STATUS OF THE DAMAGES CAUSED DUE TO TORRENTIAL RAIN/FLASH FLOOD DURING THE IST WEEK OF SEPTEMBER 2014
1. Area : 4500 Sq. KMs 2.Population (As per Census 2011) : 4,09, No. of households : Sex Ratio : 922/ Literacy Rate : % 6.No of Revenue villages : No. of Sub-Divisions : 04 8.Tehsils : 16 9.No. of CD Blocks : 17 District Profile
Sl. No. DesignationAs per SOP 1ADDCChairman 2AC(R)Member 3Executive Engineer (R&B) ConcernedMember 4Tehsildar ConcernedMember Co-opted Members 1Sub Divisional Magistrates ConcernedCo-opted Member 2SHO ConcernedCo-opted Member Committee regarding assesment of Damages to the Private Property (Immovable):-
Sl. No. DesignationAs per SOP 1ADDCChairman 2Chief Animal Husbandry OfficerMember 3Distt. Sheep Husbandry OfficerMember 4Tehsildar ConcernedMember Co-opted Members 1AC (R)Co-opted Member 2 Sub Divisional Magistrates Concerned Co-opted Member 3SHO ConcernedCo-opted Member Committee regarding assessment of Loss of Milch Animals/ Draught Animals:-
Sl. No. DesignationAs per SOP 1ADCChairman 2Chief Agriculture OfficerMember 3Distt. Horticulture OfficerMember 4Tehsildar ConcernedMember Co-opted Members 1AC (R)Co-opted Member 2Chief Horticulture OfficerCo-opted Member 3Sub Divisional Magistrates Concerned Co-opted Member
Sl. No. DesignationAs per SOP 1ADDCChairman 2Superintending Engineer (R&B)Member 3Superintending Engineer (Hyd))Member 4Superintending Engineer (EM&RE)Member 5Superintending Engineer (PMGSY)Member 6Chief Planning OfficerCo-opted Member 7Executive Engineer (R&B) ConcernedMember 8Executive Engineer (PMGSY) ConcernedMember 9Executive Engineer (EM&RE) ConcernedMember 10Executive Engineer (PHE) ConcernedMember 11Executive Engineer (I&FC) ConcernedMember 12 Executive Engineer (REW) ConcernedMember 13 Executive Engineer (STD) ConcernedMember 14 Executive Engineer (BDA) ConcernedMember 15 Executive Engineer (ULB) ConcernedMember 16 Tehsildar ConcernedMember 17 Co-opted Members 18 Asstt. Commissioner (Dev)Co-opted Member 19 AC (R)Co-opted Member 20 Sub Divisional Magistrates ConcernedCo-opted Member Committee regarding assessment of damages caused to Public infrastructure:-
Sl. No.Designation 1ADCChairman 2AC(R)Member 3Chief Medical OfficerMember 4BMOs ConcernedMember 5DSP (HQ)Member 4Tehsildar ConcernedMember Co-opted Members 1Sub Divisional Magistrates ConcernedCo-opted Members 2SHO ConcernedCo-opted Members Committee regarding verification of Human loss/ injuries
Tehsil-wise amount paid for Severely/Partially damaged Pacca Houses S. NoTehsilFully damagedSeverely damagedPartially damaged No.AmountNo.Amount 1Assar Bhagwah Kastigarh Doda Bharat Marmat Mohalla Gundna Thathri Kahra Phigsoo Chiralla Gandoh Chilly Pingal Bhaderwah Bhalla Total;
Tehsil-wise amount paid to Damaged Kaccha Houses S. NoTehsilFully damagedSeverely damagedPartially damaged No.AmountNo.AmountNo.Amount 1 Assar Bhagwah Kastigarh Doda Bharat Marmat Mohalla Gundna Thathri Kahra Phigsoo Chiralla Gandoh Chilly Pingal Bhaderwah Bhalla Total;
Tehsil-wise amount paid to Damaged (CATTLE SHEDS) S. NoTehsilCattle Sheds damaged No.Amount Paid 1Assar Bhagwah Kastigarh Doda Bharat Marmat Mohalla Gundna Thathri Kahra Phigsoo Chiralla Gandoh00 14Chilly Pingal Bhaderwah Bhalla Total;
Details of Damages caused to Human Life/ Live Stock/ Cattles. S NoTehsilEx-gratia paid in death cases Ex-gratia paid in Injured cases Ex-gratia paid for cattle losses Ex-gratia paid for Sheep/Goat Losses. No.AmountNo.AmountNo.AmountNo.Amount 1Assar Bhagwah Kastigarh Doda Bharat Marmat Mohalla Gundna Thathri Kahra Phigsoo Chiralla Gandoh Chilly Pingal Bhaderwah Bhalla Total;
