Noise & Air Quality NEPA Class September 2015 Office of Environmental Services Noel Alcala, PE, Noise and Air Quality Coordinator Noise & Air Quality NEPA.

Slides:



Advertisements
Similar presentations
SIP Development Process Overview For the Great Smoky Mountain National Park Transportation Partners Requirements, Scenarios and Timelines Laura Boothe,
Advertisements

Transportation Conformity Basics. What is Transportation Conformity? Transportation conformity (conformity) is a way to ensure that Federal funding and.
Environmental Planning
1 Noise/Air Quality Update 9/16/10 Consultant Update mtg.
New Source Review (NSR) Program Basics
1 SAFETEA-LU Changes to the Transportation Conformity Rule February 21, 2008.
NEW PROGRAMMATIC CATEGORICAL EXCLUSION AGREEMENT A WORK IN PROGRESS… ODOT—Office of Environmental Services Environmental Update Meeting20 November 2014.
Earth’s Changing Environment Lecture 3 Air Quality.
Southern Environmental Law Center Georgia Air Summit May 4, 2006.
Session 7: Other Conformity Rule Changes FHWA Transportation Conformity and CMAQ Workshop Summer 2004.
Transportation Conformity and Development of Emission Budgets.
Update: National Ambient Air Quality Standards Association of California Airports September 15, 2010 Phil DeVita.
EPA PM2.5 Modeling Guidance for Attainment Demonstrations Brian Timin EPA/OAQPS February 20, 2007.
Kansas City Air Quality, Emissions, and Strategies Douglas Watson Kansas Department of Health and Environment Bureau of Air and Radiation January 10, 2006.
1 How to Succeed in Statewide and MPO Transportation Planning.
Ohio Department of Transportation Office of Transit Urban Roundtable September 30,
Air Quality 101 FHWA Environmental Conference Air Quality Specialists: Mike Roberts Karen Perritt Emily Biondi June 16, 2008.
Transportation and Air Quality in the Treasure Valley.
Project Delivery and ODOT’s Air Program & Air Quality Updates Geo-Environmental Conference Presented by: Natalie Liljenwall, ODOT Air Quality April 22,
Defining Air Quality: The Standard-Setting Process Chapter 10.
Transportation & Air Quality Planning AMPO MPO Educational Series November 8,
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
UNLOCK THE MYSTERIES TO AIR QUALITY Bernadette Dupont, FHWA-KY June 2007.
2015 FTIP/FSTIP Workshop Transportation Conformity Wade Hobbs FHWA CADO January 15, 2014.
2012 FTIP/FSTIP Workshop Project Selection Process.
Air Quality Planning, Metro. Washington, DC-MD-VA Joan Rohlfs, Chief, Air Quality Planning Metropolitan Washington COG October 27, 2005.
Air Quality and Conformity Issues James M. Shrouds, Director Office of Natural and Human Environment Federal Highway Administration AASHTO SCOE Meeting.
Maryland’s Innovative Measures State Implementation Plan 2004 EPA Air Innovations Conference Brian J. Hug – Chief, Air Quality Policy and Planning Division.
© Jeffer, Mangels, Butler & Marmaro LLP 1 Programmatic New Source Review November 2, 2005 Malcolm C. Weiss Jeffer, Mangels, Butler & Marmaro LLP 1900 Avenue.
Air Pollution Solutions Ch. 18. How should we deal with air pollution? Legal, economic, and technical tools can help us to clean up air pollution, but.
Oil and Gas Workgroup Summary October 21-23, 2009 Denver.
Keeping Tomorrow’s Air Clean: Conforming Transportation Plans with Air Quality Attainment Efforts San Joaquin Valley Transportation Planning Agencies Kern.
L O N G B E A C H, C A. Dean McMath Regional Environmental Programs Manager FAA – Southwest Region NEPA Essentials Selected Special.
Energy Law, Fall 2010 Natashia Holmes
Presented to: By: Date: Federal Aviation Administration Environmental Best Practices Air Quality Issues 2010 Hershey Conference Maria Stanco, AEA Environmental.
