1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.

Slides:



Advertisements
Similar presentations
The Control System for the ATLAS Pixel Detector
Advertisements

1 Alan Barr, UCL Fixed Frequency Trigger Veto The problem: –Currents in wire bonds in presence of strong magnetic fields –DC current not a problem (small.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
Far Detector Data Quality Andy Blake Cambridge University.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
SctRodDaq CGL. The ASICs are called “ABCD”s Where the tests come in.
1 August 2000ATLAS SCT and Pixel Off-Detector PDR 1 SCT ROD Crate DAQ Status and Schedule John Hill University of Cambridge.
DAQ Online Software Migration “December Status” Chris Lester (and John Hill at short notice!) I would like to thank those at CERN, Birmingham, Oxford and.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
CAL DQM SHIFT TODO and RELATED MATERIAL T. Schörner-Sadenius Hamburg University CAL Meeting, 13 October 2004.
Data Quality Monitoring of the CMS Tracker
Designing a HEP Experiment Control System, Lessons to be Learned From 10 Years Evolution and Operation of the DELPHI Experiment. André Augustinus 8 February.
BOE/BME – MDT: DCS For the 2 BOE, DCS needs to handle 2 x 2 HV (1 ch/multilayer) 2x LV 2x JTAG, associated 2 MDMs/ELMBs Monitoring of T, B and CSM sensors.
Peter W. PhillipsSCT/Pixel RODDAQ workshop, UCL, July 2002 SCT Needs for Full User Evaluation Peter W Phillips Rutherford Appleton Laboratory.
Web Based Monitoring DT online shifter tutorial Jesús Puerta-Pelayo CIEMAT Muon_Barrel_Workshop_07/July/10.
Group Electronique Csnsm AGATA SLOW CONTROL MEETING 19th fev AGATA PROJECT PREPROCESSING MEZZANINE SLOW CONTROL GUI FOR THE SEGMENT AND THE CORE.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Cosmic tests and Performance of the ATLAS Semi-Conductor Tracker Barrels Bilge Demirköz Oxford University On behalf of the ATLAS SCT Collaboration.
25-May-03 jadzia warchol, ext. 8341, phone Calibration of FPD detector Content Page General2 Calibration 3 Taking data (Calibration or Pedestal.
CMS pixel data quality monitoring Petra Merkel, Purdue University For the CMS Pixel DQM Group Vertex 2008, Sweden.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
U.S. ATLAS Executive Committee August 3, 2005 U.S. ATLAS TDAQ FY06 M&O Planning A.J. Lankford UC Irvine.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
SCT Bytestream Hacking Bruce Gallop RAL High mu upgrade - 16 th May 2012.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Peter W. PhillipsATLAS SCT Week, CERN, September/October 2002 Electrical Tests of SCT modules using RODs Peter W Phillips Rutherford Appleton Laboratory.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
XTRP Software Nathan Eddy University of Illinois 2/24/00.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
MCast Errors and HV Adjustments Multicast Errors (seen on the DATA ERIS connection) have caused a disruption of a HV Adjustment due to a timeout (since.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
ID Week 13 th of October 2014 Per Johansson Sheffield University.
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ at SR1 HEP Cosmics setup Running modes Problems Future.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
SCT Links Operation Performance from QA and operation
University of Wisconsin at Madison
904 Status Recall last Group Meeting…
Srećko Morović Institute Ruđer Bošković
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
DAQ for ATLAS SCT macro-assembly
Experience with DAQ for ATLAS SCT
fields of possible improvement
EUDAQ Status Report Emlyn Corrin, 29 September 2010
Level 1 (Calo) Databases
Level-1 Calo Monitoring
CMS Pixel Data Quality Monitoring
Presentation transcript:

1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation Transitions Recovery Modifying configurations What to do better?

2 4 July 2006 Alan Barr - SCT DAQ The good news!

3 4 July 2006 Alan Barr - SCT DAQ Overview Almost all things were possible with enough expert hands at the wheel Focus is on what could be improved to make life easier, and to reduce down- time

4 4 July 2006 Alan Barr - SCT DAQ Setting things up Various mapping scans now in place: streamline checking for mapping errors –TX  RX (autoconfig) –TX  Module (Trim -> TV50 RMS) –RX  DCS (Hard reset scan) Perhaps a case for a 1-Pt QCAL scan test at “physics threshold” – look at trim? Opto tuning – improvements to algorithms –Hard reset between bins for TX current –Rx Threshold algorithm improved –Still some worries over marginal TX.

