Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.

Slides:



Advertisements
Similar presentations
DRAFT Shipperless and Unregistered sites 3 November 2010.
Advertisements

Non-code User Pays. 2 What we will cover Background Current Services Governance Arrangements What is working well What is not working as well.
Application of User Pays Principles to Existing Service Lines 22nd November 2006.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
THEFT OF GAS TEAM. THEFT OF GAS TEAM PO Box 6803, 31 Homer Road, Solihull, B91 3LT Fax : Free Phone : Seamus Rogers Account.
Industry Shipperless & Unregistered Working Group Wednesday 18 th April 2012.
Reasonable Endeavours Claims Distribution Workstream MOD231 16/12/08.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
Energy Networks Association Root cause solution for unregistered sites / MPRN creation David Mitchell 1 st November 2013.
User Admission Steps Legal Opinion Obtain copy of Uniform Network Code
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
Shipperless & Unregistered Workgroup Friday 1 st November 2013.
Siemens Energy Services Ltd Revenue Protection Services David Bown Revenue Services Product Manager Siemens Energy Services Ltd 26th August 2004.
Xoserve sense checks & validation Reasonable Endeavours Claims.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Shipperless & Unregistered site working group Recommendations to Process Backlog Shipper Activity Monthly report No interest - orphaned Widened identity.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
18th May 2009 energynetworks.org 1 A PRESENTATION BY ERIKA MELÉN OF THE ENERGY NETWORKS ASSOCIATION Report from the ENA/ERA Theft of Energy Working group.
P274 – National Revenue Protection Service. 2 Principles of X-industry gas theft service The impact on the participants will be revenue neutral (no supplier.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve.
Shipperless & Unregistered Workgroup Friday 15 th March 2013.
1 Industry Shipperless &Unregistered Working Group Wednesday 5 th May 10.30am at xoserve.
Shipperless & Unregistered Workgroup Monday 1 st July 2013.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
UNC Review Group 0178 National Grid Distribution “Reclassification of SSP to Domestic only” Review Group Meeting – 22 February 2008 Chris Warner.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Theft: Best practice 15 th June Best practice should extend across the process Investigation and detection. Data collection. Reconnection. These.
Theft of Gas RbD fund reallocation model Gareth Evans.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
PN UNC Workgroup iGT Services 7 th February 2012.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
1 Industry Shipperless &Unregistered Working Group Wednesday 7th July 10.00am at xoserve.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Références, date, lieu Xoserve Service Model – Shipper’s View Total Gas and Power Ltd Gaz de France ESS.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Current and New process Current Process New Process Response: Does not want service but live supply -Passed into Orphaned Report Intends to confirm – Remains.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.
1 Industry Shipperless &Unregistered Working Group Wednesday 8th September 10.00am at xoserve.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
UNC Modification Proposal 0192 National Grid Distribution Proposal 0182: “ Introduction of DNO obligations to facilitate resolution of unresolved USRVs”
Industry Dialogue on xoserve Services 14 th September 2007.
Connected System Exit Points Options for strategic regime change Chris Warner.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
IGT and Shipper Workgroup meeting 28 th February 2011.
David Addison / Steve Deery
Gas Act Schedule 2B “Gas Code”
Chris Warner Network Code Manager
Xoserve On-Boarding Organisation Checks
CSS Update for CoMC 19th September 2018
Theft on Shipper-less Sites
Chris Warner Network Code Manager
Industry Shipperless & Unregistered Working Group
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Theft: Shipperless Arrangements
User Pays Principles and Governance
Shipperless/Unregistered Sites
Development Work Group 194
Presentation transcript:

Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager

2 Unregistered Sites  An “Unregistered Site” is:  new Meter Point Reference Number in Transporters’ Supply Point Register (SPR)  no User Registration (or prior registration) in SPR  legitimate status where no gas is flowing (usually ‘siteworks’ in process)  illegitimate status where gas is being consumed i.e. potential that gas has been illegally taken whilst in the course of conveyance  no supply contract between supplier and consumer (NB: Ofgem has the view that a Supply Contract is not ‘valid’ if there is no User Registration in SPR)  socialised risk (energy reconciled via RbD)  Shipperless Sites are not within scope of this agreement

3 Transporter Obligations  Transporters Licence Condition 7 obligations  to investigate where it appears gas is taken whilst it is ‘in the course of conveyance’  to use reasonable endeavours to recover the value of the gas taken in such circumstances (Gas Act Sch 2B provides legal ability to do so)  ‘ in the course of conveyance’  where a supply contract (or a deemed supply contract) is in place, any point upstream of the ECV  where there is no supply contract (or deemed supply contract) is in place, at any point

4 NGD / BGT Agreement (Pilot) – BGT to Provide Service on behalf of NGD  information from existing xoserve Unregistered Sites (“Orphaned”) reporting  for ‘shipper activity’ MPRNs, relevant shippers have confirmed ‘no interest’ or not responded to request  undertake investigation (LC7) on behalf of NGD to  establish whether gas is being consumed  establish if a supply contract is in place  BGT to comply with requirements in respect of treatment of vulnerable customers  if gas is being consumed and there is no supply contract in place  use reasonable endeavours (LC7) on behalf of NGD to recover the value of the gas costs (NB no investigation costs)  notify consumer that it must enter into a supply contract with a supplier  possible future service to undertake disconnection on behalf of NGD where instructed to do so by NGD

5 BGT Service – Treatment of Cost and Revenues  Value of gas costs recovered by BGT on behalf of NGD are returned to NGD  NGD pays BGT for investigation and cost recovery services  BGT charges required to be reasonable and cost reflective  NGD treats revenue recovered and investigation and costs recovery charges in accordance with Licence Condition 7(3) Scheme  Changes made to Licence “Transportation Revenue” to maintain revenue neutrality

6 BGT Service – Status  Ofgem is aware of proposal and following various challenges dialogue has taken place to ensure arrangement is acceptable  NGD and BGT intends to commence pilot as soon as possible  bilateral arrangements to be finalised  operational processes/interfaces to be concluded

7 BGT Service – Next Steps  Costs and revenues to be monitored on an ongoing basis  Pilot likely to commence Q and last 12 months  At this point review to be conducted and decision taken on whether to extend duration of arrangement  Potential success criteria  volume of consequential User registrations  proportion of invoiced charges recovered  extent to which costs recovered exceed service charge  residual theft detection

8 BGT Service – Next Steps  Comments?  To National Grid/BGT  To Ofgem