Recent Developments in Transportation Conformity Beverly Chenausky Multimodal Planning Division – Air Quality Breakout Session: Transportation Conformity/Air.
Presentation for Air Quality Coalitions The 2015 Proposed Ozone Standard.
Transportation Conformity in North Carolina. Transportation Planning Framework Required by NCGS §136 ‑ In MPOs, includes 20 year fiscally constrained.
1 CAPCOA Health Impacts of Air Pollution on Communities September 19-20, : :35 Current Paradigms: Strengths and Limitations Source Category.
EPA’s DRAFT SIP and MODELING GUIDANCE Ian Cohen EPA Region 1 December 8, 2011.
Clean Air Act and New Source Review Permits EPA Office of Air Quality Planning and Standards Research Triangle Park NC March
Imperial County PM 10 SIP: Update Imperial County APCD SIP Workgroup Meeting September 24, 2008.
Final Clean Air Fine Particle Implementation Rule Briefing for NTAA EPA Office of Air Quality Planning and Standards April 17, 2007.
Missoula Air Quality Conformity Analysis Required by Federal and Montana Clean Air Act – Transportation-specific air quality requirements enacted in Federal.
Who Does What Susan Handy TTP282 October Players Government Industry Citizens/ Consumers.
State Implementation Plans Could Rule Your Life or why NAAQS Are Important Chuck Sams R9 Air Quality Program Manager.
Transportation Conformity Overview H-GAC Conformity Workshop May 30, 2007.
Clean Air Act SAFE 210. Purpose Protect public health and regulate air emissions Addresses both stationary and mobile sources.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
Environmental Protection Agency (EPA)  Founded by U.S. government (under Richard Nixon) in 1970  William Ruckleshaus was first EPA administrator  a.
Clean Air Act The law that defines EPA's responsibilities for protecting and improving the nation's air quality and the stratospheric ozone layer. Draft.
Keeping Our Air Clean Local and Regional Strategies to Improve Air Quality in Chittenden County Presentation to: CCMPO – February 17, 2010.
11 Programming José Luis Cáceres MTIP Team Manager SACOG
Western Regional Technical Air Quality Studies: support for Ozone and other Air Quality Planning in the West Tom Moore Air Quality Program Manager Western.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
November 15, Clean Air Act Framework National Ambient Air Quality Standards (NAAQS) set public health goals Planning process considers science,
Air Quality, Transportation Conformity, and the FSTIP FTIP/FSTIP Workshop February 9, 2016.
HANDOUT 2017 FSTIP Development Workshop Federal Statewide Transportation Improvement Program Requirements Wade Hobbs Federal Highway Administration California.
1 Mobile Sources Work Group Final Report - PM 2.5 SIP Brian Newbacher Dir. of Public Affairs, AAA Chair, Mobile Sources Work Group June 12, 2007 NOACA.
MEMORANDUM OF UNDERSTANDING PROCEDURES FOR REVISIONS STATEWIDE AND LOCAL TRANSPORTATION IMPROVEMENT PROGRAMS (STIP & TIP) State of Alabama Department.
TRANSPORTATION CONFORMITY OVERVIEW TRAINING 1. Training Objectives Understand the Following : – Why is air quality relevant to transportation? – What.
Environmental Quality Board May 16, 2007
TRANSPORTATION CONFORMITY
Transportation Improvement Program (TIP)
The Air Pollution Control Act of 1955
Clean Air Act (CAA) Purpose
Transportation Improvement Program and Air Quality Conformity Analysis
Overview of New Source Review (NSR)
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Uinta Basin General Conformity
Presentation transcript:

Noise & Air Quality NEPA Class September 2015 Office of Environmental Services Noel Alcala, PE, Noise and Air Quality Coordinator Noise & Air Quality NEPA Class September 2015 Office of Environmental Services Noel Alcala, PE, Noise and Air Quality Coordinator 1

