting12

2/21/2008 Weekly Planning Meeting13

2/21/2008 Weekly Planning Meeting14 CM Crane Uses Gorbel 1-ton capacity Ceiling mounted Bridge Crane, modified to be supported by 2 Steel Channels attached to CM Bridge and hoist to be removed for running. Crane Design ready for review Waiting for design review. Tuozzolo on vacation until next Monday.

2/21/2008 Weekly Planning Meeting15 New Platform 8’ x 2.5’ Muon Trigger Rack Platforms HBD/RXNP MuTrgrFEE NMuTrgrFEE S VTX FVTX NCC N NCC S RPC1 S RPC1 N New Platform 8’ x 2.5’

2/21/2008 Weekly Planning Meeting16

2/21/2008 Weekly Planning Meeting17

2/21/2008 Weekly Planning Meeting18

2/21/2008 Weekly Planning Meeting19

2/21/2008 Weekly Planning Meeting20

2/21/2008 Weekly Planning Meeting21

2/21/2008 Weekly Planning Meeting22

2/21/2008 Weekly Planning Meeting23

2/21/2008 Weekly Planning Meeting24

2/21/2008 Weekly Planning Meeting25

2/21/2008 Weekly Planning Meeting26 Mu Trigger FEE Cable Management Need to know quantities, sizes and routing

2/21/2008 Weekly Planning Meeting27 MMN Scaffolds

2/21/2008 Weekly Planning Meeting28 MMN Scaffolds Design is complete. Drawings to be sent to C-A tomorrow Station 1 Scaffolding is next

2/21/2008 Weekly Planning Meeting29

2/21/2008 Weekly Planning Meeting30

2/21/2008 Weekly Planning Meeting31 Other Work VTX, FVTX and NCC prototype support Integration Physical and Rack space Infrastructure upgrades New Counting House Door VTX Prototype for run 8 ?

2/21/2008 Weekly Planning Meeting32 Safety, Security, Etc. : Latest First Aid, DOE-Recordable and DART Cases 7 First Aid: 1 scraped knuckles, 1 walked into glass door/cut eyelid, 1 brushed finger against sander/abrasions 1 rushing to take conference call, slipped sprains and bruises 1 bruise by falling circuit board 1 cut using pliers to close valve 1 back pain after working on overhead fixture 2 DOE-Recordbale & DART: 1 fall hit head (unspecified situation details) ambulance 1 arm numbness after moving metal cart out of storage closet Contractor injury (not recordable/information only): Fractured hand while drilling hole-bit stuck then dril struck hand Snow/sleet/rain tomorrow – Be careful!

2/21/2008 Weekly Planning Meeting33 5 Year Plan 2008 Install stations 1& 2 of MuTr FEE upgrades (north), 1 octant Cu absorber (S), 1 half otants each RPC2/3 S, MMN sta. 2 scaffolding, MuTr Sta 1 N&S scaffolding, 1 octant of MuTrigger FEE upgrades (south, sta 1 & 2), MuTr N stn. 1 & 3 decaps, MuTrigger rack platforms (N&S), CM crane, remove/replace beampipe, infrastructure upgrades & repairs, misc. subsystem work, 1 RPC rack in South tunnel, MuTrgr FEE N & S racks 2009 Remove HBD & RXNP, scaffolding in MMS, MuTr S stn. 1 & 3 decaps, RPC2 N, RPC3 N, north Cu absorbers, partial VTX, iFVTX, MuTrgr S sta 1 & 2, MuTrgr S rack, 2 racks in N tunnel, infrastructure upgrades & repairs, misc. subsystem work 2010Remainder of VTX barrel, partial FVTX, south Cu absorber completed, MuTrgr FEE stn. 3 S, any remaining MuTr decaps, infrastructure upgrades & repairs, misc. subsystem work 2011RPC1 N&S, NCC N, remainder of FVTX, DC West upgrade/repair, remove absorbers, infrastructure upgrades & repairs, misc. subsystem work 2012NCC S, upgrades contingency & wishlist, infrastructure upgrades & repairs, misc. subsystem work, TBD new and improved upgrades * Years refer to the shutdown year and follow the run with the similar number (i.e. work in 2008 is to be done in the shutdown that follows run 8, and so on)

2/21/2008 Weekly Planning Meeting34 Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: Where To Find PHENIX Technical Info A busy shutdown is coming Let’s be prepared.