STATUS OF UTILIZATION OF FUNDS UNDER SDRF IN RESPECT OF DISTRICT DODA S. No Funds received (Rs. In lakhs) Funds disbursed for paymentb of Ex-Gratia Funds released for temporary restoration of public infrastructure Grand Total Additional requiremen t of funds Human Deaths Human Injuries Kacha Houses Pacca Houses Cattle Shed Cattle loss TotalPWDPHEI&FCPDDTotal Total Availability = Rs lacs Funds released to the executing agency = Rs lacs Funds available with this office as on date = Rs lacs Funds utilized so far = Rs lacs
S. N O: SectorNature of damages Total damages to the public utilities. Funds projected for permanent restoration of public utilities Funds projected by Deptt. for temporary restoration. Amount recommended by SOP committee 01R&BDamages to the roads and Bridges PMGSYDamages to the roads PHEDamages to the water supply schemes PowerDamages to the sub stations/ conductor length, towers IrrigationDamages to the Khuls Flood Control Flood protection works EducationDamages to the school buildings/ kitchen sheds, R/Walls, B/Walls, toilets Health.Damages to the health institutions/buildings Rural Dev. Deptt Damages to the CD works and buildings FisheriesDamages to the Channels Municipal Committees Damages to the works JKPCC RoadsDamages to the Roads Total: DETAILS OF FUNDS PROJECTED BY VARIOUS DEPARTMENT FOR RESTORATION OF DAMAGED PUBLIC INFRASTRUCTURE AND AMOUNT RECOMMENDED BY SOP COMMITTEE AFTER RANDOM VERIFICATION OF DAMAGED INFRASTRUCTURE. Rs.in lacs ()()
Public Health Engineering (Rs.in lacs) Number of Schemes in the District242 Number of Schemes damaged193 Number of works taken up180 Number of works completed174 Number of works pending19 Amount required for temporary restoration Rs
Roads damaged in District70 No. of Roads Restored in the District70 Amount required for temporary restorationRs Roads and Bridges (Rs.in lacs)
No. of Roads Damaged 58 Roads Restored 56 Amount required for temporary restoration Rs C PMGSY: (Rs.in lacs)
No. of Trangries /wooden foot bridges damaged 09 Amount required for temporary restoration Rs D. FOREST: (Rs.in lacs)
Status of Temporary restoration of damages Public Infrastructure. No.of works damaged.No. of works taken.No of works completed No.of works pending. 542 wooden poles uprooted wooden poles 417 Km HT/LT loosened/ snapped conductors 86 Transformers. 140 Km conductors replacement (HT) 33 KV line 10 No. 33 /11 KV R/Stn. 542 wooden poles uprooted wooden poles 417 Km HT/LT conductors 86 Transformers. 140 Km conductors replacement (HT) 33 KV line 10 No. 33 /11 KV R/Stn. 222 wooden poles uprooted wooden poles 417 Km HT/LT conductors 36 Transformers. 21 Km conductor (HT/LT) 33 KV line 10 No. Temp. restored. 33 /11 KV R/Stn km Stabilization of works of lines under progress Stabilization of R/Stn.under progress. POWER
No. of works damaged63 No. of works taken up51 No. of works completed46 No. of works pending17 Amount required for temp. RestorationRs IRRIGATION (Rs.in lacs)
No. of works damaged34 No. of works taken up34 No. of works completed11 No. of works pending23 Amount required for temp. RestorationRs Flood Control (Rs.in lacs)
No. of school buildings/Kitchen sheds/toilet Blocks R/Wall, B/Walls damaged. (6 fully damaged and 66 partially Damaged) 72 Amount required for Temp. Restoration Rs EDUCATION (Rs.in lacs)
No. of buildings damaged 04 Amount required for temp. Restoration Rs HEALTH (Rs.in lacs)
No. of buildings / Community Works damaged 2589 Amount required for temp. Restoration Rs RURAL DEV. DEPARTMENT (Rs.in lacs)
Water intake channel of Fish Farm Bheja Bhaderwah damaged. -- Amount required for temp. Restoration Rs.2.00 FISHRIES (Rs.in lacs)
No. of works damaged 73 No. of works Restored 28 Amount required for temp. Restoration Rs MUNICIPAL COMMITTEES (Rs.in lacs)