Air Quality 2

Air Quality Regulations- Why do we do what we do?? Clean Air Act (CAA) of 1970 and protect and improve the nation’s air quality CAA requires development of State Implementation Plan (SIP) & requires fed actions to conform to SIP’s purpose SIP- Defines how States will comply with CAA and improve AQ (requires demonstration of “conformity”) Conformity- project must not cause new AQ violation, worsen existing violation, or delay timely attainment Attainment- meets or is cleaner than AQ standards (NAAQS) SIP explains the strategy for attaining/maintaining the NAAQS, reducing air pollution, AQ management program 3

4

What air quality episodes led to the CAA? A. Donora, PA B. Poza Rica, Mexico C. London D. New York & 1963 E. All of the above 5

Which human system is most directly affected by air pollution? A. Circulatory B. Digestive C. Respiratory D. Nervous E. All of the above are equally affected 6

The primary responsibility for enforcing the NAAQS belongs to who? A. States B. USEPA C. Congress D. FHWA E. All of the above 7

Air Quality Pollutants required to be addressed in your NEPA Document  Carbon Monoxide (CO)  Ozone (O3)  Particulate Matter (PM 2.5)  Mobile Source Air Toxics (MSAT)  O3 and PM apply to certain areas; MSAT applies statewide 8

Air Quality Guidances  USEPA/FHWA policies and guidance documents for PM2.5, MSAT analyses  ODOT Flow charts for PM2.5, MSATs, O3   AQ Webinars: data AQ Webinars: data  NHI Webcourses 9

Non-Attainment & Maintenance Geographic areas that require specific air pollution controls, analysis, programs, etc… Geographic areas that require specific air pollution controls, analysis, programs, etc… Nonattainment- worse than the NAAQS Nonattainment- worse than the NAAQS Maintenance- formerly in nonattainment and under a maintenance plan Maintenance- formerly in nonattainment and under a maintenance plan 10

Baseline Transportation Conformity Requirements for PM and O3  All projects must be listed in the State Transportation Improvement Program (STIP) and/or the Transportation Improvement Plan (TIP) (MPO list) for NEPA approval  See ODOT-OSPPM website for more details (STIP list, TIP list, STIP process)  Regional vs Project Level air quality requirements.  Regional/Planning level PM2.5 and O3 addressed in TIP. 11

12

Carbon Monoxide (CO) 13

CO Analysis Determination  Entire state of Ohio is now in attainment for CO since 3/5/14. CO is not an issue and no analysis is required. 14

Ozone 15

Ozone Confirmation  No requirement to perform project level analysis for ozone at this time  Verify that the project is in the STIP/TIP- NEPA document can not be approved unless in STIP/TIP  Verify project scope has not significantly changed  Include discussion in NEPA document- is project in Non-Attainment or maintenance for ozone? 16

17

Particulate Matter (PM) 18

PM 2.5  PM2.5- (soil, dust, vehicle emiss, smokestacks, etc) focus is on diesel trucks/emissions  Applies to nonattainment areas  Nonexempt projects with ADT>=125,000 and diesels>=8% AND from  Nonexempt projects with ADT>=125,000 and diesels>=8% AND there is a significant increase in the number of diesel trucks from DYNB to DYB  Estimation of future PM2.5 concentrations  12 ug/cubic m (annual; was 15ug/cubic m); 35 ug/cubic m (24 hr) thresholds  Dispersion modeling required- MOVES and AERMOD (AMS/EPA Reg Model)  Follow USEPA Quantitative PM2.5 Hotspot Guidance dated 12/12 and updated PM2.5 process flowchart 19

Dispersion modeling is the….. A. Measured distance of pollutant dispersion for a given source B. Method to estimate the ground level concentration of pollutants from a source C. Standard rate of pollutant dispersion at predetermined atmospheric conditions D. Method for regional AQ policymakers to reach an AQ goal E. None of the above 20

