7 March 2014 10/24/20151.  MassDEP convened WNTAG to advise the Department on how to craft an effective regulatory & policy response to Wind Turbine.

Slides:



Advertisements
Similar presentations
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
Advertisements

Health and Safety Executive Health and Safety Executive CDM Revised Regulatory Package Update.
May 18, 2005 Oakdale Irrigation District Water Resources Plan.
EPA Proposed Mandatory Greenhouse Gas Reporting Rule.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
Recommendations on Certification of EHR Modules HIT Standards Committee Privacy and Security Workgroup April 11, 2014.
Federal Awardee Performance & Integrity Information System (FAPIIS) Overview J. Lisa Romney Defense Procurement & Acquisition Policy.
Mass DEP Noise Regulation and Wind Turbines
Proposed Amendments for Terrestrial Wind Regulation in the New Jersey Coastal Zone Kevin Hassell Coastal Management Office NJDEP.
Designated by US DOT Publication of Draft PFN for Comments - Spring 2013 Initial Designation of the PFN – Fall 2013 National Freight Network Primary Freight.
M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015.
BWEA OFFSHORE CONFERENCE 17 – 18 APRIL 2002 Offshore Consents Planning for the Future Nigel Peace Director, Energy Regulation Department of Trade & Industry.
ENVIRONMENTAL MANAGEMENT PLAN
Research Study on Wind Turbine Acoustics DRAFT March 7, 2014 Interim Results II for WNTAG.
Welcome to the Fall Training Session for St. Lawrence County Municipal Planning Boards and Zoning Boards of Appeal.
“Study on Other States’ Regulatory Oversight of Waste and Material Handling Activities Relative to Recycling Centers, Transfer Stations, and Green Material.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Compliance with the WTO Technical Barriers to Trade Agreement and Steps Toward Developing Good Regulatory Practices Bryan O’Byrne Trade Compliance Center.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Commonwealth Wind: Program Refinements and Research Projects Mass. Wind Working Group July 18, 2012.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Draft Community Planning Process May 26, 2008 For Discussion.
Canada Health Canada Santé Canada Consumer and Clinical Radiation Protection Bureau National Guidelines for Environmental Assessment: Health Impacts of.
Water Supply Planning Initiative State Water Commission November 22, 2004.
1 MassDEP Wind Turbine Noise Technical Advisory Group.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING March 18-3:00PM | ROOM 1E-113.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Construction Site Best Management Practices and the Project Design Process.
SIP Steering Committee Meeting March 29,  In October 2011, EPA issued draft SIP and modeling guidance related to the 1-hour SO2 standard issued.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
Air Quality Policy Division D P A Q PM 2.5 Final NSR Implementation Rule Nat’l Tribal Air Assoc. July 16, 2008.
Monterey Peninsula Water Management District 1 Confirm Scope of Work and Description for MPWMD ASR Project Item 13 April 18, 2005 Regular Meeting Staff.
ODOE Presentations and EFSC Standards Presented by Max Woods and Sarah Esterson September 18, 2015.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
Review of Postgraduate Taught Regulations Dr Nick Holland, Registry.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
MIG 2 - Water Quality and Quantity Study Plan Review April 2, 2008.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
1 Identify Preferred Alternative and Finalize Plan Planning Steps 7 & 8.
October 30, 2013 Community Wind Outreach Initiative: Best Practices for Siting Wind Energy Facilities Andrew Greene Siting Division Director, DPU.
CUTTING RED TAPE The Government is committed to cutting £10 billion of red tape To help deliver this Cutting Red Tape programme was launched in July Cutting.
Terrestrial Wind Regulation in the New Jersey Coastal Zone Ruth Ehinger Coastal Program Manager NJDEP.
National Public Health Performance Standards Local Assessment Instrument Essential Service:6 Enforce Laws and Regulations that Protect Health and Ensure.
Discussion And Request For Direction Relative To Strategic Directive 8.3 Regulation Reviews For Alternative Daily Cover And Food/Green Waste Composting.
Jamie Doucett MassDEP. What Problems Are We Solving? Current regulations are inadequate to address technologies other than recycling and composting Are.
Status Report On Staff Review Of Board Regulations For Alternative Daily Cover, Food And Green Waste Composting, Farm And Ranch Composting, Compostable.
Date Planning for Compliance with the Final 316(b) Phase II Regulations For APPA – March 8, 2004 David E. Bailey EPRIsolutions.
Responsibilities of Lead Agency Pages 7-8 of Training Guide 1. Preliminary review a) Determine if activity is a project as described by CEQA b) May require.
1 Draft Landfill Methane Control Measure California Air Resources Board April 22, 2008.
The Rezoning Process CHARLOTTE-MECKLENBURG PLANNING.
Napa County User Fee Study Board of Supervisors: Final Report Presentation May 12, 2009.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
2016 NSF Large Facilities Workshop New Initiatives Business Roundtable II-III May 25-26, 2016 Jeff Lupis, Division Director, Division of Acquisition and.
Climate: ANPR, SIPs and Section 821 WESTAR October 2, 2008.
Health Impact Assessment for Healthy Places: A Guide for Planning and Public Health Module 5: Reporting Goals: The goals of this step are to determine.
Michael Gross, Perry Williams, Carmen Sanchez
Water Efficiency Ordinance ZCA No. 750
Regulatory Strategies and Solutions Group, LLC
External Examiners day
Overview What is the CEQA environmental review process?
Revisions to the Concentration Averaging and Encapsulation Branch Technical Position A. Christianne Ridge Division of Decommissioning, Uranium Recovery,
Colorado state university-pueblo policy and administration (PA)
External Examiners Conference
Overview of Implementation and Local Decisions
Unified Approach to Stormwater Monitoring in Southern California
Reduction of total releases from unintentional production of POPs
UWE Bristol External Examiners day 27th January 2016
Draft CIS work programme
Presentation transcript:

7 March /24/20151

 MassDEP convened WNTAG to advise the Department on how to craft an effective regulatory & policy response to Wind Turbine noise impacts  Scope: ◦ Potential revision to existing noise policy ◦ Pre-construction impact assessment ◦ Pre-construction permitting process ◦ Post construction compliance sampling 2

 Approaches to Determining Compliance with Noise policy  Pre-Construction Permitting  Additional Recommendations  Next Steps 10/24/20153

 Retain the10 dBA above background limit  Approach For Discussion:  Leq + Adjustment Factor- L90 ≤ 10dBA ◦ Adjustment Factor to be determined (to be protective) ◦ Collect at least 15 minutes of data Turbine “On” and Turbine “Off” under comparable wind conditions ◦ “A’ Weighted sound collected on “Fast” setting 10/24/20154

 Alternative Raised: ◦ Collect 1 Second LAFmax withTurbine “On” and Turbine “Off” ◦ Compare L90 of 1 Second LAFmax Turbine “Off” to 1 second LAFmax Turbine “On” + Adjustment Factor ◦ Adjustment factor value tbd. ◦ Collect at least 15 min data Turbine “on” and Turbine “off” under comparable wind conditions 10/24/20155

 Permit Required ◦ 1 MW and greater ◦ Public review and comment  Self Certification ◦ 0.1 MW(100 kW) to MW ◦ Option to apply for permit  Conditions: ◦ Pre-construction impact evaluation (modeling). ◦ Demonstrate ability to comply with 10 dBA threshold ◦ Post-construction monitoring required 10/24/20156

 Attended sampling preferred/required. Input sought on how unattended sampling could be used for Leq data.  No specific limit on the amount of allowable amplitude modulation included; Adjustment Factor used to address modulation  More comprehensive guidance on pre and post construction sampling will be issued in addition to regulations.  Use of Preconstruction background data for post construction compliance determination. 10/24/20157

 All of the input from WNTAG to be considered as MassDEP drafts a new regulation and Technical Support Document  Some of the Technical Issues also informed by the final RWSTA Report (Spring/ Summer 2014)  MassDEP to draft and issue additional guidance on monitoring and modeling wind projects  Regulations will go out to public hearing and comments considered before final adoption. 10/24/20158