5 4 July 2006 Alan Barr - SCT DAQ Timing-in Good to ~few ns gross timing done by looking for top/bottom of module co- incidence –Combining statistics between modules –Relatively few stats required (few hundred cosmics) –Good agreement with “offline monitoring” Module  module done by dead reckoning (at SR1)

6 4 July 2006 Alan Barr - SCT DAQ Mark/Space Ratio (Clock jitter in TX) Test done for several rods in SR1 sector – enough stats to test algorithm Generally seems to work –Slow –Some funny channels –Investigations into BOC plugins proceeding Some improvements in algorithm made to attempt to flag outlying cases

7 4 July 2006 Alan Barr - SCT DAQ Calibration mode Can “do the job” –New response curve taken and used for SR1 cosmics tests Less fault tolerant to errors from modules –Still aborts after single module failure –To be improved? Would benefit from tools to do statistics on different modules –Nasty fudge used to combine data for timing scan –Need to be able to compare against reference set rather than just labelling “good”/”bad” modules

8 4 July 2006 Alan Barr - SCT DAQ Things to speed up calibration? Diagnostics from DSP greatly improved –Pick out which modules are causing problems Improved fault tolerance? –Decrease wasted down-time. Has histogram read-out slowed down? –If so where? ROD? Network? NFS demon? Quick turn-around with updated configuration (see later) Could pack trims better to reduce configuration loading to ROD by factor of ~2. –Simultaneous change needed to DSP code and to SctRodDaq

9 4 July 2006 Alan Barr - SCT DAQ Physics mode Standard operation of SCT HW/SW eventually good Couldn’t read out histograms during physics mode when running –And slow when paused Runs able to continue for several hours. What stopped “good” runs? –Crash of ROS/FILAR Formatter allowing “illegal” data through? –LV trips from SCT modules Reduce frequency Recover –Occasionally loss of synchronisation with TRT? Identify Add counter resets

10 4 July 2006 Alan Barr - SCT DAQ Non-expert operation? Work to be done in: –Detector safety (DCS) –Module initialisation –Module recovery –Information in error messages –Getting configurations to offline –Feedback on synchronisation –Other “error” states Recovery time after power failure was I think ~ 8 hours?

11 4 July 2006 Alan Barr - SCT DAQ Transitions Physics  Calibration transition ok for SCT alone Cal. couldn’t be done in configuration containing TRT Taking out subdetector involved lots of different resources (EventBuilder, ROS, RODs, …) I thinkTDAQ has a way to streamline this?

12 4 July 2006 Alan Barr - SCT DAQ Configuration tools SR1 highlighted the need for tools to compare, update and merge configurations. Chris and Bruce produced/working on some tools for xml. ‘Final’ database configuration solution now has same functionality as xml. GUI display of configuration parameters?

13 4 July 2006 Alan Barr - SCT DAQ Headaches ROS machine failure –Required reboot, remount, … –Possibly linked to invalid data coming from ROD –Some ideas as to what might be the cause… Occasional initialisation problems in SctRodDaq start-up –Not really investigated – replace delays in synch-init? “Full” ROD (inc. s-link) reset seems to require crate reboot (slow!) –What isn’t reset on “reset”? Module start up needs Hard Reset, and then send configs automated. –Problem: DCS hand-shaking Automation of module power cycle required (from DAQ)

14 4 July 2006 Alan Barr - SCT DAQ Issues for the pit Configuration (inc. DCS) still a big area First large-scale multi-crate test Parallelism needed for analysis Much harder to reset off-detector hardware! Auto recovery required for –Modules –OPTO –DAQ systems Can we still use NFS for data transfer? Auto-archival to CASTOR through firewall? Set up of trigger chain (resets etc) through LTPs. ROD monitoring not physics-ready

15 4 July 2006 Alan Barr - SCT DAQ If things don’t work Don’t just grumble to yourself… Grumble to the experts! –Wiki page: – bin/wiki.cgi/UserStorieshttp:// bin/wiki.cgi/UserStories – address: We rarely bite and will endeavour to help!

16 4 July 2006 Alan Barr - SCT DAQ The good news!