21

22

PM2.5 Project Categories Exempt Nonexempt and no hotspot analysis required Nonexempt and a hotspot analysis is required 23

Projects exempt from PM2.5 analysis  Projects could be exempt from PM2.5 analysis under 40CFR list of projects (i.e. intersection improvements, bridge replacements- no added capacity, pavement resurfacing/rehabilitation, etc) 24

Projects not exempt from PM2.5 analysis but do NOT require a PM2.5 Hot-spot analysis  These projects require coordination with OEPA, USEPA, FHWA- OES does this)   Informational items to be provided to OES for coordination are P&N, Project Description, project sponsor, FY for construction, verification that project is on STIP/TIP, existing and design year ADT and truck %, and aerial mapping showing the preferred alternative   For new auxiliary lane projects, <1 mile threshold 25

Projects not exempt AND require a PM2.5 Quantitative Hot-spot Analysis  When ADT>125,000 and diesels>8% AND e from  When ADT>125,000 and diesels>8% AND expansion of an existing highway that has a significant increase in the number of diesel trucks from DYNB to DYB  Follow USEPA PM2.5 Guidance Manual  Pre-coordination with agencies to discuss approach  Document coordination required with agencies  PI requirement- Provide Hot-spot analysis report on project’s website with comment period and make report available for review and comment at NEPA PI meeting 26

The primary mobile source of air pollution in the USA is what? A. Diesel trucks B. Automobiles C. Airplanes D. Lawn mowers E. Motorcycles 27

Mobile Source Air Toxics (MSATs) 28

MSATs  Required under FHWA Interim Guidance on Air Toxics Analysis in NEPA Documents (February 3, 2006, Sept memorandum, 12/6/12 update)  Priority Transportation Toxics- suspected cancer-causing pollutants from vehicles  Linked to heart disease and asthma  Statewide Implementation (all projects/counties)  Three levels of potential MSAT effects (No, low, higher)  Project types and prototype language provided for each level of analysis  Follow MSAT process flowchart 29

MSATs No Potential MSAT Effects  No sensitive land uses within approx 500’ of the project (homes, hospitals, churches, etc)- Identify in the Project Initiation Package  Exempt from analysis- NEPA exempt or CE C1 and possibly CE C2  Include prototype language (from FHWA/USEPA guidance doc- Appendix A) in NEPA document 30

MSATs Low Potential MSAT Effects  Requires “Qualitative” Analysis  Capacity adding project with <140,000 DYADT, new interchange, new road, relocates lanes closer to sensitive areas, expansion of intermodal center  Provide project info and traffic info- Vehicles mi travelled (VMT), % difference betw Ex and DYB  Required OEPA review and consultation  Discuss results in NEPA document 31

MSATs Higher Potential MSAT Effects  Requires “Quantitative” Analysis- are there meaningful differences in MSAT emissions between base case year, OYB, OYNB, DYB, DYNB  Confirm requirement with OES and agencies  Capacity adding projects with DYADT > 140,000  Requires air quality modeling  Required OEPA review and concurrence  Discuss results in NEPA document 32

Air Quality Requirements?- Example Projects 1. Project in DEL Cty with 145,000 DYADT is resurfacing and widening narrow pavements. What is required for PM2.5, MSAT? 2. Project in LOR Cty is a widening from 2-4 lanes. DYB ADT is 130,000 and truck % is 15%. DYNB truck % is 16%. What is required for PM2.5, MSAT? 3. Project in SUM Cty is replacing a bridge, no added thru lanes, DYB ADT is 200,000. What is required for PM2.5, MSAT? 4. Project in CUY Cty is adding capacity on IR77. Ex 2015 ADT is 150, DYB ADT is 180, DYB diesels are 30% DYNB diesels are 15%. What is required for PM2.5, MSAT? 33