Infrastructure for Reusable Vehicles The next generation of Space Travel Eric Jensen ASTE 527 Infrastructure for Reusable Vehicles The next generation.

Slides:



Advertisements
Similar presentations
Simulating Ground Support Capability for NASAs Reusable Launch Vehicle Program Kathryn E. Caggiano Peter L. Jackson John A. Muckstadt Cornell University.
Advertisements

Benedetto Marasa ENAC Deputy Director General 1. – Cooperation in the development of: Safety regulations Standards Licensing measures Projects of mutual.
21 st Century Model for Space Access Mark Bontrager Vice President, Spaceport Operations 10 December 2013.
Air Transportation System
GSFC/Wallops Flight Facility 1 Small Satellite Opportunities at Wallops Flight Facility Dr. John Campbell Director, Wallops Flight Facility.
Architecture Team Industry Day Briefing 17 January, 2002.
Goddard Space Flight Center 1 NASA Goddard Space Flight Center’s Wallops Flight Facility A View of Wallops Bill Wrobel Director, Wallops Flight Facility.
Federal Aviation Administration On-Orbit Debris Mitigation Methods for Upper Stages COMSTAC: Space Transportation Operations Working Group and Risk Management.
Larry Bell, Sasakawa International Center for Space Architecture (SICSA) Gerald D. Hines College of Architecture, University of Houston, Houston TX RUTGERS.
Space Florida The Next Ten Years in Florida Space Activities UCF 01 April 2014 Patrick McCarthy Space Florida.
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
Propulsion Engineering Research Center NASA Technology Roadmap: Launch Propulsion Systems Robert J. Santoro The Propulsion Engineering Research Center.
By Prof. Dr. Ram S. Jakhu, Panel Chair 8 TH ANNUAL MCGILL CONFERENCE ON INTERNATIONAL AVIATION LIABILITY & INSURANCE Montreal: 18 April 2015 INTRODUCTION.
COMSTAC Launch Operations Support Working Group October 24, 2006 Jim Ball Spaceport Development Manager NASA Kennedy Space Center Spaceport Development.
Space Travel. Last Night’s Homework 1A. Name three major features of the moon’s surface. Craters, maria, and highlands 1B. How did the moon’s craters.
Reducing the cost of sustained operations through technology infusion April 2004 Darin Skelly NASA Kennedy Space Center Transformational Spaceport & Range.
Launch System Launch Vehicle Launch Complex Orbit Insertion Orbit Maneuvers.
Commercial Spaceflight Companies Could this be your ticket to space? 200, Amt: Courtesy of Spaceport America Image credit Virgin Galactic.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Growth in commercial space program plans worldwide has introduced a variety of challenges: Unique space vehicle development and operationsUnique space.
ICRAT 2004 IMPACT OF FUTURE GENERATION AIRCRAFT IN AIRPORT OPERATIVITY
A3 Altitude Test Facility
Federal Aviation Administration 1 COE CST Research Road Mapping Workshop #2 August 16, 2011 Federal Aviation Administration Research Area 2: Space Transportation.
Presented to: By: Date: Federal Aviation Administration Office of Commercial Space Transportation Orbital Debris 10 June, 2015 Symposium for the Small.
Rocket-Setting: An architecture for point-to-point travel Seth A. McKeen 12/18/2012 University of Southern California ; Commercial Concept: Regional Rocket.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level Concept of Operations for Commercial.
Requirements and Operations Team Industry Day Briefing 17 January, 2002.
Florida Space Authority COMSTAC Launch Operations and Support Working Group May 23, 2006 Patrick McCarthy Manager, Spaceport Operations.
GSFC/Wallops Flight Facility 1 NASA/Goddard Space Flight Center’s Wallops Flight Facility Federal Laboratory Consortium January
Current Need Aging space shuttle fleet’s retirement is imminent If the ISS is going to continue operation there needs to be a replacement to get humans.
1 Commercial Crew Program The Next Step in U.S. Space Transportation Brent W. Jett October 11, 2012 Commercial Crew Program - Same Crew…New Ride.
Commercial Space: A New Frontier Dr. George C. Nield Deputy Associate Administrator for Commercial Space Transportation January 9, 2007 Federal Aviation.
2/27/021 Spaceport Vision Team Members. 2/27/022 Systems Definition Spaceport System Spaceport Stakeholder Needs High-Level Trade Study Performance Gaps.
