ATML Status Oct 2005 An overview of the ATML activity in the ATML focus group and as part of the IEEE SCC20 sub-committee.

Slides:



Advertisements
Similar presentations
ATML Completion Status – What Happens Next
Advertisements

ATML Readiness For Use Phase II. Phase II Readiness For Use The ATML: Phase II will build on the Core phases, adding additional ATML components and features.
Page1 Framework Working Group 2007 ATML Use cases Use of ATML by external agencies is gathering momentum.
Doc.: IEEE 802.EC-10/xxxxr0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Date: Authors:
1 UK MOD Policy and ATML Malcolm Brown UK MoD Support Policy Team Automatic Test Systems AutoTestCon Orlando Florida Sept 2010.
Doc.: IEEE /0275r1 Submission March 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report March 2008 Date: Authors:
Doc.: IEEE /0778r0 Report June 2014 Dorothy Stanley (Aruba Networks) Slide 1 P802.11REVmc Status and Overview Date: Authors:
ATS Framework Working Group Overview and Status Mike Malesich 13 March 2006.
PLANNING RSTWG Review of Planning Concept of Operations & Requirements Tasks.
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
IEEE-LTSC MPEG Overview Martha Nalebuff Director of Policy & Strategy Content Security Business Unit.
Realizing Green ICT Dream with TTA WiMAX Forum and Status - For information - LIM, Euntaek CJK IMT 28 Xi’an (西安), China June.
TitleIEEE Standard for Mostly RESTful Orchestration Interface Protocol (mREST) for Orchestrating Software-Controlled Assets via Web Services ScopeThe mREST.
Standards Coordinating Committee 20 on Test and Diagnosis for Electronic Systems Slide 1 SCC20 Liaison Report Dr. John W. Sheppard CS SAB Meeting November.
Standards Coordinating Committee 20 on Test and Diagnosis for Electronic Systems Slide 1 SCC20 Liaison Report Dr. John W. Sheppard CS SAB Meeting November.
0 HITSP Technical Committee 2008 Project Plans September 7, 2008 V1 HITSP Project Document Production Schedules Timeline Overview 2008 Use Case Detail.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
E-Government Initiative Geospatial Information One-Stop FGDC Coordination Group December 4, 2001 John Moeller.
Doc.: IEEE /288r0 Submission July 2001May 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
1 Chairs Report The IEC TC93 Meetings were held September 6-7, in Seoul, South Korea. The Standards Board Meetings were held September 8-10 also in Seoul,
DOT Implementing the Surface Transportation Domain Daniel Morgan 26 October 2015.
Standards Coordinating Committee 20 on Test and Diagnosis for Electronic Systems Slide 1 SCC20 Liaison Report Dr. John W. Sheppard May
IEEE Std P1671 (ATML Overview and Architecture) Status and Review Mike Seavey October 2009.
OL ILDLOEM BIT/Integrated Diagnostics Test / Maintenance Feedback ARGCS ACTD CONOPS Weapon System ECP Data flow Coalition Team Concept Wide.
ATML Test Description Orlando, FL January ATML Test Description2 September 2006 Agenda Status Feedback from Candidate evaluation Review standard.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
E-Government Initiative Geospatial Information One-Stop FGDC Coordination Group January 10, 2002 John Moeller.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #26, Jacksonville Closing Plenary Date Submitted: Jan, 2008 Presented.
ATML Status Jan 2006 Issue 6 An overview of the ATML activity in the ATML focus group and as part of the IEEE SCC20 sub-committee.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Melbourne Closing Plenary Date Submitted: September, 2006 Presented at.
1 ATML and IEEE SCC20: IEEE Patent Slideset, Standardization Status, & 2009 Meeting Schedule M. Seavey January 2009.
1 Session # n GRIDMAN TG Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE n-11/0020 Date Submitted:
Project Parkway Timeline to 2011 April 1, 2010 Town Hall Meeting Steering Committee Schools February 2009 May 18, 2009 Project Parkway Community Kick-
Standards Coordinating Committee 20 on Test and Diagnosis for Electronic Systems Slide 1 SCC20 Liaison Report Dr. John W. Sheppard CS SAB Meeting June.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
SAB Status Report Paul Eastman Chair, SAB Special Projects 3 June 2015.
Doc.: IEEE /0085r1 Submission June 2010 Tuncer Baykas, NICTSlide TG1 and System Design Document Notice: This document has been prepared.
Page 1 Enterprise Data Warehouse Project Executive: Barbara Chmielewski Project Manager: Anita Sharma.
IPDA Registry Definitions Project Dan Crichton Pedro Osuna Alain Sarkissian.
1 ATML Status January 2008 Issue 14 An overview of the ATML activity in the ATML focus group and as part of the IEEE SCC20 sub-committees.
ATML Status January 2007 Issue 9
IEEE TGa Project Timeline
IEEE SCC20 Standards Status
September 14, 2010 Mukund Modi NAVAIR Kevin Masur Joe Stanco
ATML Status April 2006 Issue 7
ATML Status April 2008 Issue 15
IEEE SCC20 Standards Status
Sub-1 GHz Study Group Closing Report Sept 2018
Proposal for TGad Selection Procedure and Timeline
ATML Status July 2007 Issue 11 An overview of the ATML activity in the ATML focus group and as part of the IEEE SCC20 sub-committees.
ATML ATML’s mission is to define a collection of XML-based schemas and services that allows ATE and test information to be exchanged in a common format.
Yearly Maintenance Process (for existing messages)
July 2014 doc.: IEEE /3/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
IEEE Working Group on Mobile Broadband Wireless Access
Use of ATML in Navy ATS.
Portfolio Management Process & Customer Request Management
TGn Overview Portland, Oregon, US July 2004
IEEE MEDIA INDEPENDENT HANDOVER
TGac Status and Timeline
ATML #17 IEEE SCC20 DMC & TII Jan 2006 Plenary
IEEE SGa Project Timeline
IEEE P Wireless RANs Date:
IEEE Revision Timeline
September 2009 Closing Report
November 2010 Closing Report
IEEE WG: P Status Review
TGn Closing Report – September 24 ‘09
Lockheed Martin ATML Experiences
Calendar Overview – Phase I – REVISED April 2019
July 2009 Closing Report Date: Authors: July 2009
Presentation transcript:

ATML Status Oct 2005 An overview of the ATML activity in the ATML focus group and as part of the IEEE SCC20 sub-committee

ATML ATML’s mission is to define a collection of XML-based schemas that allows ATE and test information to be exchanged in a common format adhering to the XML standard ATML defines a framework through which different architectures using XML can be implemented. defines the components from which users can build their architectures, whilst being interoperable with other compliant architectures. Show examples of the net centric services by which this information can be exchanged across different ATS platforms as part of a maintenance process defines the XML format that these elements will take. The ATML specifications will define: How to define XML schemas that represent ATE and test information A set of XML schemas supporting the exchange of specific ATE and test information Example services that can be used for exchanging ATE and test information in a distributed net-centric environment. A set of services supporting the exchange of specific ATE and test information in specific common areas.

ATML Framework Instrument Description Test Station (1671.2) Test Adaptor Diagnostics (1232) UUT Description (1671.3) Test Configuration Test Description (1671.1) SIMICA 1632 Started Test Results (1632.1) Drafts 1 Reviewed Draft Candidate

SCC20 & ATML Organisations The IEEE SCC20 is the standards organisation through which the ATML components (Documents) will be published under various IEEE standards. The ATML organisation is an open, independent focus group contributed to by the ATE industry and government agencies to advance the common exchange of test information through the use of XML. The ATML group provides draft schemas and associated documents, examples, use cases, requirements and trials any ATML components Their findings are submitted to the various SCC20 sub-committees and working groups to advance the IEEE standards associated with the ATML components

SCC-20 ATML PARs Status Project Authorisation Request (PAR) need to be approved by the IEEE NESCOM prior to any SCC-20 working group being established. ATML Framework PAR 1671 Approved Diagnostics PAR 1232 Existing Test Results PAR 1636.1 Approved Test Description PAR 1641.1 Approved Instrument Description PAR 1641.2 Approved UUT Description – PAR Review Approved Steering Test Configuration - PAR Review April 2006 Test Station &Test Adapter - PAR Review April 2006

ATML Objectives & Goals To have the P1671 standard written, reviewed and a ballot called by mid-2006, in order to be in a position to submit as a standard by Q4 2006 To have Candidate Schemas available by End ‘05 for Test Results Instrument Description Diagnostics (AI-ESTATE 1232) To have Draft Schemas available by End ‘05 and Candidate schemas for early ‘06 Test Description UUT Description To have Draft Schemas available by Early ‘06 and candidate schemas for end of ‘06 Test Adaptor Test Station Test Configuration SIMICA (Joe’s work)

ATML/IEEE Schedule (TII) TII Sub-committee Operating Instructions (April 2005) √ ATML Framework 1671 (Chris Gorringe/Mike Seavey) IEEE Par Approved (Nov 2004) √ ATML Framework Draft (Review April 2005) √ ATML Framework Requirements (Review April 2005) √ ATML Framework Draft Document (H) (Oct 2005) √ ATML Framework Ballot (May 2006) UUT Description (John Ralph) Requirements (April 2005) √ Draft Schema (Review June 2005) √ Draft 2 Schema review (October 2005) Ballot Date (2007) Test Configuration (Tim Davis) Start (April 2005) √ Requirements (July 2005) √ Draft Schema (Review Oct 2006) √ Ballot date (2008) Capability (Dan Pleasant) Requirements (Sept 2005) √

ATML Schedule (DMC) Diagnostics (Tim Wilmering) AI-Estate Amendment (Dec 05) (a) AI-ESTATE (1232) is working on an update to the -2002 published standard. The PAR has not yet been approved by the IEEE-SA (it missed the deadline for the Standards board meeting). P1636 SIMICA Draft (April 2006) (Joe Stanco) (b) SIMICA is working to get to an initial Ballot. Diagnostic Candidate (Jan 2006) Ballot (Jan 2007) Test Results 1636.1 (John Ralph?) ATML Candidate (Dec 2004) √ PAR Approved (Mar 2005) √ DMC Requirements Document (Review April 2005) √ 1636.1 Draft (Review April 2005) √ Draft 2 posted with DMC (Oct 2006) √ Test Results Ballot (Jan 2006)

ATML Schedule TAD Test Description P1671.1 (Ion Neag) Draft Schema review (Oct 2005) The spec is developed by Mike Seavey and Ion They handle separate sections that we will merge when creating the Draft version. Candidate Schema (Jan 2006) PAR (Oct 2005) √ Ballot Date (Jan 2007) Instrument Description P1671.2 (Teresa Lopes) Draft Schema review (July 2005)√ Ballot Date (May 2007) Test Station & Test Adapter (Tamara Einspanjer Start (April 2005) √ Requirements (July 2005) √ Draft Schema (Oct 2006) Ballot date (2008)

ATML Meeting Schedule Bi-Weekly Teleconferences 4 Meetings a year plus additional break-out working group as necessary Synchronise with SCC20/01 meetings Oct 25-27th Austin Tx (NI) Jan 17-19th Orlando (LM) April/May SCC20 Madrid (Indra?) July/Aug TBD ATC2006 Anaheim – SCC20, TII Management Only Oct/Nov TBD