Advanced Range Technology Working Group July 2002 Contact information: Kevin Brown Vice President, Business Development Command and Control Technologies.
Mario Busacca KSC Spaceport Planning Office March 2014 Transforming to a Multi User Spaceport.
Relating ICAO Annex 14 to AERODROME OPERATIONS
1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.
1 Federal Aviation Administration COE CST Research Road Mapping Workshop #2 August 16, 2011 Research 1 Hierarchy 1 Space Traffic Management and Operations.
SVDM ConOps 18 May 2010 Federal Aviation Administration 0 0 Space Vehicle Debris Threat Management ConOps Presentation to COMSTAC Space Transportation.
5/9/02 1 Spaceport Vision Team Members Organizations that contributed: Federal Government DoD DoC DoT NASA State Government NCSS Industry University Detailed.
Mars Today 1 An immediate and inexpensive program for manned Mars visitation.
03/11/021 Spaceport Vision Team Members. 03/11/022 Systems Definition Spaceport System Spaceport Stakeholder Needs High-Level Trade Study Performance.
Lecture 9: Ecological Factors & Aircraft Performance AIRCRAFT WEIGHT & PERFORMANCE.
CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH COLLABORATIVE DECISION MAKING (CDM) Testimony before the National Civil Aviation Review Commission Testimony.
A room with a view like never before The USC UNIVERSAL SPACE CRUISER Mandy Cordova ASTE 527.
Universal Chassis for Modular Ground Vehicles University of Michigan Mars Rover Team Presented by Eric Nytko August 6, 2005 The 2 nd Mars Expedition Planning.
Unit 6 Lesson 1 Explanation. In 2004, President Bush set the following goal for the NASA constellation program, “this vision… is a sustainable and affordable.
COMSTAC STOWG Commercial Aerospaceports Licensing and Development.
Federal Aviation Administration 1 FAA AST Overview Presentation Federal Aviation Administration Overview of the Federal Aviation Administration.
Florida Space Transportation Infrastructure Planning Mark Bontrager Vice President, Spaceport Operations.
COMSTAC Launch Operations Support Working Group May 17, 2007 Jim Ball Spaceport Development Manager NASA Kennedy Space Center Kennedy Space Center Spaceport.
Office of Space Flight Spaceport and Range Technology Development Initiative Al Sofge NASA Headquarters May 15, 2001.
Rockets & Rocketry. Rocket A rocket is a type of engine that pushes itself forward or upward by producing thrust. Unlike a jet engine, which draws in.
ASTWG Vision Team Group Exercise: Initial Summary of Results.
Federal Aviation Administration Federal Aviation Administration The Regulatory Role of the Federal Aviation Administration in Space Transportation With.
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
The Spaceport Enterprise Defining and Developing the Concept Kevin Brown Command and Control Technologies Corp. Advanced Spaceport Technology Working Group.
A Technology Partnership for the New Millennium Anne Harlan, Director William J. Hughes Technical Center 68th NASAO Annual Convention September 20, 1999.
Federal Aviation Administration 1 FAA AST Presentation at ESIL-1 October 26, 2011 List of Recent Papers 2011 Overview of the FAA Center of Excellence for.
03/20/021 Spaceport Vision Team Members Organizations that contributed: Air Force NASA NCSS FAA Industry University Etc.
Launch Structure Challenge - Background Humans landed on the moon in 1969 – Apollo 11 space flight. In 2003, NASA started a new program (Ares) to send.
February 25, 2014 Federal Military Construction and Base Support Conference.
Millennium Engineering and Integration Company A NEW DOCUMENTATION PROCESS TO STREAMLINE RANGE SAFETY PROCEDURES 0 O. “Rusty” Powell, Allan Smith, Jeff.
Commercial Space Transportation
Spaceports – Emerging Business Models
Briefing for Oklahoma Airport Operators Association
Ares I System Requirements Review (SRR)
LAUNCH VEHICLES.
Founded by Mike Irvine and Ryan Reese
Division Chief, Spaceport Management & Integration
Presentation transcript:

Infrastructure for Reusable Vehicles The next generation of Space Travel Eric Jensen ASTE 527 Infrastructure for Reusable Vehicles The next generation of Space Travel Eric Jensen ASTE 527 1

ASTE 527 | The Future of ISS | Ground Support Infrastructure 2 Background  Large, existing government-owned launch sites Can they help usher in new methods of efficient access to LEO?  Surpassing antiquated launch support methods Commercialization –Retain lessons learned, safe practices –Assisted air-launch –Conventional vertical rocket launch  Shaping 21 st century public image

ASTE 527 | The Future of ISS | Ground Support Infrastructure 3 Assumptions  Earth-based launch/landing locations Accommodate increased transatmospheric traffic  Impending commercial space travel needs Development of launch facilities New generation of vehicles –Global collaborative network –Streamlined processes –Minimization of costs  Utilize existing infrastructure where applicable Worldwide vertical launch locations Airport locations

ASTE 527 | The Future of ISS | Ground Support Infrastructure 4 Concept Architecture  Horizontal Launch/Landing Minimally invasive revisions to current airports –Primarily support horizontal and air launch –Designated landing-only airports Less modification Develop new spaceports specifically designed for commercial space travel  Vertical Launch Utilize existing facilities –Develop spacecraft to adapt to infrastructure –Enhance global collaboration, opening launch sites to both commercial and government use Accommodate reusability –Install common refurbishment facilities at current vertical launch sites Allowing rapid turn-around time for spacecraft

ASTE 527 | The Future of ISS | Ground Support Infrastructure 5 Horizontal Launch Sites  Existing runways at international hubs Air-launch capabilities –Inject heavy payloads to orbit by flying them into launch windows (50,000ft) Infrastructure already in place to support flight Global network of locations Accommodate landers with minimal development Public identifies with/has access to existing locations –Prominent Media and PR support  Perceived high-level modifications Runway parameters (typical for transatmospheric vehicles) –15,000’ long with 1,000’ runoff at both ends –400’ wide –Robust surface to cope with LV landing weight On-site final assembly and propellant integration

ASTE 527 | The Future of ISS | Ground Support Infrastructure 6 Airports of the World, or Potential Launch Sites?

ASTE 527 | The Future of ISS | Ground Support Infrastructure 7 Vertical Launch Sites  Accommodate existing ELV systems, as well as developing RLV technology  Vertical Launch/Landing Large facility needed to accommodate vehicle assembly and integration Basic design common to most launch locations Shuttle Landing Runway VAB Launch Pads Russia (Kazakstan)Baikonur space center/Tyuratam45.6 o N USACape CanaveralCape Canaveral/KSC, Eastern Test Range (ETR)KSC, Eastern Test Range (ETR)28.5 o N USAVandenberg AFB, Western Test Range (WTR)34.4 o N USAWallops Flight Facility, Wallops Island37.8 o N USAEdwards AFB, Air Force Flight Test Center35 o N FranceKourou, Guiana Space Centre5.2 o N FranceHammaguir31.0 o N JapanTanegashima Space Center (TNSC)30.4 o N JapanUchinoura Space Center (USC)31.2 o N ChinaJiuquan40.6 o N ChinaXichang28.25 o N ChinaTaiyuan/Wuzhai37.5 o N ItalySan Marco platform2.9 o S IndiaSriharikota (SHAR)13.9 o N IsraelPalmachim/Yavne31.5 o N AustraliaWoomera31.1 o S BrazilAlcantara2.3 o S SpainTorrejon AB40.5 o N

ASTE 527 | The Future of ISS | Ground Support Infrastructure 8 Limitations  Safety concerns New regulations must be drafted for commercial use of government launch sites Populated areas surrounding airports –Launch abort cases –Blast radius for stored propellant Safety measures can be developed as they were for Jet-A  Modification costs, complexity Airport launch sites to contend with: –Launch noise –Mass of landers and launch vehicles –Support facilities for hazardous fuel and gases –Launch pad structure for vertical launch, if applicable –Crew accommodations  Air traffic Horizontally and vertically launched LEO vehicles coinciding with nominal airport traffic

ASTE 527 | The Future of ISS | Ground Support Infrastructure 9 Forward Work  Global Collaboration FAA, ICAO, others –Collectively develop new standards that do not limit commercial travel, but retain safety and high standards –Impact of transatmospheric traffic on world airways  Cost analysis of typical airport modification  Pursue commonality in launch facility layouts Accommodate multiple LV configurations

ASTE 527 | The Future of ISS | Ground Support Infrastructure 10  International Civil Aviation Organization  Space Tourism – A New Field for Space Law Derek Weber, Director, Spaceport Associates   References